--- name: rfp-response title: RFP Response description: Drafts evaluation-ready U.S. federal RFP responses across all standard proposal volumes (cover letter, technical, cost/price, reps and certs). Enforces FAR compliance, CPARS references, and Section L/M alignment. Use when preparing federal solicitation submissions, responding to government RFPs, or drafting procurement bids. author: CaseMark author_url: https://github.com/CaseMark/skills/tree/main/skills/legal/rfp-response license: Apache-2.0 version: 0.1.0 execution_mode: open jurisdiction: us practice: government-contracts language: en tags: [drafting, letter] --- # RFP Response Produces a complete federal proposal structured to FAR requirements and scored against typical source selection criteria. ## Prerequisites Collect before drafting: 1. **RFP package** — solicitation number, title, SOW, Section L/M instructions 2. **Contracting Officer** — name, title, agency, address 3. **Offeror profile** — legal name, UEI/CAGE, NAICS, small business certifications, SAM.gov status 4. **Past performance** — 3–5 relevant contracts with CO/PM contacts, values, CPARS ratings 5. **Key personnel** — resumes, clearance levels 6. **Cost data** — indirect/fringe rates, labor categories and rates, subcontractor quotes ## Quick Start 1. Parse Section L (formatting) and Section M (evaluation factors) — these control everything 2. Build a compliance matrix mapping every SOW/Section L requirement to a proposal section 3. Draft volumes in order: cover letter → technical → cost/price → reps and certs 4. Verify every capability claim cites past performance, test results, or published research 5. Confirm all FAR/CAS citations against current regulations before submission ## Proposal Volumes ### 1. Cover Letter (≤2 pages) Include: addressee (named CO), solicitation reference, agency-specific mission knowledge, qualifications with CPARS ratings, compliance affirmation for all mandatory requirements, validity period (per solicitation, typically 60–120 days), authorized signatory with binding authority. ### 2. Executive Summary (≤3 pages) - Restate requirements interpretively — connect SOW to agency mission (do not paraphrase) - Differentiated solution with named methods, partnerships, or innovations - Quantified value proposition tied to documented past performance - Key personnel highlights and organizational depth ### 3. Technical Approach Mirror SOW structure — one response per major task. For each task address: - Methods, tools, technologies, and rationale for selection - Resource requirements, dependencies, GFE/GFI needs - Integration points with agency systems or other contractors - Applicable standards (cite by name and number) - QA/QC protocols, acceptance criteria, corrective action process - Risk identification with specific mitigation plans - Technical diagrams (professional quality, labeled, referenced in text) ### 4. Management Plan **Org structure:** management philosophy, org chart with key personnel (% time, reporting lines, sub interfaces), PM authority and span of control. **Resumes (consistent format):** education, certifications, clearances, government contract experience, measurable accomplishments. **Schedule:** milestones, deliverables, dependencies, critical path. Gantt or PERT format with historical duration estimates. **Administration:** invoicing method/frequency, progress reporting cadence (CDRL-compliant), change control process, COR/COTR communication protocols, FAR clause procedural responses. **Staffing:** recruitment plan, retention approach, succession plan, subcontractor oversight. ### 5. Past Performance Per reference (3–5 projects): | Field | Content | |---|---| | Client / agency | Name, federal/state/local | | Contract number | Including vehicle (GWAC, IDIQ, etc.) | | Type and value | FFP/CPFF/T&M; total value | | Period and scope | Dates; elements paralleling current SOW | | CPARS ratings | By evaluation factor; "Satisfactory" or above | | Outcomes | Quantified savings, defect rates, on-time %, awards | | Challenges | Obstacles encountered and corrective actions | | Reference contact | Name, title, phone, email (verified, willing) | If limited prime experience: include key personnel track records and teaming partner experience with clear role delineation. Address any negative performance with corrective action narrative. ### 6. Cost/Price Breakdown Structure by government cost element: | Element | Detail | |---|---| | Direct Labor | LCAT, hours by year/task, rate (loaded/unloaded) | | Fringe / Overhead / G&A | Rate %, allocation base, pool composition | | Materials | Itemized with vendor quotes for major purchases | | Subcontracts | Same breakdown as prime, per subcontractor | | Travel | Trips, destinations, duration, FTR per diem | | ODCs | Software, communications, printing, shipping | | Fee/Profit | Justified by risk, complexity, capital investment | - Derive labor hours from historical actuals, industry standards, or bottom-up analysis — no unsupported round numbers - Apply index-based escalation (ECI, CPI) with cited sources for multi-year contracts - All costs must be allocable, allowable, and reasonable per FAR Part 31 ### 7. Cost Supporting Documentation - [ ] Basis of Estimate narrative per major cost element - [ ] Labor rate documentation (payroll, salary surveys, market data) - [ ] Vendor quotes (current, ≤6 months; multiple for major items) - [ ] Indirect rate documentation: FPRA/PREA or rate build-up with CAS disclosure - [ ] Escalation factor support with index citations - [ ] Subcontractor proposals with competitive selection documentation - [ ] Accounting system description; CAS Disclosure Statements if applicable ### 8. Representations and Certifications - **SAM.gov** — confirm UEI, CAGE, NAICS, size standards current as of submission - **Small business** — verify against NAICS size standard; SBA cert current if WOSB/SDVOSB/HUBZone - **Tax compliance** — no delinquent federal tax liabilities (coordinate with finance) - **Executive compensation** — disclose if ≥80% federal revenue and >$25M - **Procurement certs** — OCI disclosures, conflict of interest, applicable statutes/EOs - **Signatory** — officer with actual binding authority; verify before execution > **Legal risk:** False certifications trigger termination, suspension/debarment, civil penalties, and criminal prosecution. Escalate any compliance uncertainty to legal counsel. ## Pitfalls - **Section L violations disqualify** — every formatting requirement is mandatory; page limits are strict - **No marketing language** — every claim must cite evidence (past performance, certifications, test results) - **Jargon balance** — precise terminology but accessible to non-specialist evaluators - **Graphics standards** — all diagrams must be professional, labeled, captioned, and cited in text - **Citation verification** — confirm all FAR, CAS, and statutory references against current FAR/DFARS before submission - **Jurisdiction** — U.S. federal procurement only; apply DFARS supplements for DoD solicitations