generated: '2026-07-27' method: searched source: https://nslegislature.ca/legc/bills/64th_1st/3rd_read/b145.htm note: >- Nova Scotia Power publishes no API versioning policy, no deprecation policy, no SLA, no changelog, no roadmap and no API status page. The only lifecycle that genuinely exists here is a statutory one: a legislated implementation deadline that has passed with the API half of the obligation unmet. That is what this artifact records. versioning: scheme: external-standard current: NAESB ESPI v3.3 published_by_provider: false docs: null note: >- The version number comes from the Green Button Alliance's certification statement, not from Nova Scotia Power, which states no version anywhere. deprecation: policy_url: null sunset_header: unknown note: >- No deprecation or sunset policy is published, and there is no API surface to deprecate. No `Deprecation` pointer is emitted. observed_withdrawal: - url: https://www.nspower.ca/clean-energy/todays-energy-stats status: 404 note: >- Cited by the electricitymaps-contrib DATA_SOURCES.md as the source for the CA-NS zone. The page no longer exists — the live generation-mix surface third parties were scraping was withdrawn with no notice, no sunset header and no replacement. This is the closest thing to a deprecation event on record. sla: url: null uptime_target: null note: No SLA, availability commitment or support target is published for any data surface. status_page: null status_page_note: >- No API or platform status page exists. https://outagemap.nspower.ca/ is a KUBRA-hosted electricity outage map for customers — a consumer service-interruption widget operated by a vendor, not a Nova Scotia Power service-status surface and not a documented API. The prior round wired it as `StatusPage`; that pointer has been retyped to `OutageMap` so the profile does not claim an API status page that does not exist. https://outagereport.nspower.ca/ is the customer outage-reporting form, same category. statutory_lifecycle: regime: Electricity Act (Nova Scotia) s. 4F, added by Bill 145 (SNS 2022, c. 12) source: https://nslegislature.ca/legc/bills/64th_1st/3rd_read/b145.htm milestones: - date: '2022-04' event: >- Bill 145 receives Royal Assent, adding s. 4F to the Electricity Act and naming Nova Scotia Power Incorporated directly. status: met - date: '2022-09-01' event: >- s. 4F(2) — deadline to present the Board a compliance plan with "an implementation date that occurs no later than April 1, 2023". status: unverified note: No public record of the plan was found on Nova Scotia Power's or the regulator's site. - date: '2023-04-01' event: >- s. 4F(5) — statutory deadline for Green Button Alliance certification to BOTH "Connect My Data" and "Download My Data". status: partially met - date: '2023-05' event: >- Green Button Alliance records Nova Scotia Power as "Certified to ESPI v.3.3 for Download My Data (DMD) with CMD Certification planned". status: met (DMD leg only, one month after the deadline) source: https://www.greenbuttonalliance.org/canadian-initiatives - date: '2026-07-27' event: >- Re-verified. CMD certification still "planned". Nova Scotia Power's own page still states "Our Green Button Marketplace is currently closed", and the linked third-party registration form still returns HTTP 404. status: outstanding elapsed_past_deadline: 3 years 3 months extension_granted: unknown extension_note: >- s. 4F(5) allows the deadline to be extended by the Board. No published Board order granting an extension was found; recorded as unknown rather than as absent. access_lifecycle: states: - id: closed description: >- The Green Button Marketplace is closed. There is no registration, no connectivity testing, no approval and no issued-credential state — the only published route for a third-party application provider is a registration form that 404s. A developer cannot enter the lifecycle at all. connectivity_test_window_days: null cure_period_days: null change_communication: changelog: null changelog_note: >- No API changelog, release notes or developer bulletin is published. No changelog/ artifact is emitted. roadmap: null roadmap_note: >- No roadmap is published. The only forward-looking statement is the Green Button Alliance's "CMD Certification planned" and Nova Scotia Power's "please continue to check here for updates" — neither is a dated roadmap. No `Roadmap` pointer is emitted. news: https://www.nspower.ca/about-us/press-releases articles: https://www.nspower.ca/about-us/articles regulatory: https://www.nspower.ca/about-us/regulations/regulatory-initiatives contact: https://www.nspower.ca/customer-service deprecated_operations: [] related: - conformance/nova-scotia-power-conformance.yml - conventions/nova-scotia-power-conventions.yml - authentication/nova-scotia-power-authentication.yml