--- name: changeover-optimizer description: Setup and changeover time reduction skill with SMED methodology and sequence optimization allowed-tools: - Read - Write - Glob - Grep - Edit metadata: specialization: operations domain: business category: workflow-automation --- # Changeover Optimizer ## Overview The Changeover Optimizer skill provides comprehensive capabilities for reducing setup and changeover times. It supports SMED (Single-Minute Exchange of Die) methodology, sequence optimization, and changeover time tracking. ## Capabilities - Internal/external setup separation - Changeover video analysis - Parallel task identification - Standardization opportunities - Quick-release mechanisms - Sequence optimization - Changeover matrix - Time reduction tracking ## Used By Processes - LEAN-004: Kanban System Design - CAP-002: Production Scheduling Optimization - LEAN-003: Kaizen Event Facilitation ## Tools and Libraries - Video analysis tools - SMED templates - Time study software - Scheduling optimization ## Usage ```yaml skill: changeover-optimizer inputs: equipment: "Injection Molding Press 5" current_changeover_time: 120 # minutes target_changeover_time: 30 changeover_data: video_analysis: "changeover_video_url" task_breakdown: - task: "Remove old mold" time: 15 type: "internal" - task: "Get new mold from storage" time: 20 type: "internal" - task: "Install new mold" time: 25 type: "internal" - task: "Connect utilities" time: 15 type: "internal" - task: "Adjust parameters" time: 25 type: "internal" - task: "Run test shots" time: 20 type: "internal" outputs: - current_state_analysis - internal_external_separation - improvement_opportunities - optimized_procedure - changeover_matrix - implementation_plan ``` ## SMED Methodology ### Stage 1: Separate Internal and External Setup | Type | Definition | Goal | |------|------------|------| | Internal | Must stop machine | Minimize | | External | Machine running | Maximize | ### Stage 2: Convert Internal to External - Pre-stage tools and materials - Pre-heat/pre-cool components - Prepare documentation - Pre-adjust settings ### Stage 3: Streamline All Operations - Parallel tasks (multiple operators) - Eliminate adjustments - Standardize procedures - Use quick-release mechanisms ## Changeover Analysis ``` Current State: - Total time: 120 minutes - Internal: 100 minutes - External: 20 minutes Improvement Opportunities: 1. Move mold retrieval to external: -20 min 2. Pre-heat mold: -10 min 3. Use quick-clamps: -15 min 4. Parallel connection work: -10 min 5. Eliminate test shots: -15 min Target State: - Total time: 30 minutes - Internal: 25 minutes - External: 35 minutes ``` ## Changeover Matrix | From / To | Product A | Product B | Product C | |-----------|-----------|-----------|-----------| | Product A | - | 30 min | 45 min | | Product B | 35 min | - | 25 min | | Product C | 40 min | 30 min | - | ## Quick Changeover Techniques | Technique | Application | |-----------|-------------| | Quick-release clamps | Replace bolts | | Intermediate jigs | Pre-positioned tooling | | Color coding | Visual identification | | One-turn fasteners | Reduce turns required | | Standardized heights | Eliminate adjustments | | Preset gauges | Eliminate measurement | ## Implementation Steps 1. Document current state (video) 2. Separate internal/external 3. Convert internal to external 4. Streamline internal setup 5. Streamline external setup 6. Standardize and train 7. Track and improve ## Integration Points - Production scheduling systems - Video analysis tools - Training platforms - OEE tracking systems