# The negotiation loop **Most of an estimator's time goes into revisions, not first drafts.** That is why this is core behaviour rather than a follow-up feature. --- ## A counter is not a new quote When a customer comes back — "can you do better at 1,000?", "we need it two weeks earlier", "drop the anodize" — **revise the existing quote in place and preserve a change record.** Treating a counter as a fresh quote is how a plant ends up with four versions in circulation, no record of what was conceded, and two people quoting the same job to the same customer at different prices. It happens constantly, and it is entirely a bookkeeping failure. --- ## What the change record holds Per revision: | | | |---|---| | Revision number and date | Sequential, on one quote, not a new reference | | What the customer asked for | In their words | | What changed in the quote | Line by line, old value to new value | | **Why it changed** | The reason, not just the delta | | What did not change, and was asked about | The concessions that were declined | **That "why" column is the one that matters.** Six months later somebody needs to know whether the price dropped because the quantity went up, because a material price was re-checked and had fallen, or because somebody gave away four points of margin to win the job. Those are three completely different facts and only one of them is repeatable. **Record what was declined, too.** A customer who asked for 60-day terms and did not get them will ask again on the next order, and the estimator should walk in knowing that. --- ## Re-derive, do not patch When a parameter changes, **re-run the affected buildup lines rather than adjusting the total.** A quantity change means setup re-amortizes across the new quantity. A material change means a new price at a new date, a new scrap allowance, and possibly a new routing. Patching a total by hand loses that and produces a quote whose cost-basis sheet no longer reconciles with its own front page — which is exactly the document the estimator was going to defend to their manager. Re-derive, then show the diff against the prior revision. **Re-derive from the stored operation record** (`hours-ladder.md`, *The operation record*): the rung, path, setup and run per operation as priced. A quantity change re-amortizes setup from it; a price counter re-prices from it. **A price counter never reopens CAD** and never re-runs the hours step — nothing about the part changed. **A drawing revision is not a counter.** A new revision can change what every operation cuts, so it goes back to `rfq-to-quote` step 7 for a new geometry estimate and a new Gate 3, and the hours are derived again. Pricing a new revision on the old revision's hours is the same mistake as pricing it on a superseded routing. --- ## Margin concessions are shown, never absorbed If the revision is a price drop with no change in scope, then **margin moved**, and the change record says so explicitly with the before and after. The temptation is to present a lower price as though something in the cost changed. It did not. An estimator needs to see the margin line move so they know how much room is left before the next round, and a manager needs to see it to know what the job is actually worth. --- ## Watch for scope creeping in with the counter Customers frequently bundle a scope change into what sounds like a price negotiation. *"Can you do $3.80? And we'd need the first article two weeks earlier."* **Separate those.** Price the scope change as a scope change, show it as its own line in the revision, and let the estimator decide whether it is a concession or a new requirement. A scope change absorbed silently into a price negotiation is how margin disappears without anyone being able to point at where. --- ## Every revision goes through the gate A revision is a customer-facing document like any other. It is drafted, shown with its diff, and **released by the estimator.** Nothing goes out because it is the second version of something already approved.