Northbridge Data Hall — development pro forma "Synthetic sample project. Figures are internally consistent, not market data." USES OF FUNDS,Amount,$/gross sf,% of total Land acquisition,7900000.00,125.40,0.0619 Hard cost,91350000.00,1450.00,0.7162 Hard cost contingency (5%),4567500.00,72.50,0.0358 Soft cost (19%),18224325.00,289.27,0.1429 Construction period interest,5500730.16,87.31,0.0431 Total development cost,127542555.16,2024.49,1.0000 SOURCES OF FUNDS,Amount,% of total Construction loan,70148405.34,0.5500 Sponsor equity,57394149.82,0.4500 OPERATING BASIS,Value IT load (kW),12000 Rent per kW / month,125.0 Vacancy,0.05 Opex ratio,0.4 STABILIZED OPERATIONS,Amount Effective gross revenue,17100000.00 Operating expense,6840000.00 Net operating income,10260000.00 RETURNS,Value Yield on cost,0.080444 Exit capitalisation rate,0.067500 Spread over exit cap (bps),129 Stabilised value,152000000.00 Development profit,24457444.84 Unlevered IRR,0.128834 Levered IRR,0.164511 Equity multiple,2.540 CASH FLOW,Year 0,Year 1,Year 2,Year 3,Year 4,Year 5,Year 6,Year 7 Unlevered,-127542555.16,10542150.00,10832059.13,11129940.75,11436014.12,11750504.51,12073643.38,193104510.77 Levered,-57394149.82,4123570.91,4413480.04,4711361.66,5017435.03,5331925.42,5655064.29,116537526.34