--- title: Update details of connected work items in CWM Boards description: Learn how to update the status, assigned to, and other details for the work items that are brought into your Collaborative Work Management Board through Connected work. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/it-business-management/collaborative-work-management/update-details-of-connected-work-items-in-cwm-boards.html release: australia product: Collaborative Work Management classification: collaborative-work-management topic_type: task last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Connect work, Use, Collaborative Work Management, Strategic Portfolio Management] --- # Update details of connected work items in CWM Boards Learn how to update the status, assigned to, and other details for the work items that are brought into your Collaborative Work Management Board through Connected work. ## Before you begin Role required: sn\_cwm.cwm\_user ## About this task The details of connected work items can be updated only from the side panel and not through in-line editing in the grid. However, deleting the connected work items from the Board will only remove them from the Board but won't delete the original record. ## Procedure 1. Navigate to **Workspaces** > **Collaborative Work Management**. 2. From a Space, select the Board with connected work items that you want to update. 3. From the List, Gantt, Kanban, or Sprint planning view, open the item details in the side panel. 4. Update the required details. You can also choose to open the original record form and update the details from there using the Detailed form view icon \(\[Omitted image "cwm-icon-detailed-form-view.png"\] Alt text: Detailed form view icon.\). \[Omitted image "cwm-connected-work-update.png"\] Alt text: Item details in side panel for connected work. 5. If you've edited the details in CWM, select **Update** or **Save**. ## Result The updated information is available on the work item both in CWM and in its parent application. ## What to do next To customize the fields that appear in the side panel for CWM tasks and connected work items, see [Configure the form view for CWM tasks and connected work items](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/it-business-management/collaborative-work-management/configure-form-view-for-cwm-tasks.md). **Parent Topic:**[Connected work in CWM](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/it-business-management/collaborative-work-management/unified-boards-for-connected-work-in-cwm.md)