# Amending specs — brainstorming's shared tail Entry: the accepted change is built and verified (spine step 8). Saves: the durable spec graph. Ends: the workflow. The specs stay the ground truth only if every change lands in them. This is your job, not a round of approvals: do it yourself, and let the user see the result in the Changes review. Read the **writing-specs** concept skill first — its bar holds for every edit here. 1. **Find what changed in the specs' terms** — from the task-spec and the actual diff, not the plan: - the goal doc, when a capability was added or removed or a principle overturned; - `architecture.md`, when topology, a cross-module decision, or a repo-wide invariant moved; - the owning module or submodule `SPEC.md`, for a responsibility, boundary, contract, decision, or known limitation — and a new spec for a genuinely new module; - for a bug classified silent or wrong, the spec that should have stated the intended behavior. 2. **Amend top-down** — goal → architecture → modules — without asking the user to approve the list or the edits. `spec_create` for a new spec, `spec_update` for frontmatter, `edit` for prose. Write the decisions and the *why* the code cannot show, once, in the spec that owns them; link the rest by `id`. Unconfirmed assumptions are marked unconfirmed where they stand. 3. **Check against reality.** Each amended spec matches what was built, not what was planned; the specs you touched don't contradict each other or use a term two ways. Run `spec_validate` and fix what it reports. 4. **Nothing durable changed?** (A bug classified right, a change the specs already describe.) Then make no edits — never invent content to show activity. 5. **Report in a line or two:** which specs changed, by name, and any unconfirmed assumption left in them. No per-file narration. 6. **Retire the task-spec** — once its durable content is in the tree, set its `status: done` with `spec_update`. Never delete it: it stays in the user's Artifacts tab, and spec search skips a finished task-spec. ## Ending This workflow ends here. PR lifecycle work, if requested, then enters **shipping-a-pr** separately.