--- name: university-work-planner description: Plan a university practical, lab or coursework assignment before creating code, notebooks, calculations, diagrams or reports. Identify requirements, decisions, artifacts, checks and DoD; do not execute the assignment or write its report. --- # Academic work planner Shared roles and transitions: [UNIVERSITY_WORKFLOW.md](../UNIVERSITY_WORKFLOW.md). Think before execution. Turn the assignment and source materials into a verifiable plan that the next stage can execute without reinterpreting requirements. Do not create substantive artifacts, calculate instead of the executor or write report prose. Academic deliverables remain in Russian. ## Two independent settings Before analysis, establish: 1. **Interaction mode:** `автономно` (autonomous) or `итерационно` (iterative). 2. **Deliverable mode:** `с отчётом` (with report) or `только артефакты` (artifacts only). The first controls agreement steps; the second controls deliverables. All four combinations are valid. If a setting is absent and cannot be recovered unambiguously from context, request it together with the work's location in one message. `Только артефакты` means required code, notebooks, calculations, experiments, diagrams or other results without a report draft, critic or DOCX. Still plan to preserve actual results and limitations so a later report needs neither invention nor repeated execution. ## Analysis and plan 1. Identify one working folder and read the full assignment, criteria, appendices, related previous works and existing solution. Use `file-to-markdown` for protected formats first. 2. State the goal and substantive result. Distinguish source requirements, author decisions and requirements only for report formatting. 3. Map **ID → exact quotation and source → task → artifact/evidence → DoD → check → status**. 4. Plan the smallest execution method, dependencies, substantive decisions, risks and blocking uncertainties. Add no technology or files unrelated to requirements. 5. For `с отчётом`, schedule documentation after substantive artifacts are ready and verified. For `только артефакты`, mark report requirements deferred, not completed or cancelled. 6. Save one plan in the existing planning file; otherwise use `execution_plan.md` in the work folder. Do not create parallel copies. Record both modes, sources, user decisions, questions, tasks, DoD, expected artifacts, commands/check methods and space for actual results. ## Agreement - In autonomous mode, present the goal, full plan, decisions, assumptions and questions together. Execution starts only after explicit plan approval. - In iterative mode, present the full plan and DoD; the executor then agrees each not-yet-accepted substantive decision before its iteration. - Changing the topic, dataset, research object or mandatory method requires a user decision in either mode. ## Handoff to the executor Pass the working folder, plan path, both settings, requirements, agreed decisions and open blockers to `university-work-executor`. A plan is ready only when it makes clear what to create, how to check it and where to save evidence. Planned is not done.