Meridian Commerce Center — development pro forma "Synthetic sample project. Figures are internally consistent, not market data." USES OF FUNDS,Amount,$/gross sf,% of total Land acquisition,9000000.00,33.58,0.0911 Hard cost,64320000.00,240.00,0.6509 Hard cost contingency (5%),3216000.00,12.00,0.0325 Soft cost (24%),16208640.00,60.48,0.1640 Construction period interest,6077363.04,22.68,0.0615 Total development cost,98822003.04,368.74,1.0000 SOURCES OF FUNDS,Amount,% of total Construction loan,57316761.76,0.5800 Sponsor equity,41505241.28,0.4200 OPERATING BASIS,Value Net rentable area (sf),233160 Rent $/sf/yr,54.0 Vacancy,0.11 Opex $/sf/yr,16.0 STABILIZED OPERATIONS,Amount Effective gross revenue,11205669.60 Operating expense,3730560.00 Net operating income,7475109.60 RETURNS,Value Yield on cost,0.075642 Exit capitalisation rate,0.067500 Spread over exit cap (bps),81 Stabilised value,110742364.44 Development profit,11920361.40 Unlevered IRR,0.116702 Levered IRR,0.146714 Equity multiple,2.333 CASH FLOW,Year 0,Year 1,Year 2,Year 3,Year 4,Year 5,Year 6,Year 7 Unlevered,-98822003.04,7680675.11,7891893.68,8108920.76,8331916.08,8561043.77,8796472.47,140689803.34 Levered,-41505241.28,2550824.93,2762043.50,2979070.58,3202065.90,3431193.59,3666622.29,78243191.40