METADATA last updated: 2025-12-15 RT updated metadata after BA fixed inconsistencies file_name: Site Checklist - Portola.md file_date: 2022-09-08 title: Test Site Checklist - Portola category: guides subcategory: test-site tags: source_file_type: gdoc xfile_type: docx gfile_url: https://docs.google.com/document/d/1VjrKcGU7XtUMZuwqIMw1UJnDdK1PEeQb2AfyvthtE6U xfile_github_download_url: https://raw.githubusercontent.com/FocusOnFoundationsNonprofit/floodlamp-archive/main/guides/test-site/Site%20Checklist%20-%20Portola.docx pdf_gdrive_url: https://drive.google.com/file/d/1WKJ43rBcsk0E8T4wQjf85n9E5rbS5U53 pdf_github_url: https://github.com/FocusOnFoundationsNonprofit/floodlamp-archive/blob/main/guides/test-site/Site%20Checklist%20-%20Portola.pdf conversion_input_file_type: docx conversion: pandoc license: CC BY 4.0 - https://creativecommons.org/licenses/by/4.0/ tokens: 974 words: 637 notes: summary_short: The Test Site Checklist – Portola provides daily, weekly, and site-readiness checklists for running FloodLAMP testing at the Portola location, including setup, cleaning, consumables/reagent verification, tube intake at drop-off points, run execution, rerun handling, and end-of-day shutdown. It standardizes operations and required Slack communications to ensure consistent testing workflow, inventory updates, and equipment readiness. CONTENT ## Testing Checklist - Portola v1.1 Last updated: 9-8-2022 by GW For all ***communication*** steps specified below, use the Slack channel: **\# testing-alpine\_portola** ### Before Arrival - Confirm Heaters turned on (text Randy & Theresa if confirmation not received by 8am) ### Upon Arrival Time: - Review freezer sensor data to ensure no thawing occurred - Prepare fresh 10% Bleach Solution, preferably daily, but at least every 3 days - Clean Inactivation Table thoroughly - first with 10% bleach, then with 70% ethanol or IPA - Set up Inactivation Table - Check sufficient 1XISS (or make) and Rxn Mix (frozen or source tubes), and *not expired* - Verify sufficient test consumables for usage (1 mL tips, 10 uL tips, gloves, wipes, aluminum foil) - Verify that you have expected tubes from staff ### At Carillon / Ormondale Time: - Travel to each class and set up at drop off point - Intake Collection tubes already dropped off - Note any anomalies (e.g., uncollected tubes) - Continue intaking as participants drop off tubes until cut-off time 9:05am - ***Communicate*** any intake anomalies (QR code and anomaly description) ### Upon Return to Portola Time: - Turn off air purifiers before beginning the test procedure. Keep the door closed - Double check water bath / heater is up to temperature (at least 95°C) before starting to process samples - Run test - When on amp, ***communicate*** time expected to remove from amp - Check with FL Program Admin if positives are known or unknown. Rerun if unknown - ***Communicate*** Result image & lookup map Time: - Mark result on lookup map as a circled ‘P’ or ‘I’ at the end of the tube code - Wait 5 mins for confirmation of whether any positives are known positives - ***Communicate*** re-run plan for all inconclusives and unknown positives I.e.: “re-running 1 positive, 1 inconclusive in triplicate” - Re-run test - ***Communicate*** re-run results ETA - ***Communicate*** final results and time Time: - Return cold blocks to freezer - Return pipettes, tip boxes, racks - Check that all thawed inactivation solution bottles & vials are covered in foil - Discard sample tubes from refrigerator (neg. in trash, pos. in bag in bottom freezer) - Turn off heaters - Empty and clean tip buckets with bleach and ethanol ## Weekly Checklist - Portola v1.1 Last updated: 9-8-2022 by GW - Change water in water bath weekly (at Alpine) - Preferable to use distilled water - Update complete Inventory, ***communicate*** that Inventory tab has been updated - Audit freezer sensor data for anomalies - Check Expiration dates of reagents - Empty trash bins - OPTIONALLY: Prepare reaction tubes for the week, and freeze - AS NEEDED: receive deliveries - Use included ship list to verify contents - ***Communicate*** any discrepancies - Update Inventory with new materials ## Site Readiness Checklist - Portola v1.1 Last updated: 9-8-2022 by GW The following should be in place at all times to ensure smooth operation of the lab: - Glove boxes BOTH in assay prep area AND amplification area (keep separate glove supplies) - Wipes present (one active, plus extra on supply shelf) - Empty Tip box filled with strip tubes (fill tip box + half source box) - Falcon Tubes Filled with strip tube caps (two full falcon tubes, + half source box) - 1.5mL tubes closed and in cleaned, labeled cryobox (1 active box, Next box fully ready) - At least 5 blank Amp run forms, and at least 1 spare of both table forms (1X ISS & RM) - Pens and markers clean and in proper place - Pens tested and functional - Spare tube of inactivation solution in freezer - Freezer thermometer tested and functional - Lightbox battery charged and functional (if applicable) - Old non-significant samples clear from fridge - Tip buckets empty