--- title: Manage your portfolio backlog description: Manage, evaluate, prioritize, and sequence epics in your portfolio backlog. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/it-business-management/scaled-agile-framework-safe/manage-your-portfolio-backlog.html release: australia product: Scaled Agile Framework \(SAFe\) classification: scaled-agile-framework-safe topic_type: task last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [SAFe Board—Portfolio level, Portfolio SAFe, Scaled Agile Framework \(SAFe\), Strategic Portfolio Management] --- # Manage your portfolio backlog Manage, evaluate, prioritize, and sequence epics in your portfolio backlog. ## Before you begin Role required: sn\_portfolio\_safe.safe\_portfolio\_user ## Procedure 1. Navigate to **All** > **Scaled Agile Framework \(SAFe\)** > **SAFe Board**. 2. From the choice list at the top left corner, select the level as **Portfolio**. 3. Click the **Backlog** tab. 4. To add an epic at the bottom of the backlog. 1. Click **Create Epic**. 2. Specify the required details in the form and click **Submit**. 5. To add an epic while simultaneously deciding its order of implementation in the backlog. 1. Select an epic in the backlog. 2. Click **Create Epic**. 3. Specify the required details in the form and click **Submit**. The epic is created beneath the epic that was selected in the backlog. 6. To search for epics by their short descriptions, type a word in the search box and press **Enter**. 7. To arrange epics within the backlog, use either of the following options.
Action Description
**Using the drag feature** Point to an epic and drag it to the required position.
**Using the keyboard** 1. Press the **Tab** key. 2. After the desired epic is highlighted, press the **Tab** key. 3. After the \[Omitted image "draganddropicon.png"\] Alt text: Icon used to move the record icon is highlighted, press the **Enter** key. 4. After the \[Omitted image "plansprintactivity.png"\] Alt text: Icon used to move the record icon appears, use the up and down arrow keys. 5. To fix the position of the epic, press the **Enter** key.
If the backlog contains more than 50 epics, then a pagination control appears at the bottom of the list enabling you to navigate to the first, last, previous, or next page in the list. 8. To view the backlog as a standard platform list, click **View Standard List**. 9. To perform any action on a set of epics. - Select the required epics. - Click \[Omitted image "ellipsis.png"\] Alt text: Icon used to perform a single action on multiple features and select any of the following options: |Option|Description| |------|-----------| |**Move to top**|Epics are placed at the top of the backlog section.| |**Move to bottom**|Epics are placed at the bottom of the backlog section.| **Parent Topic:**[SAFe Board—Portfolio level](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/it-business-management/scaled-agile-framework-safe/portfolio-tabs.md)