# The interview — every config group, in order **Who is answering.** A quality manager, a supervisor, an estimator or a plant manager. Not an IT admin. Ask in their language, one question at a time, and accept "I'd have to ask" as a complete answer. **The whole interview is answerable in one sitting**, and every group can be deferred. A deferred group goes on the gaps list with the affected skills named. Nothing here blocks setup. Group numbers match the step numbers in `../SKILL.md`. Time configuration is group 4 and has its own file, `time-config.md`; the document drop is group 2 and has its own file, `document-intake.md`; connector options are Step 12 and have their own file, `connector-options.md`. --- ## Order, and why Run in this order. It front-loads what can be read rather than asked, so the user answers fewer questions. | # | Group | Mostly read, or mostly asked | |---|---|---| | 1 | Systems | Asked by category, then the four supported connectors tested | | 2 | Documents | Collected in bulk, classified, mined | | 3 | Export folder and dropped files | Read, then confirmed one at a time | | 4 | Time configuration | Asked, then tested | | 5 | Vocabulary and report depth | Asked, short — or confirm-or-correct from documents | | 6 | Sites | Asked, short | | 7 | Capability profile and machining data | Asked, medium — mostly confirm-or-correct where a routing or asset register came in | | 8 | Standards, clauses and approved suppliers | Collected as documents | | 9 | Templates | Collected as files | | 10 | Commercial rates | Asked, shown once for a yes, saved as confirmed in the plant profile unless set in the environment | **Any question a Step 2 document already answered is asked as *confirm or correct*, naming the file.** *"Your quality manual says AS9100 Rev D, certificate expiring March 2027 — still right?"* Never ask the user to retype what they just handed over. Sites is group 6 rather than last because groups 4, 5 and 7 are site-scoped. Ask whether there is more than one plant before capturing anything that varies by plant. --- ## 1 — Systems One open question per category. **Name no product as an option**: a list of examples reads as the plugin's preference, and the person types what they actually run. Any name, or none, is accepted. > *"First, what you run. What do you use for orders and invoicing?"* > > *"What do you use for design or CAD, if anything?"* > > *"What do you use for maintenance, if anything?"* > > *"And for documents and email?"* **One of the four supported connectors** (Microsoft 365, Oracle NetSuite, Infor M3, Autodesk Fusion) — test it now. - **What is live, what is not.** - **What it actually returns for this account.** Do not assume the standard schema. NetSuite in particular is heavily customised per customer, so read back the record types and a sample of fields that actually came through. For Infor M3, the test is `MNS150MI_GetUserData_CurrentUser`; read back the company, division, facility and warehouse it returns, and the calls in `../../../shared/erp-connectors.md` that answer. Name the M3 data the plugin cannot get from it (standard cost, quote history), once, here. - **Infor M3 is not Infor CloudSuite Industrial or Infor LN.** "Infor" alone is asked which one. Only M3 is supported; the others are named systems. - **Not live** — quote its row in the setup-steps table word for word. - **Do not pull business data during this step.** This is a reachability and shape check, not a data pull. **Anything else** — accept the name as given and say what happens next, nothing more: > *"No supported connector for Limble. I'll run your maintenance data on exports > for now and look at connector options at the end of setup."* No search, no setup steps, no mention of `custom-connector` here. Step 12 does that once, for every system at the same time. Record each answer in the profile's `### Systems` section: the name, and one of `live (supported)`, `live (custom)`, `file`, `none`. **Never connect anything on the user's behalf, and never take a credential in conversation.** Credentials go into connector settings. Where a connector needs an admin action the plant person cannot perform, say exactly what to ask for and who to ask. --- ## 2 — Documents See `document-intake.md`. The exact list, the skip tags for what a live connector covers, classification before deep reading, and the guardrails on what a mined value may and may not do. --- ## 3 — Export folder and dropped files The plugin's data foundation is not "connect to the MES." It is a folder where the plant's existing scheduled exports land, on a predictable path and cadence. 1. **Ask where the exports land.** "Your MES and inspection reports get dropped somewhere on SharePoint or OneDrive on a schedule. Where do they land?" 2. **List what is actually there.** 3. **Infer what each file is from its headers, then have the user confirm each one.** Never accept the inference alone. A file identified wrong is worse than a file not identified, because it will be joined. 4. **Record the refresh cadence and coverage window per file.** **A file dragged into the conversation is a valid first-run source.** Confirm it the same way, one at a time, and record its cadence as **manual, not scheduled**. Then say what that means in one line: *"That works today. The morning pulse runs on its own overnight, so it needs this file landing on a schedule or a live connector — here's the export spec for IT."* ### When the exports do not exist yet Common, and not a dead end. Produce an export request specification the plant's IT can implement without a follow-up call: exact fields with types and units, file format and encoding, naming convention, landing path, cadence, the window each file covers, and what to do about late or corrected records. IT is far more willing to schedule a report than to issue credentials, so this is frequently the fastest path to data in the whole build. It is also the path from a manual, dragged-in file to a scheduled one. ### The maintenance export, specified Where the plant's CMMS has no live connector, this is the spec to hand IT. It is what `breakdown-diagnosis`, `daily-production-report` and `data-consolidate` read in place of a CMMS connector. | Field | Type | Unit / format | Required | Notes | |---|---|---|---|---| | `work_order_id` | text | — | yes | The CMMS's own ID, unchanged | | `asset_id` | text | — | yes | The same asset ID the MES downtime export uses; if the systems differ, both columns | | `asset_name` | text | — | yes | Plant's name for the machine | | `type` | text | `corrective` / `preventive` / `inspection` | yes | Map the CMMS's own types; never leave blank | | `status` | text | `open` / `in_progress` / `closed` | yes | | | `opened_at` | timestamp | ISO 8601 **with offset** (`2026-09-08T06:12:00-04:00`) | yes | Naive timestamps break cross-system correlation | | `closed_at` | timestamp | ISO 8601 with offset | when closed | Blank, never zero, while open | | `failure_mode` | text | — | no | The CMMS's failure code or category | | `close_out_note` | text | — | no | Free text, verbatim; `breakdown-diagnosis` mines it | | `parts_used` | text | `part_no:qty;…` | no | | | `labor_hours` | number | hours, decimal | no | | | `pm_plan_id` | text | — | no | Which PM plan, for preventive work | - **Format:** CSV, UTF-8, header row, comma-delimited, quoted text fields. - **Naming:** `cmms_maintenance_.csv`, dated the day of export. - **Landing path:** the plant's export folder, beside the MES files. - **Cadence:** nightly, landing by 02:00 local, or whatever the MES files use. - **Window:** a rolling 90 days of `opened_at`, so a work order reopened or closed late is picked up on the next export. - **Late or corrected records:** re-exported in full inside the window; the newest file wins on `work_order_id`. - **Asset register:** a second file, `cmms_assets_.csv` — `asset_id`, `asset_name`, `work_center`, `cell`, `make`, `model`, `install_date` — weekly is enough. --- ## 4 — Time configuration See `time-config.md`. Per-source zones, shift pattern, production-day boundary, cross-midnight attribution, planned-production-time definition, then the offset self-check. --- ## 5 — Vocabulary and report depth Short, and it changes every output the plant ever reads. > *"A couple of quick ones so my reports sound like your plant. Do you call it a > job, a work order, or a traveler? And is it a cell, a line, or a work center?"* Capture the plant's word for each of the six join keys and for their organizational units. Canonical names are in `../../data-consolidate/reference/join-keys.md`; the plant's words are what gets displayed. Where the plant's word collides with a build term, record both. **"Work order" is the one that always collides**, because maintenance systems call repair tickets work orders too. **Report depth**, one optional question: > *"When I write up an NCR or an 8D, do you want the summary first with the > detail behind it, or the full detail straight away?"* Recorded as `summary-first` or `full`. Deferred means `full`. --- ## 6 — Sites > *"Is this one plant, or several?"* If several: get the names, and ask which is the default for a run that does not say. Then ask groups 4, 5 and 7 per site, offering inheritance rather than repeating the whole interview. > *"Brantford — same vocabulary and capability as Fairview, or different? I only > need the differences."* --- ## 7 — Capability profile and machining data Feeds `customer-inquiry-intake`'s manufacturability check and bid/no-bid recommendation. Ask as what the plant can and cannot build, not as a spec sheet. - **Materials** routinely run, and any explicitly not run - **Processes** available in-house, and what goes outside - **Size envelope** — the largest thing that fits the machines - **Tolerance capability** — the tightest tolerance demonstrated, by process. Ask for demonstrated, not aspirational; this number is the basis for declining work - **Certifications held**, with expiry dates where relevant Missing this group means bid/no-bid degrades to a constraint-free recommendation and must say so. That is a real loss, so it is worth the five minutes. ### Machining data Feeds `quote-build`'s hours ladder when a part has no current routing. Where a routing export or asset register came in at Step 2 or 3, most of this is *confirm or correct*. > *"For quoting from drawings, I need a few shop-floor numbers. What kinds of > machines do you have — saws, 3-axis mills, lathes — and which work centers > and cells are they? Roughly how long is a typical setup on each, and how long > does a tool change take?"* - **Machine classes** — each class, its work centers and cell, setup hours and tool-change minutes. **Ask whether each figure was measured or is a best guess, and record `measured` or `assumed`.** An assumed figure is still used; it is named whenever it drives a variance. - **Cutting data** — per material and tool class, surface speed (SFM) and chip load (inch per tooth). Or the name of the plant's Fusion tool library, if that is where they keep it. *"If you don't keep cutting data, that's fine — hours from a drawing will be labelled as library defaults until you do."* An estimator's ballpark is recorded as `assumed`, never as plant data. - **Variance-flag threshold** — *"How far apart can two estimates of the same operation be before you want it flagged?"* Deferred means the 15% default, labelled as not plant-set. - **Stale interval** — *"How old can a cost or an actual be before you'd stop trusting it?"* In days. Fields and format: `config-profile.md`, *Machining data*. --- ## 8 — Standards, clauses and approved suppliers - **Which standards the plant is certified to** — ISO 9001, AS9100, IATF 16949, with revision - **Standard quality clauses** imposed on suppliers — material certs, first article inspection, PPAP submission level, right-of-access for audits - **Standard commercial terms** — payment, freight, packaging, liability, tooling ownership - **Approved suppliers, by commodity** — bar stock, castings, black oxide, heat treat. Where the ERP (NetSuite or Infor M3) is live, read the vendor list and ask only which are approved for what; the ERP holds vendors, not approvals. Ask for the plant's existing standard clause list and approved supplier list as documents rather than reconstructing them in conversation. They exist; somebody in purchasing has them. --- ## 9 — Templates > *"Send me one real example of each and I'll work out the shape from it — no need > to describe them."* Five documents, each plant-specific and often customer-program-specific: | Template | Consumed by | |---|---| | NCR form | `ncr-writeup` | | 8D format | `root-cause-capa` | | Quote layout | `quote-build` | | Supplier RFQ package | `supplier-quote-request` | | Trade study memo | `trade-study-report` | **Derive the structure from a real example, never from a generic version.** A customer-required 8D has a contractual shape, and a plausible-looking substitute is worse than an admitted gap. Collect the templates whenever the user has them to hand, and let them defer freely — a plant that hasn't run a trade study yet has no reason to produce a trade study memo template on day one. Say that honestly rather than implying urgency. --- ## 10 — Commercial rates Labor rate, burden rate and margin rules are commercially sensitive; downtime cost per hour is derived from them and inherits the same handling. Capture the actual values — this group is asked for real, not as a pointer to who holds them. The storage rule is `../../../shared/secret-config.md`. Check the four `MFG_*` variables by name first, without printing them. Any that is set is recorded as *set in environment* and not asked. Ask for the rest: > *"Last one — and this one's sensitive. Do you have your labour rate and > burden rate to hand? I'll save them in the plant profile, so quotes and the > morning report can use them without asking again. Anyone at the plant who > can see this plugin's memory can read that profile, and the numbers never > go on a customer quote. If you'd rather keep them out of the profile > entirely, your IT team can set them as environment variables instead."* Then margin, in plain words — never ask anyone to write JSON: > *"What margin do you usually quote at? And is there any customer, or any > kind of job — prototypes, rush work — where it's different?"* Record the answer as a `default` plus `by_customer` and `by_job_type` overrides, in the shape of `MFG_MARGIN_RULES`. A rule that does not fit that shape ("depends on the job") is recorded as said and goes on the gaps list. Then downtime: > *"And a figure for what an hour of downtime costs you — that's the one that > makes the morning report price a stoppage in dollars rather than minutes."* Four values, not three. **Downtime cost per hour is asked, never derived.** Deriving it from labor and burden understates it — it omits lost contribution and the cost of the missed commitment — and the plant's own figure is the one they will defend in a production meeting. If they don't have one, that is a placeholder and a gaps-list row like any other. **Ask who is giving the rates** if they haven't said: *"And who should I put down as the source for these?"* Every confirmed rate carries that name and the date. Never infer the name. **Show the values once, for a check.** The approval draft carries a section headed *Commercial rates — internal, check these before you say yes*, with each rate's value. That section is the only place in the conversation the values are restated; the question asking for the yes, the confirmation after the write and everything else name the rates without their values. Written only on an explicit yes, as **confirmed**, with the name and the date. Sensitivity here is about **storage and audience, not secrecy from every consumer.** These values are usable and displayable in internal artifacts (`quote-build`'s cost-basis sheet, priced downtime in the morning report) — never in a customer-facing artifact, the readable setup summary, the config profile page, the gaps list, sample data, or logs. After the write, confirm by name ("labor rate is confirmed in the plant profile"), not by value. **Credentials are never taken this way.** If someone pastes a token, password or API key in the middle of this group, it is refused and never repeated, per `../../../shared/secret-config.md`. **Scrap costing basis is not in this group, and isn't asked as a question here.** It's internal-only but not confidential in the same way (it already sits in the ERP), so at this point in the interview — not Step 1's reachability check, which never pulls business data — read it directly from the NetSuite connector if it's live: "standard cost from NetSuite" is a method, not a rate, and the connector is the source of truth for which method the plant actually uses. Infor M3 does not give standard cost to this plugin (`../../../shared/erp-connectors.md`), so with M3 it is asked, like any other unconnected ERP. Where NetSuite isn't connected, ask for it here instead, as a plain (non-sensitive) config value, and record which source supplied it. Expect "I'd have to ask" throughout this group. That is a complete answer — record a marked placeholder with its assumption and put it on the gaps list, naming the rate, never its value. When the real value arrives later ("update our labour rate"), it becomes confirmed and drops off the gaps list.