slug: fieldwire provider: Fieldwire generated_by: planning/capability-mapping/scripts/classify_capabilities.py model: claude-opus-5 frame: - Infrastructure min_confidence: 0.7 capability_model: source: https://github.com/vincentmakes/turbo-ea-capabilities license: CC-BY-4.0 attribution: Turbo EA Capabilities by Vincent Verdet — Turbo EA, https://github.com/vincentmakes/turbo-ea-capabilities, CC BY 4.0 notice: NOTICE edge_count: 9 edges: - tag: Building Information Models spec_file: fieldwire-building-information-models-api-openapi.yml capability_id: BC-5060.10 capability_id_l1: BC-5060 capability_name: BIM Management confidence: 0.85 evidence: GET /projects/{project_id}/building_information_models; "attach Building Information Models (BIM) with versioned object trees" reason: Operations expose project BIM models with versioned object trees, which is BIM management within digital engineering. - tag: Actual Costs spec_file: fieldwire-actual-costs-api-openapi.yml capability_id: BC-5020.20 capability_id_l1: BC-5020 capability_name: Cost Estimating & Management confidence: 0.78 evidence: '"Project financial endpoints for budget management, actual cost tracking"; POST /projects/{project_id}/actual_costs Create Actual Cost In Project' reason: Recording and retrieving actual costs against a construction project is project cost control within capital project controls. - tag: Budget Line Items spec_file: fieldwire-budget-line-items-api-openapi.yml capability_id: BC-5020.20 capability_id_l1: BC-5020 capability_name: Cost Estimating & Management confidence: 0.75 evidence: GET /projects/{project_id}/budget_line_items Get Budget Line Items In Project; "Project financial endpoints for budget management" reason: Project budget line items are the cost baseline for a construction project — cost estimating and management under project controls rather than corporate budgeting. - tag: RFIs spec_file: fieldwire-rfis-api-openapi.yml capability_id: BC-5030.30 capability_id_l1: BC-5030 capability_name: Contract Administration confidence: 0.75 evidence: Track Requests for Information (RFIs), submittals, submittal types, spec sections ... across construction projects reason: RFIs are formal contract-administration information requests in construction delivery. Contract Administration is the closest fit; some ambiguity versus design/document coordination keeps confidence moderate. - tag: Floorplans spec_file: fieldwire-floor-plans-api-openapi.yml capability_id: BC-1130.20 capability_id_l1: BC-1130 capability_name: Drawing Management confidence: 0.7 evidence: POST /projects/{project_id}/floorplans Create Floorplan In Project; "Upload PDF drawing sets, manage sheet versioning and floorplan hierarchies ... calibrate scale" reason: Managing project drawing sheets/floorplans with versioning and hierarchy is drawing lifecycle and distribution to the field — engineering drawing management. recovered_from: vertical-engineering-services-edges.json reanchored_from: fieldwire-floorplans-api-openapi.yml - tag: Form Records spec_file: fieldwire-form-records-api-openapi.yml capability_id: BC-5040.60 capability_id_l1: BC-5040 capability_name: Construction Quality Management confidence: 0.7 evidence: capture form records ... Powers Fieldwire's daily reports, safety inspections, QA/QC checklists reason: Field data-capture forms on construction projects; operations create/get forms in a project. Best fit is construction quality management (QA/QC checklists, daily reports) within construction & field delivery, though safety inspections also touch HSE, hence moderate confidence. - tag: Sheets spec_file: fieldwire-sheets-api-openapi.yml capability_id: BC-5060.20 capability_id_l1: BC-5060 capability_name: Common Data Environment confidence: 0.7 evidence: Upload PDF drawing sets, manage sheet versioning and floorplan hierarchies ... keep the latest drawings in the field reason: Controlled distribution and versioning of project drawings is common-data-environment / project information management for the built asset. - tag: Spec Sections spec_file: fieldwire-spec-sections-api-openapi.yml capability_id: BC-1130.30 capability_id_l1: BC-1130 capability_name: Specification Management confidence: 0.7 evidence: GET /projects/{project_id}/spec_sections — Get Spec Sections In Project reason: Spec sections are the technical specification divisions (e.g. CSI) referenced by submittals; maps to specification management, though the surface is a single read-only list. recovered_from: vertical-engineering-services-edges.json - tag: Submittals spec_file: fieldwire-submittals-api-openapi.yml capability_id: BC-5030.30 capability_id_l1: BC-5030 capability_name: Contract Administration confidence: 0.7 evidence: Track Requests for Information (RFIs), submittals, submittal types, spec sections, attachments, markups, watchers, approvals reason: Submittal review/approval is a core construction contract administration obligation between contractor and design team.