--- name: fai-inspection description: Skill for first article inspection planning and execution per AS9102 allowed-tools: - Read - Write - Glob - Grep - Bash metadata: specialization: mechanical-engineering domain: science category: testing-validation priority: high phase: 4 tools-libraries: - CMM software - QMS systems - AS9102 templates --- # First Article Inspection Skill ## Purpose The First Article Inspection skill provides capabilities for planning and executing first article inspections per AS9102, enabling comprehensive verification of manufacturing processes and design conformance. ## Capabilities - FAI plan development per AS9102 - Balloon drawing preparation - Measurement method specification - CMM programming guidance - Characteristic accountability matrix - Partial FAI and delta FAI management - FAI report generation (Forms 1, 2, 3) - Non-conformance disposition ## Usage Guidelines ### AS9102 Requirements #### FAI Triggers ``` Full FAI required when: - New part number - Design change affecting form/fit/function - Change in manufacturing process/location - Tooling inactive > 2 years - Manufacturing process change - Natural/human-made event affecting process ``` #### Partial FAI (Delta FAI) ``` Allowed when: - Minor design change - Controlled process change - Tooling modification Only affected characteristics need re-inspection ``` ### FAI Planning #### Characteristic Identification 1. **Drawing Review** - Identify all dimensions - Identify all notes - Identify material/process requirements - Identify special characteristics 2. **Characteristic Types** | Type | Symbol | Definition | |------|--------|------------| | Standard | None | Normal inspection | | Critical | Triangle/diamond | Safety/function critical | | Major | M in circle | Important for assembly | | CTQ | Key symbol | Customer specified | #### Balloon Drawing ``` Ballooning requirements: - Unique number for each characteristic - Sequential numbering preferred - Reference to original dimension - Include notes and specifications - Mark special characteristics ``` ### AS9102 Forms #### Form 1: Part Number Accountability ``` Required fields: - Part number and name - Part revision level - Drawing number and revision - Organization name and code - FAI report number - Signature and date - Part serial number - FAI reason (new/change) ``` #### Form 2: Product Accountability - Materials, Processes, Functional Testing ``` Material verification: - Material specification - Raw material supplier - Material certifications - Heat/lot traceability Process verification: - Special processes (heat treat, plating, NDT) - Process specification - Processor certification - Process parameters Functional testing: - Test requirements - Test results - Pass/fail status ``` #### Form 3: Characteristic Accountability ``` For each characteristic: - Characteristic number (balloon) - Reference location (drawing zone) - Characteristic designator (if special) - Requirement (nominal and tolerance) - Results (actual value) - Designed tooling (Y/N) - Non-conformance number (if applicable) ``` ### Measurement Methods #### Measurement Selection | Tolerance | Accuracy Required | Typical Method | |-----------|------------------|----------------| | +/- 0.5 mm | 0.05 mm | Caliper | | +/- 0.1 mm | 0.01 mm | Micrometer | | +/- 0.025 mm | 0.002 mm | CMM | | +/- 0.005 mm | 0.0005 mm | Precision CMM | #### GD&T Measurement | Characteristic | Measurement Method | |----------------|-------------------| | Flatness | CMM scan, optical flat | | Perpendicularity | CMM, square fixture | | Position | CMM, functional gage | | Concentricity | CMM, roundness tester | | Runout | V-blocks + indicator | | Profile | CMM, optical comparator | #### CMM Programming ``` CMM measurement strategy: 1. Establish datum reference frame 2. Measure datum features first 3. Measure located features 4. Use appropriate probe compensation 5. Verify measurement uncertainty 6. Document probe configuration ``` ### Non-Conformance Handling #### Disposition Options | Disposition | Application | Authority | |-------------|-------------|-----------| | Use As-Is | Minor deviation, no impact | Engineering | | Rework | Can be brought to spec | Quality | | Repair | Alternate method to restore | Engineering | | Scrap | Cannot be made conforming | Quality | | Return to Supplier | Vendor issue | Purchasing | #### Documentation Requirements ``` Non-conformance record: - NC number - Characteristic affected - Requirement - Actual condition - Root cause analysis - Corrective action - Disposition and approval ``` ### FAI Approval Process ``` Approval workflow: 1. Inspector completes inspection 2. Quality review forms 3. Engineering review (if NC exists) 4. Quality approval signature 5. Customer approval (if required) 6. Archive and distribution ``` ## Process Integration - ME-023: First Article Inspection (FAI) ## Input Schema ```json { "part_info": { "part_number": "string", "revision": "string", "description": "string", "drawing_number": "string" }, "fai_type": "full|partial|delta", "trigger": "new_part|design_change|process_change|other", "previous_fai": "string (if partial/delta)", "special_requirements": { "customer_approval": "boolean", "special_processes": "array" } } ``` ## Output Schema ```json { "fai_plan": { "fai_number": "string", "balloon_drawing": "file reference", "characteristic_count": "number", "measurement_methods": "array" }, "fai_forms": { "form_1": "document reference", "form_2": "document reference", "form_3": "document reference" }, "results_summary": { "total_characteristics": "number", "conforming": "number", "non_conforming": "number", "nc_numbers": "array" }, "approval_status": { "status": "approved|conditional|rejected", "conditions": "array (if conditional)", "approved_by": "string", "date": "date" } } ``` ## Best Practices 1. Review drawing completely before ballooning 2. Ensure measurement method capability 3. Document traceability to raw material 4. Obtain certifications for special processes 5. Address all non-conformances before approval 6. Maintain FAI records per retention requirements ## Integration Points - Connects with GD&T Drawing for requirements - Feeds into Design Review for verification evidence - Supports Process Planning for capability verification - Integrates with Quality systems for record keeping