Stephen F. Austin to Preston Gilbert Dr—•
1827
To hauling 5 loads of lumber from the San Bernard to San Felipe at
$16.00 per load-------$80.00
Cr. by——------27.94
To Balance Due----52.06
settled in a/c with S. F. Austin 1st March 1832
Preston Gilbert