--- title: Breakdown analysis form description: The following table describes the fields for the Breakdown analysis form. Most questions require a written response rather than selecting from predefined options. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/breakdown-analysis-form.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: reference last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Reference, Digital Factory Workspace, Industrial Connected Workforce] --- # Breakdown analysis form The following table describes the fields for the Breakdown analysis form. Most questions require a written response rather than selecting from predefined options. |Field|Description| |-----|-----------| |Review information: When did the breakdown occur?|Date and time the issue was first identified in the format YYYY-MM-DD HH:mm:ss| |Active material|The substance or item being processed or handled when the breakdown occurred.| |What was the initial observation?|First signs or symptoms noticed before diagnosis.| |Provide additional explanation for the workaround.|Details on how the workaround addressed the issue temporarily.| |Was a temporary workaround applied?|Indicate if a short-term fix was used before full repair.| |Input fix details: What was done to restore operation?|Actions taken to bring the equipment back to working condition.| |Who performed the repair?|Name or team responsible for executing the fix.| |Was the fix temporary or permanent?|Option to specify whether the solution was a lasting repair or a temporary fix.| |When has the equipment been returned?|Date the equipment was handed back after repair.| |Has the equipment been returned to service?|Option to confirm if the equipment is now operational.| |Failure mode|Classification of failure types associated with equipment behavior and process conditions.| |What was the total downtime duration?|Total time the equipment wasn’t operational.| |Action results: What corrective action was implemented?|Steps taken to resolve the root cause of the breakdown.| |Was this breakdown similar to past events?|Option to indicate if this issue resembles previous failures.| |What event?|Reference to the past event or breakdown for comparison.| |What were the estimated costs?|Approximate financial impact of the breakdown and repair.| |Follow-up actions|Button to create a follow-up action related to the analysis.| |Monitoring: Is all relevant documentation attached \(e.g., photos, work orders, other attachments\)?|Option to confirm if supporting materials have been uploaded.| |Have all follow-up actions necessary been created?|Option to make sure that tasks for further investigation or prevention are logged.| |Have all questions been answered accurately?|Option to verify completeness and correctness of the form.| |Was standard maintenance procedure updated?|Option to indicate if maintenance protocols were revised after the breakdown.| **Parent Topic:**[Digital Factory Workspace reference](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/digital-factory-workspace-reference.md)