--- title: Define a production day description: Define a production day for your organization within Industrial Connected Workforce. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/define-production-day.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: task last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Prerequisites, Configure, Digital Factory Workspace, Industrial Connected Workforce] --- # Define a production day Define a production day for your organization within Industrial Connected Workforce. ## Before you begin Role required: sn\_icw.application\_admin or sn\_icw.admin ## Procedure 1. Navigate to **All** > **System Scheduler Schedules** and find the parent schedule that you need. 2. Navigate to the **Schedule Entries** tab and select **New**. 3. On the Schedule Entry form, fill in the fields. - For the detailed description of schedule entry fields, see [Schedule entry fields](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/platform-administration/r_ScheduleEntryFields.md). - Set the end time to one second less than a full hour to avoid overlap. - The expected value for **Repeats** is **Daily**. 4. Select **Submit**. ## Result The production day has been created successfully and is displayed in the **sn\_icw\_industrial\_calendar.list** list. The production day calendar record automatically includes a reference to the source schedule in the **source\_schedule** field. This reference is set when the calendar is generated and is system-managed. Non-admin users cannot modify this field. **Parent Topic:**[Setting up prerequisites for Digital Factory Workspace](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/setting-up-prerequisites-digital-factory-workspace.md)