generated: '2026-07-27' method: searched source: https://www.ieso.ca/sector-participants/change-management/it-release-schedule docs: https://www.ieso.ca/Sector-Participants/Change-Management/Pending-Changes-Documents note: >- IESO does not publish a developer changelog in the conventional sense. What it publishes instead is a forward-dated IT Release Schedule plus a per-baseline Pending Changes package — a change log that runs ahead of the change rather than behind it. Every entry below is taken verbatim from those two pages on 2026-07-27; nothing has been back-filled or reconstructed. scheme: baseline release train, R. current_baseline: R55.1 next_baseline: R56.0 cadence: category_3: >- Twice yearly. "Require market participants to make changes to their own technical interfaces." category_2: >- Four times yearly. "Require market participants to make a change in procedure or to update documentation." stages: [Preliminary Plan, Feedback Period, Target Plan, Final Plan, Sandbox Implementation, Production Build] feedback_contact: pending.changes@ieso.ca entries: - version: R56.1 category: 2 production_build: '2026-12-02' preliminary_plan: '2026-08-19' final_plan: '2026-10-14' sandbox: '2026-10-22' breaking: false highlights: [Procedure or documentation changes only; no participant technical-interface change required.] - version: R56.0 category: 3 production_build: '2026-09-09' preliminary_plan: '2026-05-27' final_plan: '2026-07-22' sandbox: '2026-07-30' comments_due: '2026-08-07' breaking: true breaking_note: Category 3 — requires market participants to change their own technical interfaces. highlights: - >- SPEC467 Retrofit LDC API — "New LDC API in Retrofit based on eDSM contracts for marketing and outreach". Replaces SPEC-188. - >- MM4.1 Dispatch Data Submission — "Resources may now submit reserve loading point values equal to zero for synchronized ten-minute operating reserve offers." Affects market data submission through the MIM web services. - FORM128 CAA Application — IBR models for FACTS devices added. - MM1.4 Connection Assessment and Approval — System Impact Assessment / Technical Feasibility Study deposit and invoicing updates. - MM1.5 Market Registration — resource terminology consistency; reliable integration study deposit requirements. - MM5.5 Settlement Amounts — modified ORCSB definition regarding inaccessible operating reserve. - Charge Types and Equations List — Renewable Generation Connection Compensation (CT1463) adjustment. - MM7.1 Grid Operating Procedures — new step added to the EOSCA List for Peak Perks activation. - MM7.2 Near-Term Assessments — tie-line connection reference updates. - MM7.4 Grid Operating Policies — NPCC Directory #1 alignment correction. - MM14.2 Reference Level Procedures — sections 10.1 and 10.3 revisions. - version: R55.1 category: 2 production_build: '2026-06-03' preliminary_plan: '2026-02-18' final_plan: '2026-04-15' sandbox: '2026-04-23' breaking: false - version: R55.0 category: 3 production_build: '2026-03-04' preliminary_plan: '2025-11-19' final_plan: '2026-01-14' sandbox: '2026-01-22' breaking: true breaking_note: Category 3 — participant technical-interface changes required. - version: R54.1 category: 2 production_build: '2025-12-03' preliminary_plan: '2025-08-20' final_plan: '2025-10-15' sandbox: '2025-10-23' breaking: false specification_revisions: - document: IMO_SPEC_0100 Outbound Automated Document API issue: 9.0 date: '2025-03-05' change: >- "Updated to reflect various changes to the URL for IESO Reports Site (public reports and REST API endpoint)." - document: IMO_SPEC_0100 Outbound Automated Document API issue: 7.0 date: '2016-02-08' change: Updated to document the IESO Report Site URL changes. - document: SPEC-232 Retrofit Service Provider API date: '2024-12-04' change: Specification updated.