{ "question": "What factors have the biggest impact on schedule for ground-up construction?", "answer": "Key drivers include permitting timelines, availability of trades and materials, complexity of the design and site, change orders, and inspections or utility connections that can only happen in a specific sequence. rsvc+2" }