--- title: Schedule plan form description: The following table describes the field values for the Schedule plan form. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/industrial-connected-workforce/digital-factory-workspace/scheduled-plan-form.html release: australia product: Digital Factory Workspace classification: digital-factory-workspace topic_type: reference last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Industrial Standards, Reference, Digital Factory Workspace, Industrial Connected Workforce] --- # Schedule plan form The following table describes the field values for the Schedule plan form.
| Field | Description |
|---|---|
| Name | Name for the standard schedule plan. |
| Table | Type of standard. This field is automatically set and can’t be edited. |
| Functional location | Work area where the standard is executed. |
| Task creation offset | Lead time that defines how much earlier than the scheduled execution time a task should be created. Options are:- Default - Custom |
| Custom offset value | Custom time period for how early tasks should be created before they start. This field is available if Task creation offset is set to Custom. |
| Active | Option to make the system start scheduling standards. This field is selected by default. |
| Task values | Task values for the schedule plan. Available options for this field depend on the value for the Table field. \(Optional\) The **Short description** field. **Note:** You can create a schedule plan without specifying task values such as a short description. This is useful when you want to create a schedule that applies broadly and the generated tasks inherit their descriptions from the manufacturing standard. |