--- title: View Schedule Optimization run summaries description: View run summaries to monitor the status and results of Schedule Optimization runs. locale: en-US canonical_url: https://www.servicenow.com/docs/r/field-service-management/field-service-scheduling/view-optimization-run-summaries.html release: brazil product: Field Service Scheduling classification: field-service-scheduling topic_type: task last_updated: "2026-09-10" reading_time_minutes: 1 breadcrumb: [Run summaries overview, Monitoring Schedule Optimization assignments, Scheduling and dispatching, Use, Field Service Management] --- # View Schedule Optimization run summaries View run summaries to monitor the status and results of Schedule Optimization runs. ## Before you begin Schedule Optimization must be configured and at least one optimization run must have been triggered. Role required: wm\_admin ## Procedure 1. Navigate to **All** > **Schedule Optimization** > **Run Summaries**. 2. Review the list of optimization runs. Each row represents one optimization run. 3. Select the Filter icon \(\[Omitted image "filter-right-side.png"\] Alt text: filter icon\) to filter or sort the list to find specific runs. - Filter by run type \(batch or intraday\) - Filter by status - Sort by start or end time 4. Select the **Run ID** to open the run summary record and review optimization details. The record displays: Optimization details - Run type: Batch optimization, Intraday optimization - Task state: assigned, dropped, unassigned, or unchanged - Sub-state: such as awaiting details, generating details, or details generated - Start time and end time of the optimization run - Optimization horizon: start and end dates of the evaluated time period - Travel estimate provider - Objectives and constraints applied 5. View the related list for more optimization details.
Tab Description
**Qualifiers** The assignment groups or territories included in the optimization run.
**Work Order Tasks** The work order tasks evaluated and processed during the optimization run.
**Dropped Technicians** Technicians who were not considered for optimization.Select a technician to view the Run Detail record, which shows the optimization status and resource notes explaining why the technician was excluded from optimization.
**Technician Schedules** Schedules for technicians included in the optimization run.
**Run Summary Shifts** Shift plans and the tasks assigned to each plan.
**Associated Batch Record** The batch configuration associated with the optimization run.
**Associated ML Solutions** Machine learning solutions associated with this optimization run.
Use run summaries to verify optimization results, investigate assignment decisions, and troubleshoot issues identified during optimization. **Related topics** [Configuring Schedule Optimization](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/field-service-management/field-service-scheduling/schedule-optimization-engine.md) [Optimizing technician schedules at set intervals](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/field-service-management/field-service-scheduling/optimize-your-schedules-intraday.md)