--- title: Schedule plan form description: The following table describes the field values for the Schedule plan form. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/scheduled-plan-form.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: reference last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Industrial Standards, Reference, Digital Factory Workspace, Industrial Connected Workforce] --- # Schedule plan form The following table describes the field values for the Schedule plan form.
Field Description
Name Name for the standard schedule plan.
Table Type of standard. This field is automatically set and can’t be edited.
Functional location Work area where the standard is executed.
Task creation offset Lead time that defines how much earlier than the scheduled execution time a task should be created. Options are:- Default - Custom
Custom offset value Custom time period for how early tasks should be created before they start. This field is available if Task creation offset is set to Custom.
Active Option to make the system start scheduling standards. This field is selected by default.
Task values Task values for the schedule plan. Available options for this field depend on the value for the Table field. \(Optional\) The **Short description** field. **Note:** You can create a schedule plan without specifying task values such as a short description. This is useful when you want to create a schedule that applies broadly and the generated tasks inherit their descriptions from the manufacturing standard.
**Parent Topic:**[Industrial Standards reference](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/industrial-connected-workforce/digital-factory-workspace/industrial-standards-reference.md)