--- title: Create SLO form description: Learn about the available fields for adding a service level objective \(SLO\) to Service Reliability Management. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/it-operations-management/service-level-objective-management/sr-create-slo-sli-form.html release: australia product: Service Level Objective Management classification: service-level-objective-management topic_type: reference last_updated: "2026-03-12" reading_time_minutes: 3 breadcrumb: [SLO Management reference, Service Level Objective Management, ITOM AIOps, IT Operations Management] --- # Create SLO form Learn about the available fields for adding a service level objective \(SLO\) to Service Reliability Management. ## Service level objective form The following table describes the available options in the Service level objective form. For step-by-step instructions, see [Create SLOs, SLIs, and error budget policies](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/it-operations-management/service-level-objective-management/sr-create-slo-sli.md).
| Field | Description |
|---|---|
| Name | Name of the SLO. |
| SLI type | - **Availability**: Percentage of time the service is available. - **Errors**: Frequency of service errors. - **Latency**: Time taken to service a request. - **Saturation**: Fullness of the system, focusing on resource use. |
| How do you want to measure this objective? | You can measure this objective by:- **Duration**: The amount of time the service spends without breaching. It's the only value available. - **Count**: The number of periods or occurrences in a given compliance period. |
| Field | Description |
|---|---|
| Objective \(%\) | The percentage of how available \(uptime\) you want the service to be over a length of time. If measuring by duration, an objective percentage of Five Nines \(99.999%\) means that the service wasn’t available for 26 seconds per month, or about 5 minutes and 35 seconds per year. This is used to calculate your error budget. |
| Compliance period | Period for which the metrics are calculated. The available options are:- **Month**: The duration is considered to be the current month. For example, if the current date is 26th January, the duration will be considered from 1st January until 31st January. - **Rolling 7 days**: The duration is considered to be 7 days from the current date. - **Rolling 30 days**: The duration is considered to be 30 days from the current date. For example, if the current date is 26th January, the duration will be considered from 25th December. - **Rolling 90 days**: The duration is considered to be 90 days from the current date. For example, if the current date is 26th January, the duration will be considered from 25th October. |
| Error budget | Auto-populated. The maximum level of errors \(downtime\) allowed over a certain period. A percentage of total service availability. Once you set your objective \(%\), your error budget is automatically calculated using this formula: 1 – \(Desired\) Availability. The error budget of a service will be calculated in days, hours, minutes, and seconds for a desired availability of 99.99% \(Four Nines\) of the year by: 1. Calculating the total time in seconds in a year: 31536000 seconds. 2. Determining the error budget as 1 – \(Desired\) Availability: 1 - 0.9999 = 0.0001. 3. Converting the error budget to time units. For example, if the error budget is 0.0001: - Error Budget in Seconds = 0.0001 \* 31,536,000 seconds = 3,153.6 seconds. - Error Budget in Minutes = 3,153.6 seconds / 60 = 52.56 minutes. - Error Budget in Hours = 52.56/60 = 0.875 hours. - Error Budget in Days = 52.56 minutes / \(24 \* 60\) ≈ 0.0364 days. **Note:** Your error budget appears in units of days, hours, minutes, and seconds only when you measure your SLO by duration. |
| SLO type | Count by periods or Count by occurrences |
|---|---|
| Limit occurrences | The number of occurrences after which a breach occurs.Limit occurrences act as an error budget. |
| Compliance period | Period for which the metrics are calculated. The available options are:- **Month**: The duration is considered to be the current month. For example, if the current date is 26th January, the duration will be considered from 1st January until 31st January. - **Rolling 7 days**: The duration is considered to be 7 days from the current date. - **Rolling 30 days**: The duration is considered to be 30 days from the current date. For example, if the current date is 26th January, the duration will be considered from 25th December. - **Rolling 90 days**: The duration is considered to be 90 days from the current date. For example, if the current date is 26th January, the duration will be considered from 25th October. |