{ "data": [ { "id": 875092, "parent_id": 874881, "title": "Transitional Arrangements for Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.Part ZF", "chapter": "11", "content": null, "content_type": "part", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881" }, "parent": { "id": 874881, "parent_id": null, "title": "Savings and Transitional Rules", "description": null, "index": "11", "chapter": "11", "content": null, "content_type": "chapter", "metadata": { "is_glossary": false }, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881", "parent": null }, "parent": [] }, "children": [ { "id": 875093, "parent_id": 875092, "title": "Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.36", "chapter": "11", "content": null, "content_type": "rule", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092" }, "parent": [], "children": [ { "id": 875094, "parent_id": 875093, "title": "Definitions", "description": null, "index": "11.36.1", "chapter": "11", "content": "
In this rule:
relevant commencement date, for a relevant metering installation, means the day on which the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect.
relevant metering installation has the meaning given by rule 11.36.2.
specified amount means the amount assigned to variable \"y\" in accordance with S7.2.3 in relation to a participating jurisdiction.
supply point means a supply point:
volume consumption means the volume of energy consumed by a customer through the relevant supply point calculated in accordance with S7.2.3.
This rule:
Despite clauses 7.2.2 and 7.2.3, the responsible person for a relevant metering installation is the regulated distribution system operator to whom the Ministerial smart meter roll out determination (that applies to that relevant metering installation) applies.
", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875097", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875098, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.5", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875098", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875099, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.6", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875099", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] } ] } ], "search_index": 1, "version": { "version_id": 803, "version": 251, "approved": 1, "current": 1, "archived": 0, "type": "ner", "start_date": "2026-07-23 00:00:00", "end_date": null }, "search_content": "Transitional Arrangements for Ministerial Smart Meter Roll Out Determinations", "type": "chapter" }, { "id": 875093, "parent_id": 875092, "title": "Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.36", "chapter": "11", "content": null, "content_type": "rule", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092" }, "parent": { "id": 875092, "parent_id": 874881, "title": "Transitional Arrangements for Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.Part ZF", "chapter": "11", "content": null, "content_type": "part", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881" }, "parent": { "id": 874881, "parent_id": null, "title": "Savings and Transitional Rules", "description": null, "index": "11", "chapter": "11", "content": null, "content_type": "chapter", "metadata": { "is_glossary": false }, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881", "parent": null }, "parent": [] } }, "children": [ { "id": 875094, "parent_id": 875093, "title": "Definitions", "description": null, "index": "11.36.1", "chapter": "11", "content": "In this rule:
relevant commencement date, for a relevant metering installation, means the day on which the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect.
relevant metering installation has the meaning given by rule 11.36.2.
specified amount means the amount assigned to variable \"y\" in accordance with S7.2.3 in relation to a participating jurisdiction.
supply point means a supply point:
volume consumption means the volume of energy consumed by a customer through the relevant supply point calculated in accordance with S7.2.3.
This rule:
Despite clauses 7.2.2 and 7.2.3, the responsible person for a relevant metering installation is the regulated distribution system operator to whom the Ministerial smart meter roll out determination (that applies to that relevant metering installation) applies.
", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875097", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875098, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.5", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875098", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875099, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.6", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875099", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] } ], "search_index": 2, "version": { "version_id": 803, "version": 251, "approved": 1, "current": 1, "archived": 0, "type": "ner", "start_date": "2026-07-23 00:00:00", "end_date": null }, "search_content": "Ministerial Smart Meter Roll Out Determinations", "type": "chapter" }, { "id": 875094, "parent_id": 875093, "title": "Definitions", "description": null, "index": "11.36.1", "chapter": "11", "content": "In this rule:
relevant commencement date, for a relevant metering installation, means the day on which the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect.
relevant metering installation has the meaning given by rule 11.36.2.
specified amount means the amount assigned to variable \"y\" in accordance with S7.2.3 in relation to a participating jurisdiction.
supply point means a supply point:
volume consumption means the volume of energy consumed by a customer through the relevant supply point calculated in accordance with S7.2.3.