{ "data": [ { "id": 875092, "parent_id": 874881, "title": "Transitional Arrangements for Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.Part ZF", "chapter": "11", "content": null, "content_type": "part", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881" }, "parent": { "id": 874881, "parent_id": null, "title": "Savings and Transitional Rules", "description": null, "index": "11", "chapter": "11", "content": null, "content_type": "chapter", "metadata": { "is_glossary": false }, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881", "parent": null }, "parent": [] }, "children": [ { "id": 875093, "parent_id": 875092, "title": "Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.36", "chapter": "11", "content": null, "content_type": "rule", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092" }, "parent": [], "children": [ { "id": 875094, "parent_id": 875093, "title": "Definitions", "description": null, "index": "11.36.1", "chapter": "11", "content": "

In this rule:

relevant commencement date, for a relevant metering installation, means the day on which the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect.

relevant metering installation has the meaning given by rule 11.36.2.

specified amount means the amount assigned to variable \"y\" in accordance with S7.2.3 in relation to a participating jurisdiction.

supply point means a supply point:

(1)that is a connection point connected to the distribution system of a regulated distribution system operator; and
(2)through which the regulated distribution system operator is required to provide smart metering services in accordance with a Ministerial smart meter roll out determination.

volume consumption means the volume of energy consumed by a customer through the relevant supply point calculated in accordance with S7.2.3.

", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875094", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875095, "parent_id": 875093, "title": "Meaning of relevant metering installation", "description": null, "index": "11.36.2", "chapter": "11", "content": "
(a)For the purpose of this rule, a relevant metering installation is a metering installation for a supply point in respect of which the volume consumption of the customer is less than the specified amount.
(b)For the purpose of this rule, a relevant metering installation does not include:
(1)a metering installation installed for a supply point before the relevant commencement date in respect of which a Market Participant is the responsible person; or;
(2)a metering installation referred in paragraph (a) that is installed for the supply point referred to in that paragraph on and after the relevant commencement date in accordance with the ordinary replacement cycle of that Market Participant; or
(3)a metering installation located at a high voltage connection point.
", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875095", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875096, "parent_id": 875093, "title": "Period of application of rule to relevant metering installation", "description": null, "index": "11.36.3", "chapter": "11", "content": "

This rule:

(a)applies to a relevant metering installation on the day the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect; and
(b)ceases to apply to a relevant metering installation on the day the Ministerial smart meter roll out determination that applies to the relevant metering installation ceases to have effect.
", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875096", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875097, "parent_id": 875093, "title": "Designation of responsible person", "description": null, "index": "11.36.4", "chapter": "11", "content": "

Despite clauses 7.2.2 and 7.2.3, the responsible person for a relevant metering installation is the regulated distribution system operator to whom the Ministerial smart meter roll out determination (that applies to that relevant metering installation) applies.

", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875097", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875098, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.5", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875098", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875099, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.6", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875099", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] } ] } ], "search_index": 1, "version": { "version_id": 803, "version": 251, "approved": 1, "current": 1, "archived": 0, "type": "ner", "start_date": "2026-07-23 00:00:00", "end_date": null }, "search_content": "Transitional Arrangements for Ministerial Smart Meter Roll Out Determinations", "type": "chapter" }, { "id": 875093, "parent_id": 875092, "title": "Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.36", "chapter": "11", "content": null, "content_type": "rule", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092" }, "parent": { "id": 875092, "parent_id": 874881, "title": "Transitional Arrangements for Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.Part ZF", "chapter": "11", "content": null, "content_type": "part", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881" }, "parent": { "id": 874881, "parent_id": null, "title": "Savings and Transitional Rules", "description": null, "index": "11", "chapter": "11", "content": null, "content_type": "chapter", "metadata": { "is_glossary": false }, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881", "parent": null }, "parent": [] } }, "children": [ { "id": 875094, "parent_id": 875093, "title": "Definitions", "description": null, "index": "11.36.1", "chapter": "11", "content": "

In this rule:

relevant commencement date, for a relevant metering installation, means the day on which the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect.

relevant metering installation has the meaning given by rule 11.36.2.

specified amount means the amount assigned to variable \"y\" in accordance with S7.2.3 in relation to a participating jurisdiction.

supply point means a supply point:

(1)that is a connection point connected to the distribution system of a regulated distribution system operator; and
(2)through which the regulated distribution system operator is required to provide smart metering services in accordance with a Ministerial smart meter roll out determination.

volume consumption means the volume of energy consumed by a customer through the relevant supply point calculated in accordance with S7.2.3.

", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875094", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875095, "parent_id": 875093, "title": "Meaning of relevant metering installation", "description": null, "index": "11.36.2", "chapter": "11", "content": "
(a)For the purpose of this rule, a relevant metering installation is a metering installation for a supply point in respect of which the volume consumption of the customer is less than the specified amount.
(b)For the purpose of this rule, a relevant metering installation does not include:
(1)a metering installation installed for a supply point before the relevant commencement date in respect of which a Market Participant is the responsible person; or;
(2)a metering installation referred in paragraph (a) that is installed for the supply point referred to in that paragraph on and after the relevant commencement date in accordance with the ordinary replacement cycle of that Market Participant; or
(3)a metering installation located at a high voltage connection point.
", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875095", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875096, "parent_id": 875093, "title": "Period of application of rule to relevant metering installation", "description": null, "index": "11.36.3", "chapter": "11", "content": "

This rule:

(a)applies to a relevant metering installation on the day the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect; and
(b)ceases to apply to a relevant metering installation on the day the Ministerial smart meter roll out determination that applies to the relevant metering installation ceases to have effect.
", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875096", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875097, "parent_id": 875093, "title": "Designation of responsible person", "description": null, "index": "11.36.4", "chapter": "11", "content": "

Despite clauses 7.2.2 and 7.2.3, the responsible person for a relevant metering installation is the regulated distribution system operator to whom the Ministerial smart meter roll out determination (that applies to that relevant metering installation) applies.

", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875097", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875098, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.5", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875098", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] }, { "id": 875099, "parent_id": 875093, "title": "[Deleted]", "description": null, "index": "11.36.6", "chapter": "11", "content": null, "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875099", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": [], "children": [] } ], "search_index": 2, "version": { "version_id": 803, "version": 251, "approved": 1, "current": 1, "archived": 0, "type": "ner", "start_date": "2026-07-23 00:00:00", "end_date": null }, "search_content": "Ministerial Smart Meter Roll Out Determinations", "type": "chapter" }, { "id": 875094, "parent_id": 875093, "title": "Definitions", "description": null, "index": "11.36.1", "chapter": "11", "content": "

In this rule:

relevant commencement date, for a relevant metering installation, means the day on which the Ministerial smart meter roll out determination that applies to the relevant metering installation takes effect.

relevant metering installation has the meaning given by rule 11.36.2.

specified amount means the amount assigned to variable \"y\" in accordance with S7.2.3 in relation to a participating jurisdiction.

supply point means a supply point:

(1)that is a connection point connected to the distribution system of a regulated distribution system operator; and
(2)through which the regulated distribution system operator is required to provide smart metering services in accordance with a Ministerial smart meter roll out determination.

volume consumption means the volume of energy consumed by a customer through the relevant supply point calculated in accordance with S7.2.3.

", "content_type": "clause", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875094", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093" }, "parent": { "id": 875093, "parent_id": 875092, "title": "Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.36", "chapter": "11", "content": null, "content_type": "rule", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875093", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092" }, "parent": { "id": 875092, "parent_id": 874881, "title": "Transitional Arrangements for Ministerial Smart Meter Roll Out Determinations", "description": null, "index": "11.Part ZF", "chapter": "11", "content": null, "content_type": "part", "metadata": null, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/875092", "parent": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881" }, "parent": { "id": 874881, "parent_id": null, "title": "Savings and Transitional Rules", "description": null, "index": "11", "chapter": "11", "content": null, "content_type": "chapter", "metadata": { "is_glossary": false }, "links": { "self": "https://energy-rules.aemc.gov.au/api/v1/rules/803/content/874881", "parent": null }, "parent": [] } } }, "children": [], "search_index": 3, "version": { "version_id": 803, "version": 251, "approved": 1, "current": 1, "archived": 0, "type": "ner", "start_date": "2026-07-23 00:00:00", "end_date": null }, "search_content": "the ministerial smart meter roll out...", "type": "chapter" } ], "meta": { "current_page": 1, "first_page_url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=1", "from": 1, "last_page": 4, "last_page_url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=4", "links": [ { "url": null, "label": "« Previous", "active": false }, { "url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=1", "label": "1", "active": true }, { "url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=2", "label": "2", "active": false }, { "url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=3", "label": "3", "active": false }, { "url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=4", "label": "4", "active": false }, { "url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=2", "label": "Next »", "active": false } ], "next_page_url": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search?perPage=3&query=smart%20meter&page=2", "path": "https://energy-rules.aemc.gov.au/api/v1/rules/803/search", "per_page": 3, "prev_page_url": null, "to": 3, "total": 10 } }