--- title: Copy an Industrial Guided Task standard description: Copy an Industrial Guided Task \(IGT\) standard to reuse it as a template, without having to draft the entire standard from the start. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/copy-industrial-guided-task-standard.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: task last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Industrial Guided Tasks, Use, Digital Factory Workspace, Industrial Connected Workforce] --- # Copy an Industrial Guided Task standard Copy an Industrial Guided Task \(IGT\) standard to reuse it as a template, without having to draft the entire standard from the start. ## Before you begin Role required: sn\_icw\_igt.standard\_author ## About this task The standard can be in any state when it’s copied. The entire content of the standard is duplicated, including the smart assessment template. However, the scheduled plan associated with the standard and any versioning information aren't included in the copy. ## Procedure 1. Navigate to the **Standards hub**. 2. Select the standard that you want to create a copy of. 3. Select the three-dot menu in the top corner and select **Use as template for new standard**. The short description of the copied standard is the original one with ‘Copy of’ added at the beginning. 4. Change the short description or other fields as necessary. 5. Select **Save**. ## Result The tile for the newly created copy of the standard appears in the Standards hub in the Draft state. **Parent Topic:**[Using Industrial Guided Tasks](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/using-industrial-guided-tasks.md)