--- title: Action form description: The following table describes the field values for the Action form. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/action-form.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: reference last_updated: "2026-09-03" reading_time_minutes: 2 breadcrumb: [Reference, Digital Factory Workspace, Industrial Connected Workforce] --- # Action form The following table describes the field values for the Action form.
| Field | Description |
|---|---|
| Short description | Brief description of the action. |
| Description | Description of the action and its purpose. |
| Functional location | Industrial facility work area where the action is completed. The location is defined using the ISA-95 standard. This field is automatically set based on the logged-in user's worker profile. |
| Equipment | Machine to which the action relates. This field is automatically set if equipment is specified in the standard. |
| Origin | Task from which the action originates. |
| Opened by | User opening the action. This field is automatically set by the system and can’t be modified. |
| Assignment group | Team or department responsible for completing the task. |
| Assigned to | User that the action should be assigned to.**Note:** A user with the `action_user` role can assign an unassigned action to themselves. This role can't reassign an action that's already assigned to another user. |
| Additional assignee list | List of users to be notified or contributing to the task, but not as the primary assignee. Available options vary depending on the selected functional location or assignment group. |
| Impact | Measure of effect the action has on an industrial process. Options are:- 1 - Safety - 2 - Quality - 3 - Reliability - 4 - Operations - 5 - Other |
| Urgency | Measure of how long the action can be delayed until there's a significant impact on an industrial process. Options are:- 1 - Critical - 2 - Important - 3 - Routine - 4 - Not urgent |
| Priority | Priority of the action. This field is automatically set based on impact and urgency. Options are:- 1 - Direct - 2 - This shift - 3 - Today - 4 - Within 7 days - 5 - Within 30 days For more details, see [Priority matrix for actions](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/priority-matrix-actions.md). |
| Due date | Date by which the task should be executed. If you don't set the due date, it is calculated based on priority when you save the form. For more details, see [Due date calculation](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/due-date-calculation.md). |
| Escalate to | User that the action should be escalated to. |