--- title: Deviations life cycle description: The deviation life cycle is the list of states that a deviation can go through. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/deviations-life-cycle.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: concept last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Deviation Management, Industrial Workflows, Use, Digital Factory Workspace, Industrial Connected Workforce] --- # Deviations life cycle The deviation life cycle is the list of states that a deviation can go through. The deviation life cycle has the following states: - Found - Open - Scheduled - Fixed - Closed - Canceled Once the deviation is fixed, it can be closed or reopened by a deviation expert. **Note:** Deviations in the Fixed state are automatically moved to Closed after the number of days defined by the system property **sn\_icw.deviation\_close\_after\_days**. The default value is seven days. Only the resolution and resolution code are still editable. If it's in any other state, it can be canceled. **Note:** The actions Close, Cancel and Reopen are restricted to users with the sn\_icw.deviation\_expert role, while other actions are supported for both the sn\_icw.deviation\_user and sn\_icw.deviation\_expert role. You can manage deviations, such as bulk assign from the list view, which is only available in the Workspace. **Parent Topic:**[Deviation Management](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/industrial-deviation-management.md)