--- title: Industrial Guided Task standard and task life cycles description: A life cycle is the list of states that an Industrial Guided Task \(IGT\) standard or task can go through. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/industrial-guided-task-life-cycle.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: reference last_updated: "2026-03-12" reading_time_minutes: 2 breadcrumb: [Industrial Guided Tasks, Reference, Digital Factory Workspace, Industrial Connected Workforce] --- # Industrial Guided Task standard and task life cycles A life cycle is the list of states that an Industrial Guided Task \(IGT\) standard or task can go through. ## Industrial Guided Task standard states |State|Description| |-----|-----------| |Draft|The standard can be edited.| |Review|Approval has been requested and the standard is being reviewed. The standard cannot be edited.| |Published|The standard is active and published. The standard can be requested, which means a task can be created. The standard cannot be edited.| |Retired|The standard is inactive, read-only, and can’t be requested. The standard cannot be edited.| |Revised|End state. An older version that has been revised. The standard is available as read only for reference. The standard cannot be edited.| ## Industrial Guided Task standard approval states |State|Description| |-----|-----------| |Not yet requested|The standard has not been submitted for approval yet.| |Requested|The approval request has been submitted and is awaiting review. Any user from the assigned owner group can approve it for publishing.| |Approved|The request has been reviewed and officially approved. The state of the standard changes to Published.| |Rejected|The request was reviewed and not approved. When the request is rejected, the state of the standard moves back to Draft.| |Canceled|The request was withdrawn before a decision was made.| |No Longer Required|The request is obsolete due to changes.| ## Industrial Guided Task states
| State | Description |
|---|---|
| Ready | The task is created and ready to be picked up for execution. When a task transitions to this state, the system automatically captures the actual start time. On ICW mobile, the actual start is captured when the operator selects **Perform task**. |
| Work in Progress | The task is being executed on the shop floor. |
| On Hold | The task has been temporarily paused due to dependencies or external factors. |
| Submitted | The standard has been submitted, but some child sub tasks are still pending before the task is fully complete.When a task transitions to this state, the system automatically captures the actual end time and calculates the business duration. |
| Closed Complete | The task has been completed on the shop floor and submitted in the Workspace. |
| Closed Skipped | The task has expired. |
| Canceled | The task has been removed from the schedule. It won't be executed due to cancellation of the order, process changes, or other strategic decisions. |