--- title: Modify Qualys PC Results start date description: If data is missing for the start date in the Qualys PC Results import, it can be modified. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/security-management/configuration-compliance/modify-test-results-startdate.html release: australia product: Configuration Compliance classification: configuration-compliance topic_type: task last_updated: "2026-03-12" reading_time_minutes: 1 breadcrumb: [Resolving Configuration Compliance import issues, Reference, Configuration Compliance, Unified Security Exposure Management, Security Operations] --- # Modify Qualys PC Results start date If data is missing for the start date in the Qualys PC Results import, it can be modified. ## Before you begin Role required: sn\_vul\_qualys.admin ## Procedure 1. Navigate to **All** > **Qualys Vulnerability Integration** > **Administration** > **Primary Integrations**. 2. Click **Qualys PC Results** integration. 3. Click **Integration Details**. 4. Set the **Start time** field to a value in the past, so all scanned and detected test results, since that time, are detected. **Note:** If the date is left empty, no data is returned on the first run. Set the value to a maximum of a month in the past. This setting keeps large amount of data from exceeding the Qualys API rate limitations, as well as triggering execution timeouts. 5. Click **Submit** or **Update**. 6. Click **Execute Now** to run immediately.