--- title: Configure the expected OT devices for a site description: Configure the number of expected OT devices for a site so that you can use the % of Expected OT Devices in CMDB indicator in the OT progress scorecard. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/operational-technology/industrial-workspace/configure-expected-ot-devices.html release: australia product: Industrial Workspace classification: industrial-workspace topic_type: task last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Setting up the Operational Technology Progress Scorecard, Configure, Industrial Workspace, Operational Technology] --- # Configure the expected OT devices for a site Configure the number of expected OT devices for a site so that you can use the **% of Expected OT Devices in CMDB** indicator in the OT progress scorecard. ## Before you begin Role required: ot\_progress\_scorecard\_editor and cmdb\_ot\_isa\_viewer with site access assigned for relevant sites through user criteria **Note:** For more information about site access through user criteria, see [Review the homepage destination rules for the Industrial Workspace](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/operational-technology/industrial-workspace/review-iw-homepage-destination-rules.md). ## Procedure 1. Navigate to **All** > **Industrial Workspace Admin** > **OT Progress Scorecard Attributes**. 2. If you need to create a record with your site, complete these actions. 1. Select **New**. 2. In the **Site** field, add your site. 3. In the **Value** field, add the number of expected OT devices for that site. **Note:** Don't include OT control modules in this value. 4. Select **Save**. 3. If a record with your site exists and you want to modify the expected devices, complete these actions. 1. Select the record you want to edit. 2. In the **Value** field, modify the number of expected OT devices for that site. **Note:** Don't include OT control modules in this value. 3. Select **Update**. **Parent Topic:**[Setting up the Operational Technology Progress Scorecard](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/operational-technology/industrial-workspace/setting-up-the-ot-progress-scorecard.md)