generated: '2026-07-27' method: searched source: >- https://www.misoenergy.org/markets-and-operations/RTDataAPIs/ (the 2025-12-12 restructure notice), https://api.misoenergy.org/MISORTWDDataBroker/data-links.html (the legacy surface, still reachable), https://help.misoenergy.org/knowledgebase/article/KA-01489/en-us, https://www.misoenergy.org/markets-and-operations/notifications/it-and-system-notifications/, https://www.misoenergy.org/markets-and-operations/MSE/, plus derivation from openapi/. description: >- MISO versions its two public surfaces in two different ways and publishes neither policy formally. The Data Exchange gateway is versioned in the URI path at v1 and has not changed version. The Public API is versioned by announcement: on 2025-12-12 MISO moved it to a new host, changed every URL and dropped CSV and XML in favour of JSON only. There is no written deprecation policy, no RFC 8594 Sunset or Deprecation header support, no numeric SLA and no Statuspage-style uptime dashboard anywhere on any MISO host. versioning: data-exchange: scheme: uri-path current: v1 mechanism: /v1/ segment on every operation docs: https://data-exchange.misoenergy.org/apis public-api: scheme: none current: null effective_release: '2025-12-12' docs: https://www.misoenergy.org/markets-and-operations/RTDataAPIs/ note: >- No version token in the URL and no version header. The harvested specification uses 2025-12-12 as its info.version because that is the date of the restructure MISO announced, not a version MISO publishes. deprecation: policy_url: null policy_published: false sunset_header: false deprecation_header: false note: >- MISO publishes no deprecation policy document, gives no advance-notice commitment, and emits neither the RFC 8594 Sunset header nor the Deprecation header. Deliberately recorded as absent — no Deprecation pointer is claimed in apis.yml. events: - date: '2025-12-12' kind: breaking-change surface: Public API announcement: https://www.misoenergy.org/markets-and-operations/RTDataAPIs/ quote: >- "As of December 12, 2025, these data feeds are available in JSON format only. Please be aware that the underlying URLs have also changed for all links. This implementation is designed to improve consistency, performance, and future compatibility for accessing real-time data." impact: - Host moved from api.misoenergy.org/MISORTWDDataBroker to public-api.misoenergy.org - CSV and XML response formats withdrawn; JSON only - Every endpoint URL changed migration_guide: null grace_period: none published retired_surfaces: - name: MISORTWDDataBroker url: https://api.misoenergy.org/MISORTWDDataBroker/data-links.html status: legacy — data-links page still returns HTTP 200 (verified 2026-07-27) but the data endpoints return {"error":"no data"} superseded_by: https://public-api.misoenergy.org/ retired: '2025-12-12' sla: url: null uptime_target: null note: >- No uptime commitment of any kind. MISO's published product terms are the opposite of an SLA — "MISO DOES NOT WARRANT THAT ITS SITES WILL BE UNINTERRUPTED OR ERROR-FREE ... distributed on an AS IS, AS AVAILABLE basis." status_page: https://www.misoenergy.org/markets-and-operations/notifications/it-and-system-notifications/ status_page_kind: notifications-feed status_page_note: >- MISO runs no Statuspage/Statusgator-style component dashboard — status.misoenergy.org does not resolve, and misoenergy.statuspage.io is an unclaimed Atlassian marketing redirect, not a MISO page. What MISO does publish is an IT and System Notifications feed where system outages, maintenance windows and incident notices are posted, times in Eastern. Retention is short and explicit: "all Notifications except Market Settlements Notifications will be deleted after 30 days of the issue date." That feed is recorded here as MISO's operational-status surface; the limitation is stated rather than papered over. roadmap: https://www.misoenergy.org/markets-and-operations/MSE/ roadmap_note: >- The Market System Enhancements (MSE) programme is MISO's published forward-looking roadmap for the market systems that sit behind these APIs — Model Manager, the Day-Ahead and Real-Time Market Clearing Engines, the Operator Interface, an upgraded Energy Management System and the New Market User Interface (the MUI 2.0 surface in this profile). MISO publishes an MSE timeline graphic and gives quarterly stakeholder updates; RT-MCE is stated as expected to complete in 2026. data_revision_policy: interchange_window_days: 105 quote: >- "Data available within the interchange endpoints are subject to change up to 105 days after the market day due to reconciliation." source: MISO Data Exchange portal operation metadata deprecated_operations: [] deprecated_operations_note: >- No operation in any of the four harvested OpenAPI documents carries deprecated: true. change_log: null change_log_note: >- MISO publishes no dated API changelog or release-notes feed for either the Public API or Data Exchange. The 2025-12-12 restructure was announced as page copy on the RT Data APIs page, not as a changelog entry. No ChangeLog pointer is claimed.