# Environmental Due Diligence Reference Guide ## Overview Environmental due diligence is a critical component of real estate and business transactions. This guide covers the Phase I Environmental Site Assessment (ESA) process and related due diligence standards. --- ## PHASE I ENVIRONMENTAL SITE ASSESSMENT ### Purpose A Phase I ESA identifies potential or existing environmental contamination liabilities associated with a property. It is the primary tool for satisfying the "All Appropriate Inquiries" (AAI) requirement under CERCLA. ### Governing Standards #### ASTM E1527-21 The current standard for Phase I ESAs, effective November 1, 2021, replacing E1527-13. **Full Title**: Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process #### All Appropriate Inquiries (AAI) **40 CFR Part 312** Federal rule establishing minimum requirements for due diligence to qualify for CERCLA liability protections. Compliance with ASTM E1527-21 satisfies AAI requirements. --- ## KEY TERMS AND DEFINITIONS ### Recognized Environmental Condition (REC) The presence or likely presence of any hazardous substances or petroleum products in, on, or at a property: - Due to release to the environment - Under conditions indicative of a release to the environment - Under conditions that pose a material threat of a future release to the environment **Note**: RECs are the primary findings that trigger concern and potential further investigation. ### Controlled Recognized Environmental Condition (CREC) A REC resulting from a past release that has been addressed with: - Property use restrictions - Activity and use limitations - Institutional controls - Engineering controls The residual contamination is acceptable under regulatory closure but may require ongoing management. ### Historical Recognized Environmental Condition (HREC) A past release that has been addressed such that the condition: - No longer presents a material threat - Was addressed to unrestricted residential standards - Does not require land use restrictions or controls ### De Minimis Condition A condition that generally does not present a material risk of harm and would not be the subject of enforcement action. Examples include: - Small quantity of petroleum from de minimis release - Properly maintained regulated equipment (ASTs, transformers) - Conditions clearly below regulatory action levels ### Business Environmental Risk A risk that can have a material environmental or environmentally-driven impact on the business associated with a property but is not necessarily a REC. Examples include: - Asbestos-containing materials - Lead-based paint - Radon - Wetlands - Endangered species --- ## PHASE I ESA COMPONENTS ### 1. Records Review #### Standard Environmental Record Sources **Federal Records**: | Database | Description | Minimum Search Distance | |----------|-------------|------------------------| | NPL | National Priorities List (Superfund sites) | 1.0 mile | | CERCLIS/SEMS | Superfund site inventory | 0.5 mile | | RCRA CORRACTS | RCRA facilities with corrective action | 1.0 mile | | RCRA TSD | RCRA treatment, storage, disposal | 0.5 mile | | RCRA Generators | RCRA large quantity generators | Property and adjoining | | ERNS | Emergency Response Notification System | Property only | | Institutional Controls | Federal institutional/engineering controls | Property only | **State Records**: | Database | Description | Minimum Search Distance | |----------|-------------|------------------------| | State NPL Equivalent | State-designated contaminated sites | 1.0 mile | | SWF/Landfills | Solid waste facilities | 0.5 mile | | LUST | Leaking underground storage tanks | 0.5 mile | | UST | Registered underground storage tanks | Property and adjoining | | Brownfields | State brownfield sites | 0.5 mile | | VCP | Voluntary cleanup program sites | 0.5 mile | **Additional Records**: - Local records (permits, violations, correspondence) - Tribal records (if applicable) - Physical setting sources (geology, hydrogeology, topography) - Historical use records (discussed below) #### Historical Records Review **Objectives**: Identify past uses that may have involved hazardous substances or petroleum products. **Standard Historical Sources**: 1. **Aerial photographs** - To 1940 or first developed use 2. **Fire insurance maps** (Sanborn) - To 1940 or first developed use 3. **City directories** - To 1940 or first developed use 4. **Property tax files** - Various time periods 5. **Recorded land title records** - Chain of title 6. **Building department records** - Permits, uses 7. **Zoning/land use records** - Historical zoning **Timeframe**: Historical records review should extend to: - 1940, OR - The property's first developed use, whichever is earlier ### 2. Site Reconnaissance #### Objectives - Observe current uses and conditions - Identify potential environmental concerns - Verify/supplement records review findings #### Visual Inspection Requirements **Interior Inspection** (where not precluded): - All accessible areas - Storage areas - Mechanical systems - Evidence of hazardous substance use/storage **Exterior Inspection**: - Property perimeter - Drainage patterns - Stained soil/pavement - Distressed vegetation - Fill areas - Dumping/debris - Storage tanks and containers - Equipment **Adjoining Properties** (from property boundaries or public rights-of-way): - Current uses - Evidence of environmental concerns that may affect subject property #### Limitations on Site Reconnaissance Document any areas not accessible: - Buildings not entered - Areas blocked by equipment/materials - Tenants who denied access - Weather or safety constraints ### 3. Interviews #### Required Interviews **Current Owners/Operators**: - Knowledge of environmental conditions - Current operations and hazardous substance use - Past uses and conditions - Environmental liens or activity restrictions - Pending/past environmental litigation **Past Owners/Operators** (if readily available): - Historical uses - Past environmental incidents - Releases or contamination knowledge **Site Manager or Occupant**: - Day-to-day operations - Waste management practices - Storage locations **Local Government Officials**: - Fire department (hazmat incidents) - Health department (permits, violations) - Building department (permits, uses) #### Interview Documentation - Date and method of interview - Person interviewed and affiliation - Questions asked - Responses received ### 4. Report Preparation #### Required Report Contents 1. **Executive Summary** - Scope and limitations - Findings summary - Conclusions - Data gaps 2. **Introduction** - Purpose - Scope of services - Significant assumptions - Limitations and exceptions - Special terms and conditions 3. **Site Description** - Location and legal description - Site and vicinity characteristics - Current use - Description of structures 4. **User Provided Information** - Environmental liens - Activity and use limitations - Specialized knowledge - Price/value relationship - Commonly known or reasonably ascertainable information 5. **Records Review** - Standard environmental record sources - Physical setting sources - Historical use information 6. **Site Reconnaissance** - Methodology and limiting conditions - General site observations - Specific observations 7. **Interviews** - Owner interview - Occupant interview - Local government interviews 8. **Findings and Opinions** - RECs - CRECs - HRECs - De minimis conditions - Data gaps 9. **Conclusions** 10. **Environmental Professional Declaration** --- ## DATA GAPS AND LIMITING CONDITIONS ### Significant Data Gaps When standard sources are unavailable, the environmental professional must: 1. Document attempts to obtain information 2. Seek alternative sources 3. Evaluate impact on ability to identify RECs 4. Opine whether data gap affects findings ### Standard Limiting Conditions **Not included in typical Phase I ESA**: - Sampling or testing - Regulatory compliance review - Asbestos surveys - Lead-based paint testing - Radon testing - Wetlands delineation - Indoor air quality testing - Endangered species surveys - Cultural resources surveys ### Shelf Life **ASTM E1527-21**: Phase I ESA is valid for 180 days from date of report or site visit (whichever earlier). After 180 days, updates may be required. **Update Requirements** (if 180 days exceeded): - Updated records review - Updated site reconnaissance (if conditions may have changed) - Updated interviews - No new site visit required if report less than 1 year old and no changes --- ## USER RESPONSIBILITIES ### Required User-Provided Information Under ASTM E1527-21, the "user" (typically purchaser/lender) must provide: 1. **Environmental Liens** - Search for recorded environmental liens 2. **Activity and Use Limitations (AULs)** - Institutional controls - Engineering controls - Land use restrictions 3. **Specialized Knowledge** - Any information indicating contamination not disclosed 4. **Commonly Known Information** - Generally known information about the property 5. **Valuation Reduction** - Whether purchase price reflects environmental contamination 6. **Reason for Significantly Lower Price** - Explanation if purchase price significantly below market value ### Reporting User-Provided Information - Environmental professional documents what information was requested - Document what information was provided (or not provided) - Document date of transmission --- ## PHASE II ENVIRONMENTAL SITE ASSESSMENT ### When Required Phase II investigation is triggered when Phase I identifies: - RECs requiring further evaluation - Data gaps that cannot be resolved - Conditions warranting characterization ### ASTM E1903-19 Standard Practice for Environmental Site Assessments: Phase II Environmental Site Assessment Process ### Typical Scope - Soil sampling and analysis - Groundwater sampling and analysis - Soil gas sampling - Indoor air sampling - Geophysical surveys - Tank integrity testing ### Sampling Strategy - Based on RECs identified in Phase I - Follows professional judgment - Considers regulatory guidance - May follow EPA or state protocols --- ## TRANSACTION SCREENS ### ASTM E1528-22 Standard Practice for Limited Environmental Due Diligence: Transaction Screen Process ### Appropriate Use - Lower-risk properties - Limited budgets - Initial screening before full Phase I - Portfolio assessments ### Limitations - Does not satisfy AAI requirements - May not identify all RECs - Limited records review - Limited historical review --- ## CERCLA LIABILITY PROTECTIONS ### Innocent Landowner Defense (42 USC § 9601(35)) Requirements: - Acquired after disposal - Did not know and had no reason to know - Made AAI - Exercised due care - Took reasonable precautions ### Bona Fide Prospective Purchaser (42 USC § 9607(r)) Requirements: - All disposal before acquisition - Made AAI - Full cooperation and access - Complies with land use restrictions - Takes reasonable steps - Provides required notices - Exercises appropriate care ### Contiguous Property Owner (42 USC § 9607(q)) Requirements: - Did not cause, contribute, or consent - Not affiliated with responsible party - Made AAI - Takes reasonable steps - Cooperates with response actions ### All Appropriate Inquiries Compliance **40 CFR Part 312** - AAI satisfied by: - Phase I ESA per ASTM E1527-21 (or E1527-13 until updated) - Completed or updated within one year of acquisition - Site visit within 180 days of acquisition - Government records search within 180 days --- ## ENVIRONMENTAL CONSULTANT QUALIFICATIONS ### Environmental Professional (EP) ASTM E1527-21 requires oversight by an "Environmental Professional" meeting one of these criteria: 1. Licensed Professional Engineer (PE) or Geologist (PG) with 3+ years environmental experience 2. Licensed or certified by federal, state, or tribal authority with 3+ years experience 3. Baccalaureate degree or higher in science/engineering with 5+ years experience 4. 10+ years full-time environmental experience ### EP Declaration The EP must sign a statement declaring: - Meets EP definition - Has developed and performed AAI per ASTM standard - Required components were performed --- ## SPECIALIZED ASSESSMENTS ### Asbestos Survey - AHERA (40 CFR Part 763, Subpart E) for schools - NESHAP (40 CFR Part 61, Subpart M) for demolition/renovation - Pre-purchase surveys ### Lead-Based Paint - HUD/EPA disclosure requirements (42 USC § 4852d) - Pre-renovation requirements (40 CFR Part 745) - Risk assessments ### Vapor Intrusion Assessment - EPA 2015 Vapor Intrusion Guidance - Indoor air sampling - Sub-slab soil gas sampling - Groundwater pathway analysis --- ## KEY CITATIONS - **CERCLA AAI**: 40 CFR Part 312 - **Phase I ESA**: ASTM E1527-21 - **Phase II ESA**: ASTM E1903-19 - **Transaction Screen**: ASTM E1528-22 - **Vapor Intrusion**: EPA OSWER 9200.2-154 (2015) - **CERCLA Defenses**: 42 USC §§ 9601(35), 9607(q), 9607(r) --- *Last Updated: March 2026* *This reference is for informational purposes only and does not constitute legal advice.*