# Facilities & Operations — Missouri K-12 Education Reference ```mermaid flowchart TD A[Facilities & Operations] --> B[Capital Planning] A --> C[Safety & Compliance] A --> D[Daily Operations] B --> E[Facility Condition Assessment] B --> F[Bond Issue - 4/7 Voter Approval] B --> G[New Construction / Renovation] C --> H[ADA Accessibility] C --> I[Environmental Health] C --> J[Lead & Asbestos - AHERA] C --> K[Security Infrastructure] D --> L[Maintenance & Custodial] D --> M[Transportation] D --> N[Food Service] D --> O[Energy Management] I --> P[Fire Safety] I --> Q[Indoor Air Quality] I --> R[Playground Safety] ``` ## Table of Contents 1. ADA Accessibility 2. Environmental Health & Safety 3. Capital Planning & Bond Issues 4. New Construction & Renovation 5. Indoor Air Quality 6. Lead & Asbestos Management 7. Playground Safety 8. Energy Management 9. Maintenance & Custodial Operations 10. Transportation Operations 11. Food Service Facilities 12. Security Infrastructure --- ## 1. ADA Accessibility ### Requirements - All new construction must comply with ADA Accessibility Standards (2010 ADA Standards for Accessible Design) - Existing facilities must provide **program access** — the program/activity must be accessible even if every part of the building is not fully accessible - Alterations to existing buildings trigger accessibility requirements for the altered area ### Common Accessibility Elements - Accessible entrances, routes, and exits - Elevators or lifts (multi-story buildings) - Accessible restrooms on each floor with accessible classrooms - Accessible parking (quantity based on total parking spaces) - Signage (Braille, raised letters, pictograms) - Accessible classroom furniture and lab stations - Assistive listening systems in assembly areas - Accessible playground equipment and surfaces - Door hardware (lever handles, not knobs), door widths (32" minimum clear), thresholds - Visual alarm devices (for deaf/hard of hearing) ### Self-Evaluation & Transition Plan - ADA requires public entities to conduct a self-evaluation of facilities and programs - Develop a Transition Plan to address identified barriers - Prioritize: (1) access to programs, (2) access to state and local government services, (3) employee access --- ## 2. Environmental Health & Safety ### Key Regulatory Areas | Area | Authority | Requirements | |------|----------|-------------| | **Fire safety** | State Fire Marshal, local fire department | Annual inspection, fire alarm testing, sprinkler system maintenance, egress compliance | | **OSHA** | Federal/State OSHA | Hazard communication, bloodborne pathogens, lockout/tagout, PPE, confined spaces | | **Drinking water** | EPA / Missouri DNR | Lead testing (Lead-Free Schools provisions); safe drinking water act compliance | | **Radon** | EPA (guidance) | Testing recommended (Missouri has elevated radon areas); mitigation if levels exceed 4 pCi/L | | **Mold** | EPA / local health dept | Moisture control, remediation protocols, indoor air quality management | | **Pest management** | EPA / Missouri Dept of Agriculture | Integrated Pest Management (IPM) recommended; notification requirements for pesticide application in schools | ### Health & Safety Committee Best practice: establish a building-level health and safety committee including administration, custodial, nursing, teaching, and parent representatives. Conduct annual facility walk-throughs and address identified hazards. --- ## 3. Capital Planning & Bond Issues ### Long-Range Facility Plan Districts should maintain a 5-10 year capital improvement plan addressing: - Facility condition assessment (roof, HVAC, plumbing, electrical, structural, ADA) - Enrollment projections - Educational adequacy (do spaces support current instructional needs?) - Technology infrastructure needs - Energy efficiency upgrades - Security improvements - Athletic/activity facility needs ### Bond Issues - General obligation bonds are the primary mechanism for large capital projects - Require **4/7 voter approval (57.14%)** at election - Bonded indebtedness limit: generally 15% of assessed valuation (RSMo 164.011) - Typical uses: new construction, major renovation, technology infrastructure, buses, equipment - Repaid through a debt service levy on property taxes ### Lease-Purchase Agreements - Alternative financing for equipment, technology, vehicles - Board approval required; does not require voter approval - Annual payments from operating budget - Interest costs typically higher than bond financing - Useful for smaller projects or equipment with shorter useful life ### No-Tax-Increase Bonds Districts may issue no-tax-increase bonds by refinancing existing bonds at lower rates, freeing up capacity within the existing levy. --- ## 4. New Construction & Renovation ### DESE Requirements - School facility plans should be submitted to DESE for review - DESE provides guidance on minimum square footage per student, classroom sizes, and facility requirements ### Planning Process 1. Needs assessment (enrollment data, facility condition, educational adequacy) 2. Community engagement (input sessions, surveys, task forces) 3. Architectural programming (educational specifications → schematic design) 4. Board approval of project scope and budget 5. Bond election (if needed) 6. Architect/engineer selection (competitive process; RSMo 8.285-8.291 for public procurement) 7. Bidding and construction (prevailing wage applies — RSMo 290.210-290.340) 8. Occupancy and commissioning 9. Post-occupancy evaluation ### Prevailing Wage Missouri prevailing wage law (RSMo 290.210) applies to public construction projects over $75,000. Contractors and subcontractors must pay workers the prevailing wage rate for the locality. --- ## 5. Indoor Air Quality (IAQ) ### EPA Tools for Schools Program EPA recommends schools use the "IAQ Tools for Schools" framework: - Designate an IAQ coordinator - Conduct IAQ walk-throughs regularly - Address the six IAQ pathways: HVAC, moisture, chemical sources, biological sources, ventilation, filtration ### Common IAQ Issues in Schools - Inadequate ventilation (especially in older buildings) - Mold growth (moisture intrusion, condensation, plumbing leaks) - Chemical off-gassing (cleaning products, new construction materials, science labs) - Dust and allergens - CO2 accumulation (overcrowded classrooms with poor ventilation) - Vehicle exhaust near air intakes (bus loading zones) ### COVID-19 Legacy: Ventilation Improvements - Many Missouri districts used ESSER funds (federal pandemic relief) to upgrade HVAC systems - ASHRAE standards for school ventilation (minimum outdoor air per occupant) - MERV-13 filtration recommended (or highest rated filter compatible with HVAC system) - Portable air cleaners with HEPA filtration for classrooms without adequate HVAC --- ## 6. Lead & Asbestos Management ### Lead in Drinking Water - EPA Lead-Free Schools guidance and some state requirements for lead testing in school drinking water - Missouri DNR and DHSS provide guidance - Action level: EPA recommends action at 15 ppb (parts per billion); many schools use 5 ppb - Remediation: replace fixtures, install filters, shut off non-compliant sources - Testing recommended at all drinking fountains, food service taps, and classroom sinks used for drinking ### Asbestos (AHERA) **Asbestos Hazard Emergency Response Act (40 CFR Part 763)** - All schools (K-12) must have an Asbestos Management Plan on file - Initial inspection and periodic re-inspections (every 3 years) by accredited inspectors - Asbestos-containing materials (ACM) must be managed: encapsulated, enclosed, or removed - Custodial/maintenance staff must receive asbestos awareness training (2 hours minimum) - Parents and employees must be notified annually of the asbestos management plan availability - Designated Person in each district/school oversees AHERA compliance --- ## 7. Playground Safety ### CPSC Guidelines Consumer Product Safety Commission (CPSC) publishes the Public Playground Safety Handbook: - Age-appropriate equipment (separate areas for 2-5 and 5-12) - Fall zone surfacing (engineered wood fiber, rubber mulch, poured rubber — minimum 12" depth) - Equipment spacing and clearances - No entrapment or entanglement hazards - Regular inspection and maintenance schedule ### ADA Accessibility - Playground must include accessible routes to and through the play area - Accessible play components (ground-level activities) - Accessible surfacing (firm, stable, slip-resistant — poured rubber preferred for wheelchair access) ### Inspection - Routine inspection by trained staff (weekly/monthly) - Annual comprehensive inspection by certified playground safety inspector (CPSI) - Document all inspections and maintenance --- ## 8. Energy Management ### Energy Costs Energy is typically the second-largest operating expenditure for school districts (after personnel). Energy efficiency reduces operating costs and can redirect savings to instruction. ### Strategies - Energy audits (ASHRAE Level I, II, or III) - HVAC upgrades (high-efficiency equipment, building automation systems) - LED lighting conversion - Building envelope improvements (insulation, windows, roofing) - Renewable energy (solar panels — net metering available in Missouri) - Behavioral programs (turning off lights, managing thermostats) - Energy management systems (automated scheduling, demand response) - Utility incentive programs (Ameren, Evergy, others offer rebates) ### Guaranteed Energy Savings Contracts (GESC) Missouri law (RSMo 8.231) allows school districts to enter into guaranteed energy savings contracts: - Energy service company (ESCO) guarantees savings from efficiency improvements - Project financed through the guaranteed savings (no upfront capital required) - If savings are not achieved, ESCO pays the difference --- ## 9. Maintenance & Custodial Operations ### Staffing Guidelines APPA (Association of Physical Plant Administrators) recommends cleaning levels: - Level 1 (Orderly Tidiness): ~10,000-11,000 sq ft per custodian per shift - Level 2 (Ordinary Tidiness): ~18,000-20,000 sq ft - Level 3 (Casual Inattention): ~28,000-31,000 sq ft - Most schools target Level 2 or 3 due to budget constraints ### Preventive Maintenance - Scheduled maintenance program (HVAC, electrical, plumbing, roofing, grounds) - Work order system for tracking requests and completion - Preventive maintenance extends equipment life and reduces emergency repairs - Capital maintenance budgeting: industry recommends 2-4% of current replacement value annually for maintenance --- ## 10. Transportation Operations See `references/school-staff.md` for bus driver requirements. ### Key Operational Areas - Route planning and optimization (software tools: Transfinder, Versatrans, Tyler) - Fleet management (vehicle maintenance, replacement schedule, inspections) - GPS tracking and monitoring - Student safety (cameras, stop-arm violations, pre-trip/post-trip inspections) - Special transportation (IEP-mandated, wheelchair accessible, attendants) - Fuel management and procurement - Driver recruitment, training, and retention - Missouri State Highway Patrol school bus inspection (annual) --- ## 11. Food Service Facilities ### Kitchen Design & Equipment - Must comply with local health department requirements - USDA meal production requirements - Equipment for scratch cooking vs. heat-and-serve (trend toward scratch cooking) - Allergen management (separate preparation areas, labeling) - Walk-in cooler/freezer storage for USDA commodity foods ### Cafeteria Space - Adequate seating capacity for student population - Multiple lunch periods for large schools - Serving line efficiency - Clean and welcoming environment (impacts participation rates) --- ## 12. Security Infrastructure ### Physical Security - Controlled access (single-point entry, buzz-in systems, visitor management) - Security cameras (interior and exterior) - Communication systems (intercoms, radios, mass notification) - Classroom door hardware (lockable from inside — "barricade-proof" hardware discouraged in favor of proper locksets) - Secure vestibule design (screening visitors before entry to main building) - Window treatments (for concealment during lockdown) - Panic/duress alarms (in offices, counseling rooms) - Emergency lighting and exit signage ### Visitor Management Systems - Digital visitor management (Raptor, LobbyGuard, School Gate Guardian) - Sex offender registry check upon sign-in - Photo ID badge printing - Visitor logs maintained for safety and FERPA compliance - Clear signage directing all visitors to main office ### School Safety Assessments - CPTED (Crime Prevention Through Environmental Design) assessment - Vulnerability assessment (conducted by law enforcement or security consultants) - Annual review and update of safety plans - Coordination with local law enforcement and emergency management