--- title: Create an Industrial Guided Task from the Standards hub description: Create an Industrial Guided Task \(IGT\) from an IGT standard. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/create-industrial-guided-task.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: task last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Industrial Guided Tasks, Use, Digital Factory Workspace, Industrial Connected Workforce] --- # Create an Industrial Guided Task from the Standards hub Create an Industrial Guided Task \(IGT\) from an IGT standard. ## Before you begin Role required: sn\_icw\_igt.user or sn\_icw\_igt.expert **Note:** The sn\_icw\_igt.expert can put tasks on hold or cancel them. ## Procedure 1. Navigate to the **Standards hub**. 2. Select the published standard for which you want to request a task. 3. Select **Create task**. 4. On the Guided Task form, fill in the fields. For a description of the field values, see [Industrial Guided Task form](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/industrial-guided-task-form.md). The **Priority** field defaults to **2 - This shift**. You can change it if needed. 5. Select **Save**. ## Result The new industrial guided task is displayed in the following lists: - List of all tasks - List of industrial guided tasks - The **Open tasks** tab for an Industrial Guided Task standard - The **My tasks** list, if the task is assigned to you **Parent Topic:**[Using Industrial Guided Tasks](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/using-industrial-guided-tasks.md)