--- title: Combined Industrial Centerlines release notes for upgrades from Zurich to Australia description: Consolidated page of all release notes for Industrial Centerlines from Zurich to Australia. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/delta-zurich-australia/australia-zurich-industrialcenterlines-release-notes.html release: australia topic_type: reference last_updated: "2026-10-09" reading_time_minutes: 4 breadcrumb: [Products combined by family] --- # Combined Industrial Centerlines release notes for upgrades from Zurich to Australia Consolidated page of all release notes for Industrial Centerlines from Zurich to Australia. ## How to use this page To help you prepare for your upgrade, we have combined the cross-family Industrial Centerlines release notes onto one page. Read this summary of the new features, changes, and updated information for your product from Zurich to Australia. **Tip:** If there were no updates for a release notes section in a certain family release, we included a short note for your reference. For example, if a product did not have any updates in Tokyo, the row says "No updates for this release." ## Important information for upgrading Industrial Centerlines to Australia Before you upgrade to Australia, review these pre- and post-upgrade tasks and complete the tasks as needed.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## New features Between your current release family and Australia, new features were introduced for Industrial Centerlines.
Release Release notes
Zurich No updates for this release.
Australia - **[Setting definitions on operational equipment](https://www.servicenow.com/docs/access?context=icw-setting-definitions-and-value-types&family=australia&ft:locale=en-US)** Define each configurable parameter directly on the Settings tab of an equipment record, with type-specific fields for choice and numeric range settings and an optional effective date range. Setting definitions go through an approval workflow before they can be used in centerline tasks. Duplicate one or more definitions to reuse their configuration, and retire published definitions that are no longer valid. - **[Setting plans and setting specifications](https://www.servicenow.com/docs/access?context=icw-setting-plans-and-specifications&family=australia&ft:locale=en-US)** Group the standard values for a piece of equipment in a setting plan, and define the target values and limits for each setting definition in a setting specification. The specification form shows only the fields that apply to the setting type, such as limit levels for a numeric range or a choice target for a choice setting. Duplicate a specification to reuse its values. - **[Centerline standards](https://www.servicenow.com/docs/access?context=icw-centerline-standards&family=australia&ft:locale=en-US)** Create a centerline standard from the Standards hub to define the settings that operators check during a centerline audit. Use the condition builder to select the setting definitions for the standard, and set the material scope that's available when operators run the task on mobile. Centerline standards follow the same approval, versioning, and template workflow as Industrial Guided Tasks standards. - **[Centerline tasks in the Digital Factory Workspace](https://www.servicenow.com/docs/access?context=centerline-tasks-workspace&family=australia&ft:locale=en-US)** View, filter, and manage the tasks generated from centerline standards in a dedicated list in the Digital Factory Workspace. Authorized users can edit task data fields and assign a task to themselves using the Assign to me action. Centerline tasks are executed in the Industrial Connected Workforce Mobile Experience.
## Changes Between your current release family and Australia, some changes were made to existing Industrial Centerlines features.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## Removed Between your current release family and Australia, some Industrial Centerlines features or functionality were removed.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## Deprecations Between your current release family and Australia, some Industrial Centerlines features or functionality were deprecated.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## Activation information Review information on how to activate Industrial Centerlines.
Release Release notes
Zurich No updates for this release.
Australia - **Activation information** Industrial Centerlines doesn't have its own SKU. It's included in the ICW Advanced SKU. You can request ICW Advanced from the ServiceNow Store. Visit the [ServiceNow Store](https://store.servicenow.com/sn_appstore_store.do#!/store/home) to view all the available apps, and for information about submitting requests to the store. For cumulative release notes information for all released apps, see the [ServiceNow Store version history release notes](https://www.servicenow.com/docs/access?context=sn-store-release-notes&family=australia&ft:locale=en-US).
## Additional requirements If any additional requirements were introduced or changed for Industrial Centerlines we have noted them here.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## Browser requirements If any specific browser requirements were introduced or changed for Industrial Centerlines we have noted them here.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## Accessibility information Review details on accessibility information for Industrial Centerlines, such as specific requirements or compliance levels.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## Localization information If there are specific localization considerations for Industrial Centerlines we have noted them here.
Release Release notes
Zurich No updates for this release.
Australia No updates for this release.
## Highlight information If there are specific highlight considerations for Industrial Centerlines we have noted them here.
Release Release notes
Zurich No updates for this release.
Australia - Standardize equipment base conditions by defining the operator-modifiable settings for each piece of equipment, with value types such as numeric range, numeric target, choice, or text. - Establish acceptable values, ranges, and targets for each setting through setting specifications grouped in setting plans. - Automate confirmation scheduling with centerline standards that define which settings to verify and when. - Reduce quality and reliability losses by having operators confirm settings during centerline tasks, and create deviation tasks when a setting doesn't conform to the standard. See [Industrial Centerlines](https://www.servicenow.com/docs/access?context=icw-centerlining-overview&family=australia&ft:locale=en-US) for more information.
**Parent Topic:**[Products combined by family](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/delta-zurich-australia/rn-combined-intro.md)