# POA&M Guide The Plan of Action & Milestones (POA&M) is SSP Appendix O. It documents all known security weaknesses and the CSP's plan to remediate them. The POA&M is a living document — updated monthly during continuous monitoring. > Always use the official FedRAMP POA&M template. --- ## POA&M Row Fields (Required) | Field | Description | |---|---| | POA&M Item ID | Unique identifier (e.g., V-001, F-001) | | Controls | NIST 800-53 Rev 5 control ID(s) affected | | Weakness Name | Brief name of the finding | | Weakness Description | Detailed description of the gap or vulnerability | | Point of Contact | Person/team responsible for remediation | | Resources Required | Tools, budget, staff needed | | Overall Remediation Plan | How the weakness will be fixed | | Original Detection Date | When was this first identified? | | Scheduled Completion Date | Target remediation date (must meet SLA) | | Milestone Changes | Track date/description changes | | Status | Open / Closed / Risk Adjusted / Vendor Dependency | | Comments | Additional context | | Auto-Approve | Flag for auto-closures by 3PAO | | Deviation Request Approved | Yes/No — for DRs approved by AO | | Risk Rating (Original) | Critical / High / Moderate / Low | | Risk Adjustment | If risk-adjusted, new risk level and justification | | False Positive | Yes/No | | Operational Requirement | Yes/No (if deviation is operational necessity) | --- ## FedRAMP Remediation SLAs | Risk Rating | Remediation Deadline (from identification) | |---|---| | Critical (where distinguished from High) | ≤ 30 calendar days — prioritize immediately | | High | 30 calendar days | | Moderate | 90 calendar days | | Low | 180 calendar days | Source: FedRAMP Continuous Monitoring Performance Management Guide. Missing SLAs is one of the most common ConMon findings. Track carefully. --- ## POA&M Item Types ### Standard Finding (F-) - Identified by 3PAO during assessment or annual assessment - Must be remediated within SLA ### Vendor Dependency (VD-) - Remediation depends on a third-party (OS vendor, SaaS tool, IaaS provider) - Must document: vendor name, tracking ID (CVE or vendor ticket), expected fix date - 3PAO validates VDs during annual assessment - AO must agree to accept the VD; CSP must have compensating controls ### Deviation Request (DR-) Three subtypes: 1. **False Positive (FP)**: Finding is not actually a vulnerability — provide evidence 2. **Risk Adjustment (RA)**: Vulnerability exists but risk is lower due to mitigating factors — must quantify 3. **Operational Requirement (OR)**: Vulnerability cannot be fixed without breaking functionality — must document business justification and compensating controls All DRs require agency AO approval before being marked as such in the POA&M. --- ## POA&M Writing Tips 1. **One finding, one row** — Do not bundle multiple vulnerabilities into a single POA&M item 2. **Be specific about CVEs** — For vulnerability scan findings, always include CVE IDs 3. **Milestone dates must be realistic** — Overpromising and missing milestones is a finding in itself 4. **Closed items need evidence** — When closing an item, document the evidence of remediation (scan result, configuration screenshot, date) 5. **Inventory sheet is required** — The POA&M template includes an inventory tab; keep it current 6. **Match to SAR findings** — Every finding in the SAR must appear in the POA&M; reviewers cross-reference these --- ## POA&M During Initial Authorization vs. ConMon **Initial Authorization:** - POA&M documents residual risks from the 3PAO assessment (SAR findings not remediated before ATO) - Agency AO reviews and accepts residual risk as part of granting ATO - Moderate/High risk items may block ATO if not remediated or deviation-approved **Continuous Monitoring:** - POA&M updated monthly - Submitted to agency AO(s) monthly - Open items must show active progress (milestone updates) - Stale POA&M items (no updates, missed milestones) can trigger suspension of ATO