ClientSt0r **Self-hosted IT documentation and service desk for MSPs.** Keep customer documentation, assets, credentials and support workflows on your own infrastructure — one place for the runbook, the device it describes, the credential it needs, and the ticket it came from. [![License: MIT](https://img.shields.io/github/license/agit8or1/clientst0r?color=blue)](LICENSE) [![Latest release](https://img.shields.io/github/v/release/agit8or1/clientst0r?label=release)](https://github.com/agit8or1/clientst0r/releases) [![CodeQL](https://github.com/agit8or1/clientst0r/actions/workflows/codeql.yml/badge.svg)](https://github.com/agit8or1/clientst0r/actions/workflows/codeql.yml) [![Docker image](https://github.com/agit8or1/clientst0r/actions/workflows/docker-image.yml/badge.svg)](https://github.com/agit8or1/clientst0r/actions/workflows/docker-image.yml) [Quick Start](#quick-start) · [Screenshots](docs/screenshots.md) · [Walkthrough](#watch-it-work) · [Documentation](#documentation) · [Releases](https://github.com/agit8or1/clientst0r/releases) · [Report a bug](https://github.com/agit8or1/clientst0r/issues/new?template=bug_report.yml) · [MSP Reboot](https://mspreboot.com)
--- [![The ClientSt0r dashboard for a managed client: quick actions, record counts, and panels for the next seven days of scheduled work, outstanding tasks and website monitor status](docs/images/github/client-dashboard-light.png)](docs/images/github/client-dashboard-light.png) ## Watch it work [![Walkthrough video: a technician moves from the client dashboard into the queue, opens a ticket carrying its contract and credentials, reads the runbook behind it, and finishes on what the month earned](docs/images/github/walkthrough-poster.png)](docs/images/github/walkthrough.gif) **[▶ Watch the full 3-minute walkthrough (MP4, 4.5 MB)](https://github.com/agit8or1/clientst0r/releases/download/v3.17.558/clientst0r-walkthrough.mp4)** — or the [56-second highlight](https://github.com/agit8or1/clientst0r/releases/download/v3.17.558/clientst0r-walkthrough-highlight.mp4). The animation above is a 34-second excerpt. It runs through three end-to-end workflows — a ticket from queue to runbook, the week scheduled on the dispatch board and a project plan, and quote to invoice to profitability — with a deliberate light-to-dark transition partway. It is caption-led; there is no narration track. [Transcript](docs/media/walkthrough.txt) · [captions](docs/media/walkthrough.vtt) · regenerate it, or the screenshots, with [`scripts/demo/`](scripts/demo/README.md). ## Why MSPs run it **Documentation that sits next to the work.** A ticket opens with the client's active contract, the asset it concerns, the runbook that covers it and the vault entries the technician will need — without leaving the ticket or opening a second product. Secrets are never rendered into the ticket page; opening one goes through the vault's own permissions and is logged. **A service desk you own, not one you rent.** Queues, SLA timers with pause logic, time entries, quotes, invoices, contracts, projects, approvals and workflow rules are built in and run on your server. Your ticket history and your client data stay in your database, on your hardware, under your backup policy. **One tenant per client, from day one.** Every asset, document, credential, location and ticket belongs to an organization. Technicians switch client context in one click; role-based membership decides who sees what. Multi-site clients, parent/child organizations and per-client PSA settings are first-class, not bolted on. ## See it in action A ticket that already knows the customer — contract, SLA countdown, internal notes kept apart from client replies, and the credentials the job needs, listed but never revealed. [![Ticket detail showing the client's active contract, SLA countdown, internal and client-visible activity, the linked asset, vault context with every secret hidden, and logged time](docs/images/github/ticket-detail-light.png)](docs/images/github/ticket-detail-light.png)
Service desk queue in dark theme listing twelve tickets across four clients with subject, client, priority, status, queue, assignee and age One queue, every client · Dark
Filter by status, priority, queue or technician.
Dispatch board in dark theme showing a week of scheduled work by technician with an SLA-at-risk banner Dispatch the week · Dark
Drag a ticket onto a technician; breaches surface up top.
Rack elevation in dark theme showing a 42U rack populated with firewall, core switch, patch panel, servers, NAS and UPS at their unit positions What is actually in the rack · Dark
Each device linked to its asset record.
Project timeline in light theme: a Gantt chart of seven tasks with milestones marked Projects with dependencies · Light
Drag a bar to reschedule; blocked work is flagged.
Password vault in dark theme listing nine credentials with title, username and security status, every secret hidden Credentials, never on screen · Dark
AES-GCM at rest; every reveal audited.
Profitability by client report in light theme showing revenue, cost, margin and blended margin percentage What the month earned · Light
Revenue against cost of delivery, from logged time.
**[See all 28 screenshots →](docs/screenshots.md)** — light and dark, across documentation, the service desk, dispatch, projects, reporting and administration. ## Quick Start ### Docker (recommended) Requires Docker Engine 24.0+ with the Compose v2 plugin, about 2 GB of disk for the image and 1 GB for the database volume. ```bash git clone https://github.com/agit8or1/clientst0r.git cd clientst0r cp .env.example .env # edit .env — at minimum: SECRET_KEY, DB_PASSWORD, DB_ROOT_PASSWORD, APP_MASTER_KEY docker compose up -d ``` Open `http://localhost:8000`. The entrypoint runs migrations and collects static files on first boot; set `DJANGO_SUPERUSER_*` in `.env` and it creates the admin account too. Pre-built images are published to `ghcr.io/agit8or1/clientst0r`. Optional services are behind compose profiles: ```bash docker compose --profile proxy up -d # Nginx + TLS on 80/443 docker compose --profile cache up -d # Redis (only if you switch CACHES to Redis) ``` Full guide: **[docs/docker.md](docs/docker.md)**. ### Native install on Ubuntu or Debian Ubuntu 20.04+ / Debian 11+, 2 GB RAM (4 GB recommended), 10 GB free disk. The installer adds Python 3.12, MariaDB, Gunicorn and the systemd units, generates the encryption keys, runs migrations and starts the service. ```bash git clone https://github.com/agit8or1/clientst0r.git && cd clientst0r && bash install.sh ``` It detects an existing installation and offers upgrade, system check or clean reinstall. Full guide: **[INSTALL.md](INSTALL.md)**. ### First steps after install 1. Sign in and enrol 2FA — it is enforced for every account by default. 2. Create your first client organization under **Admin → Organizations**. 3. Turn the service desk on under **Admin → System → Settings → Feature Toggles** (`psa_enabled` is off by default, so the PSA menu stays hidden until you switch it on). ## Updating and backups **Update** from **Admin → System → System Updates** in the web UI: *Check for Updates*, then *Apply*. The apply step is a graceful reload — no manual service restart. CLI fallback: ```bash git pull && python manage.py migrate && sudo systemctl restart clientst0r-gunicorn.service ``` Under Docker, `docker compose pull && docker compose up -d`. **Back up before every upgrade.** The bundled command writes the database and media to a single archive: ```bash python manage.py backup --output-dir /var/backups/clientst0r --encrypt --retention-days 30 ``` Docker users: see [Backups](docs/docker.md#backups) for the volume-level equivalent. ## Supported versions and limitations - Security fixes land on the current **3.17.x** line. See [SECURITY.md](SECURITY.md). - **Single-server by design.** There is no clustered or multi-node deployment story; it targets one VM or one container host per MSP. - **Self-hosted only.** There is no hosted service and no public demo instance — you run it. - **The service desk is opt-in.** `psa_enabled` is off until an administrator turns it on. - **AI-assisted features are optional** and gated behind `psa_ai_enabled`. Nothing calls an external model unless you enable it and supply a key. - Third-party PSA and RMM integrations (ConnectWise, Autotask, HaloPSA, NinjaOne, Datto RMM, Syncro, Atera and others) are supported for teams that already run one — but the service desk here is native, not a front end for someone else's. ## Security - Enforced TOTP 2FA, Argon2 password hashing, brute-force lockout, session timeouts. - AES-GCM encryption at rest for vault entries, integration credentials and API keys. - Per-entry vault access rules, approval and break-glass flows, audited reveals. - Optional Azure AD / Entra ID SSO and LDAP / Active Directory authentication. - CodeQL and dependency scanning run on every push to `main` and weekly. **Found a vulnerability?** Please report it privately via [GitHub Security Advisories](https://github.com/agit8or1/clientst0r/security/advisories/new) rather than a public issue. Full policy and response timelines: [SECURITY.md](SECURITY.md). ## Documentation | Guide | What it covers | |---|---| | [Installation](INSTALL.md) | Native install, upgrade, troubleshooting | | [Docker](docs/docker.md) | Compose layout, profiles, backups, upgrades | | [Features](FEATURES.md) | Full capability list by area | | [Screenshots](docs/screenshots.md) | Complete visual tour | | [Roadmap](docs/ROADMAP.md) | Shipped, in progress and planned phases | | [Changelog](CHANGELOG.md) | Release history | | [Integrations](docs/INTEGRATION_SETUP_GUIDE.md) | Connecting PSA, RMM, M365, accounting and distributors | | [API](API_V2_GRAPHQL.md) | REST and GraphQL endpoints | | [Security](SECURITY.md) | Policy, supported versions, reporting | | [FAQ](docs/faq.md) | Common questions | | [More docs](docs/README.md) | Everything else | ## Contributing Issues and pull requests are welcome. - **Bugs:** [open a bug report](https://github.com/agit8or1/clientst0r/issues/new?template=bug_report.yml) - **Ideas:** [open a feature request](https://github.com/agit8or1/clientst0r/issues/new?template=feature_request.yml) - **Code:** fork, branch, add a test in the relevant app's `tests.py`, run `python manage.py test `, then open a PR. See [CONTRIBUTING.md](CONTRIBUTING.md). ## Support Questions and troubleshooting go in [GitHub Issues](https://github.com/agit8or1/clientst0r/issues) or [Discussions](https://github.com/agit8or1/clientst0r/discussions). ## License MIT — see [LICENSE](LICENSE). Use it, fork it, run it for your clients. ## MSP Reboot ClientSt0r is built by the people behind **[MSP Reboot](https://mspreboot.com)** — an MSP consulting practice run by a former 25-year MSP owner, working with owners on pricing, operations, margins, service delivery and technology strategy. **Managed hosting and commercial support are available** through MSP Reboot for teams that would rather not run it themselves, or want someone on the hook when something breaks. [Get in touch](https://mspreboot.com) for scope and pricing. None of that is required to use ClientSt0r. The software is MIT-licensed and every first-party feature is free and unrestricted when you self-host it — no paid tiers, no seat or client limits, no licence activation, and no feature that only works with a subscription. Paying for hosting or support buys you our time and infrastructure, not access to the product. ---
If ClientSt0r saves you time, a ⭐ helps other MSPs find it. Built by a small team and one German Shepherd. 🐕 Luna supervises.