--- title: Centerline task form description: Field descriptions for the centerline task form, including priority options, assignment, location, and scheduling fields. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/centerline-task-form.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: reference last_updated: "2026-10-02" reading_time_minutes: 1 breadcrumb: [Industrial Centerlines, Reference, Digital Factory Workspace, Industrial Connected Workforce] --- # Centerline task form Field descriptions for the centerline task form, including priority options, assignment, location, and scheduling fields.
| Field | Description |
|---|---|
| Number | System-generated unique number for the task. |
| Priority | Options are:- 1 - Direct - 2 - This shift - 3 - Today - 4 - Within 7 days - 5 - Within 30 days - 6 - Unplanned |
| Short description | Auto-populated with the name of the standard from which the task is created. |
| Description | Additional information about the task. |
| Assignment group | Group of users that the task can be assigned to. |
| Assigned to | User that the task is assigned to. |
| Active material | Material that the task applies to. |
| Functional location | Industrial facility work area where the task is to be completed. |
| Equipment | Machine to which the task relates. |
| Due date | Date by which the task is to be executed. |
| Planned start | Planned start of the task execution. |
| Planned end | Planned end of the task execution. |
| Attachments | Files that support the task. The maximum file size is 1024 MB. |