--- name: city-plan-checking description: "Use when independently checking proposal completeness, plan conformance, acceptance criteria, required evidence, review prerequisites, or a resident decision packet." user-invocable: false --- # Plan Checking Under adopted [development applications](../city-development-applications/SKILL.md), Chief Planner independently assesses the exact current Advisor application revision against proportionate screening requirements and resident answers. An Inspector desk check cannot replace that assessment, nor can Advisor assess its own packet. Do not require every artifact kind, master plan or full impact matrix by default. ## Competency and application Municipal plan checking is a desk assessment against applicable requirements, not construction or permission to proceed. In Repository City, evaluate whether a proposal is coherent and reviewable without rewriting it into compliance. ## Triggers and inputs - Use before resident consideration, after a material proposal revision, or when acceptance criteria and planned work disagree. - Require root, case, exact proposal revision, criteria, applicable standards, architecture constraints, district ownership, and claimed approval evidence. - When zoning is adopted, check the current zoning finding and its map/scope snapshot separately from district ownership; conditional rules require formal review, and unknown or prohibited rules are not conformance. - Read original source requirements. Record absent or disputed baselines explicitly. ## Procedure 1. Establish review type and scope. A plan check is a proposal desk review for the City Council or resident, not a delivery inspection or permit. 2. List each applicable requirement with its exact source and current status: established requirement, resident proposal, disputed, or unknown. 3. Check that the plan maps outcomes to bounded edits, interfaces, dependencies, observable acceptance evidence, and a credible recovery approach. 4. Examine omitted error paths, operational impacts, ownership conflicts, compatibility, and missing specialist assessments. 5. Check consistency between scope, proposed tests, and affected districts. Do not expand or weaken criteria to make the plan pass. Compare each declared project directory and infrastructure target with the applicable zone rules and the proposal's change types. 6. Separate a clear nonconformity from insufficient evidence and an advisory improvement. State precisely what would resolve each issue. 7. Compare revisions when available, retaining unresolved findings and identifying new impacts rather than assuming a revised document fixed everything. 8. Return findings to the Clerk for recording and the resident for consideration. The inspector does not repair the plan or approve the author's work. ## Persistent plans and findings Use [records capture](../city-records-capture/SKILL.md) for substantial plan checks and findings. An artifact's `recordCategory` describes intended use only; `legacy-unclassified`, working and proposed documents are not evidence of approval. Verify any claimed decision in its canonical structured record. ## Structured result and evidence Return root/case/revision, review scope, requirement-to-plan matrix, evidence locations, findings, missing prerequisites, and `pass`, `fail`, or `blocked` per item and overall. A `pass` means the scoped proposal is ready for resident consideration only. Provide precise file/section references and distinguish reviewed from unreviewed areas. ## Escalation and limits - A skill grants no edit or execution powers. Building Inspector never edits requirements, tests, proposals, source, records, or enforcement controls. - Disputed standards or missing resident choices go to the resident through the Clerk/Manager; do not assume specialist clearance or fake approval. - Local files and write confirmation are not authorization. A desk-review pass informs the Council's decision; it does not authorize delivery itself.