--- name: ferc-market-based-rate-tariff title: FERC Market-Based Rate Tariff description: Drafts eTariff-ready FERC Market-Based Rate Tariffs for wholesale electric energy, capacity, and ancillary services sales. Use when preparing MBR tariff filings, structuring market-based rate authority documentation, or drafting wholesale power tariffs for FERC proceedings. Covers Order Nos. 697/697-A/860, Category 1/2 analysis, 18 CFR Part 35 formatting, and EQR/change-in-status reporting. author: CaseMark author_url: https://github.com/CaseMark/skills/tree/main/skills/legal/ferc-market-based-rate-tariff license: Apache-2.0 version: 0.1.0 execution_mode: open jurisdiction: us practice: energy language: en tags: [agreement, drafting] --- # FERC Market-Based Rate Tariff Produces a filing-ready tariff authorizing wholesale sales of electric energy, capacity, and ancillary services at market-based rates under FERC jurisdiction. ## Prerequisites Collect before drafting: 1. **Seller identity** — legal name, state of incorporation, principal place of business 2. **FERC identifiers** — docket number, MBR authorization order date, assigned codes 3. **Category status** — Category 1 or 2 per FERC region (Northeast, Southeast, Southwest, Central, Northwest, California) 4. **Authorization conditions** — MW caps, affiliate restrictions, behavioral/structural remedies, geographic limits 5. **Asset inventory** — generation (capacity, fuel, location), transmission, affiliate holdings 6. **Organized market participation** — ISO/RTO memberships if applicable ## Quick Start 1. Gather all prerequisites and the FERC authorization order 2. Draft sections in order below; populate the regional category matrix early — it drives mitigation and reporting sections 3. Flag all client-specific gaps with `[INSERT]` tags 4. Run the checks in Pitfalls before delivering ## Output Structure ### 1. Preamble - Seller legal name, organizational details, FERC identifiers - Docket number, authorization order date; cite Order No. 697 as foundational authority - Effective date: `[DATE CERTAIN]` or date of FERC acceptance, whichever is later - Statement of wholesale sales authority acknowledging FERC oversight jurisdiction ### 2. Regulatory Compliance Commitments (18 CFR Part 35) | Obligation | Trigger | Timeframe | |---|---|---| | Maintain category status | Ongoing | Continuous | | Change-in-status notification | Ownership/asset/affiliate changes | 30 days | | Horizontal market power screens | Delivered price test + pivotal supplier | Ongoing | | Vertical market power compliance | Transmission/fuel control concerns | Ongoing | | Affiliate codes of conduct | Per authorization order | Per Commission order | | Organized market participation | If required by authorization | Per RTO/ISO tariff | ### 3. Market Power Mitigation & Constraints - Generation capacity caps by market (MW limits per FERC order) - Affiliate transaction restrictions (Standards of Conduct) - Behavioral remedies (price caps) or structural remedies (divestitures) if imposed - Geographic scope: each authorized balancing authority area, ISO, or RTO by full legal name - Cross-reference authorization order factual findings supporting each limitation ### 4. Regional Category Status Matrix | FERC Region | Category | Basis | Special Conditions | |---|---|---|---| | Northeast | [1/2] | [Screen results / case-specific] | [If any] | | Southeast | [1/2] | | | | Southwest | [1/2] | | | | Central | [1/2] | | | | Northwest | [1/2] | | | | California | [1/2] | | | - **Category 1** — passed indicative screens; rebuttable presumption of no horizontal market power - **Category 2** — failed ≥1 screen; requires case-specific showing with enhanced reporting ### 5. Ongoing Reporting Obligations | Filing | System | Frequency | |---|---|---| | Market power analysis update | FERC eFiling | Triennial or within 30 days of material change | | Electric Quarterly Report | FERC EQR | Within 30 days of quarter end | | Change-in-status report | FERC eFiling | Within 30 days of triggering event | | Asset appendix update | FERC eFiling | Upon asset acquisition/disposition | Triggering events: mergers, acquisitions, reorganizations, affiliate changes, asset transactions affecting market power analysis. Format per 18 CFR § 35.42. ### 6. General Terms and Conditions - **Rate-setting** — bilateral contracts or FERC-approved organized market; subject to filed rate doctrine - **Non-discrimination** — consistent with MBR authority - **Dispute resolution** — FERC complaint procedures (18 CFR Part 206); contractual arbitration where consistent with Commission jurisdiction - **Force majeure** — notice and mitigation obligations - **Creditworthiness** — collateral requirements on purchasers - **Termination/amendment** — tariff amendments via FERC eFiling ### 7. Certification and Filing Authorization Include authorized officer certification block: - Officer name, title, seller legal name - Certifications: (1) authority to file, (2) truth/completeness, (3) acceptance of FERC jurisdiction, (4) compliance commitment - Signature block with date, phone, email - Attorney/authorized representative eFiling certification with bar number ## Formatting Requirements - Hierarchical section numbering (1.0, 1.1, 1.1.1) - Seller name and tariff designation in headers/footers on every page - Complete citations using Bluebook or FERC conventions - Target length: 12–25 pages ## Pitfalls - **Category 2 sellers**: must include case-specific market power showing; flag enhanced reporting prominently throughout - **Jurisdictional limits**: no provision may restrict FERC regulatory authority or create barriers to competitive market entry - **Placeholder audit**: deliver with cover memo identifying every `[INSERT]` tag and unusual conditions - **Verify before filing**: Order No. 697 (2007), Order No. 697-A (2008), Order No. 860 (2019) — confirm current amendment status; verify 18 CFR § 35.42 text and check for intervening Commission orders