{ "rics:DataTransfer": { "rics:GeneratedBy": { "@name": "Andrew Knight" }, "rics:Currency": [ { "@iso4217Code": "AUD", "@isPrimaryCurrency": true } ], "rics:Property": [ { "@primaryUse": "MixedUse", "@reference": "1001", "@description": "New 2 storey office block, warehouse, soft landscaping and paving. Removal of existing buildings in completion", "@isPrimaryProperty": true, "rics:Address": { "xal:AddressDetails": [ { "xal:AddressLines": { "xal:AddressLine": [ "Canberra", "Australian Capital Territory", "Australia" ] } } ] } } ], "rics:CostedProjects": [ { "@title": "New Offices and Warehouse", "@projectType": "building", "@costReportStatus": "pre-constructionForecast", "@reportPriceBasis": "fixedUnitRates", "@projectStatus": "initiationAndConceptPhase", "@description": "New 2 storey office block, warehouse, soft landscaping and paving. Removal of existing buildings in completion", "rics:MetaData": { "@reportStatus": "final", "@reportRevisionNumber": "3", "rics:ReportDate": { "rics:Date": "2014-05-31" } }, "rics:Location": { "xal:AddressDetails": [ { "xal:AddressLines": { "xal:AddressLine": [ "Canberra", "Australian Capital Territory", "Australia" ] } } ] }, "rics:ConstructionPeriod": { "rics:Length": { "rics:Duration": "P15M" }, "rics:DateFrom": { "@definedBy": "startOfDemolitionAndSitePreparation" }, "rics:DateTo": { "@stateTo": "completionOfCommissioning" } }, "rics:Site": [ { "@stateOfUse": "brownfield", "@typeOfUse": "urban", "@legalStatus": "freehold", "@siteTopography": "principallyFlat", "@groundConditions": "soft", "@accessProblems": "average", "@extremeClimaticConditions": "easy", "@environmentalConstraints": "easy" } ], "rics:Procurement": { "@funding": "private", "@pricingMethod": "lumpSumStipulatedPrice", "@modeOfProcurement": "designBidBuild", "@isJointVentureForeignConstructor": false, "@predominantSourceOfConstructors": "local" }, "rics:Buildings": [ { "@title": "Office and Warehouse", "@description": "ICMS1 Data", "@element": "part", "rics:ProjectCode": { "rics:ClassificationStandard": [ { "@code": "01.04.02 (Commercial offices - Suburban/Regional B Grade", "@standard": "Building Code of Australia" } ] }, "rics:Costs": [ { "@category": "capitalConstructionCosts", "@group": "demolitionSitePreparationAndFormation", "@code": "1.01", "@subcode": "050", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Demolition of existing buildings", "@isNotApplicable": false, "rics:Total": 600000 }, { "@category": "capitalConstructionCosts", "@group": "demolitionSitePreparationAndFormation", "@code": "1.01", "@subcode": "060", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Site surface clearance", "@isNotApplicable": false, "rics:Total": 300000 }, { "@category": "capitalConstructionCosts", "@group": "demolitionSitePreparationAndFormation", "@code": "1.01", "@subcode": "080", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Site formation", "@isNotApplicable": false, "rics:Total": 320000 }, { "@category": "capitalConstructionCosts", "@group": "substructure", "@code": "1.02", "@subcode": "020", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Foundations up to top of lowest floor slab", "@isNotApplicable": false, "rics:Total": 1086000 }, { "@category": "capitalConstructionCosts", "@group": "structure", "@code": "1.03", "@subcode": "030.010", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Structural wall and columns", "@isNotApplicable": false, "rics:Total": 285000 }, { "@category": "capitalConstructionCosts", "@group": "structure", "@code": "1.03", "@subcode": "030.020", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Upper floors and beams", "@isNotApplicable": false, "rics:Total": 951000 }, { "@category": "capitalConstructionCosts", "@group": "structure", "@code": "1.03", "@subcode": "030.030", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Roof beams and slabs", "@isNotApplicable": false, "rics:Total": 1056000 }, { "@category": "capitalConstructionCosts", "@group": "structure", "@code": "1.03", "@subcode": "030.040", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Staircases", "@isNotApplicable": false, "rics:Total": 72000 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "020.010", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Non-structural external walls", "@isNotApplicable": false, "rics:Total": 1957500 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "020.050", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "External doors", "@isNotApplicable": false, "rics:Total": 108800 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "030.010", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Roof finishes", "@isNotApplicable": false, "rics:Total": 560000 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "040.010", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Non-structural internal walls and partitions", "@isNotApplicable": false, "rics:Total": 658700 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "040.060", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Internal doors", "@isNotApplicable": false, "rics:Total": 141000 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "040.070", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Internal windows", "@isNotApplicable": false, "rics:Total": 131000 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "050", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Fittings and sundries", "@isNotApplicable": false, "rics:Total": 180000 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "060.010", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Floor finishes", "@isNotApplicable": false, "rics:Total": 501000 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "060.020", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Internal wall finishes", "@isNotApplicable": false, "rics:Total": 258300 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "060.030", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Ceiling finishes", "@isNotApplicable": false, "rics:Total": 380700 }, { "@category": "capitalConstructionCosts", "@group": "architecturalWorks-NonStructuralWorks", "@code": "1.04", "@subcode": "070", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Builder's work in connection with services", "@isNotApplicable": false, "rics:Total": 181500 }, { "@category": "capitalConstructionCosts", "@group": "servicesAndEquipment", "@code": "1.05", "@subcode": "010.080", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Air handling and distribution system", "@isNotApplicable": false, "rics:Total": 2273500 }, { "@category": "capitalConstructionCosts", "@group": "servicesAndEquipment", "@code": "1.05", "@subcode": "020", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Electrical services", "@isNotApplicable": false, "rics:Total": 1553000 }, { "@category": "capitalConstructionCosts", "@group": "servicesAndEquipment", "@code": "1.05", "@subcode": "040.010", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Communications", "@isNotApplicable": false, "rics:Total": 728000 }, { "@category": "capitalConstructionCosts", "@group": "servicesAndEquipment", "@code": "1.05", "@subcode": "050", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Water supply and above ground drainage", "@isNotApplicable": false, "rics:Total": 788700 }, { "@category": "capitalConstructionCosts", "@group": "servicesAndEquipment", "@code": "1.05", "@subcode": "080", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Fire services", "@isNotApplicable": false, "rics:Total": 266700 }, { "@category": "capitalConstructionCosts", "@group": "servicesAndEquipment", "@code": "1.05", "@subcode": "100", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Movement systems", "@isNotApplicable": false, "rics:Total": 247000 }, { "@category": "capitalConstructionCosts", "@group": "servicesAndEquipment", "@code": "1.05", "@subcode": "250", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Other specialist services", "@isNotApplicable": false, "rics:Total": 267500 }, { "@category": "capitalConstructionCosts", "@group": "surfaceAndUndergroundDrainage", "@code": "1.06", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Surface and underground drainage", "@isNotApplicable": false, "rics:Total": 165000 }, { "@category": "capitalConstructionCosts", "@group": "externalAndAncillaryWorks", "@code": "1.07", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "External and ancillary works", "@isNotApplicable": false, "rics:Total": 1138000 }, { "@category": "capitalConstructionCosts", "@group": "preliminariesConstructors-SiteOverheads-GeneralRequirements", "@code": "1.08", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Preliminaries, Contractor's site overheads, general requirements", "@isNotApplicable": false, "rics:Total": 2653000 }, { "@category": "capitalConstructionCosts", "@group": "riskAllowances", "@code": "1.09", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Risk Allowances", "@isNotApplicable": false, "rics:Total": 2438000 }, { "@category": "capitalConstructionCosts", "@group": "taxesAndLevies", "@code": "1.10", "@isCivilEngineeringWorks": false, "@isExcluded": true, "@description": "Taxes and Levies", "@isNotApplicable": false, "rics:Total": 0 }, { "@category": "associatedCapitalCosts", "@group": "workAndUtilitiesOffsite", "@code": "2.01", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Work and utilities off-site", "@isNotApplicable": false, "rics:Total": 290000 }, { "@category": "associatedCapitalCosts", "@group": "postCompletionLooseFurnitureFittingsAndEquipment", "@code": "2.02", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Post-completion loose furniture, fittings and equipment", "@isNotApplicable": false, "rics:Total": 2605600 }, { "@category": "associatedCapitalCosts", "@group": "constructionRelatedConsultantsAndSupervision", "@code": "2.03", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Construction-related consultancies and supervision", "@isNotApplicable": false, "rics:Total": 1380300 }, { "@category": "associatedCapitalCosts", "@group": "riskAllowances", "@code": "2.04", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Risk Allowances", "@isNotApplicable": false, "rics:Total": 177000 }, { "@category": "siteAcquisitionAndClientsOtherCosts", "@group": "siteAcquisition", "@code": "3.01", "@isCivilEngineeringWorks": false, "@isExcluded": true, "@description": "Site acquisition", "@isNotApplicable": false, "rics:Total": 0 }, { "@category": "siteAcquisitionAndClientsOtherCosts", "@group": "administrativeFinanceLegalAndMarketingExpenses", "@code": "3.02", "@isCivilEngineeringWorks": false, "@isExcluded": false, "@description": "Administrative, finance, legal and marketing expenses", "@isNotApplicable": false, "rics:Total": 671850 } ], "rics:Works": { "@function": "commercial", "@nature": "newBuild", "@grade": "mediumQuality", "@designLifeInYears": 40, "rics:EnvironmentalGrade": [ { "@grade": "Four Star", "@status": "targeted", "@standard": "NABERS (National Australian Built Environment Rating System)" } ], "rics:DesignFeatures": { "@structure": "steel", "@externalWalls": "Tilt-up (precast) concrete panels", "@environmentalControl": "airConditioning", "@prefabricationDegree": "upTo50%" }, "rics:Complexity": { "@shapeOnPlan": "squareRectangularOrSimilar", "@design": "simple", "@methodOfWorking": "Existing buildings on site will remain operational during the construction. Staff will move to new buildings. Old buildings demolished on completion of new 40 to 50 years" }, "rics:AverageHeightToSeaLevel": { "@unitOfMeasurement": "MTR", "@location": "above", "$": 577 }, "rics:Dimensions": { "@unitOfMeasurement": "MTR", "@description": "Metres", "rics:Width": 37.640, "rics:Length": 64.85, "rics:Height": 6.20 }, "rics:StoreyInformation": [ { "@storeyCountAboveGround": 3, "@storeyCountBelowGround": 0, "rics:StoreyHeight": [ { "@unitOfMeasurement": "MTR", "@id": "0", "$": 3 } ], "rics:TypicalStoreyHeight": { "@unitOfMeasurement": "MTR", "$": 3 } } ] }, "rics:Quantities": { "rics:SiteArea": { "@unitOfMeasurement": "MTK", "$": 50000 }, "rics:CoveredAreaOnPlan": { "@unitOfMeasurement": "MTK", "$": 7550 }, "rics:InternalFloorAreaAsIpms2": { "@unitOfMeasurement": "MTK", "$": 4770 } } } ], "rics:Bridges": [ { "@description": "ICMS2 Data", "rics:Costs": [ { "@category": " Acquisition Costs (AC)", "@group": "Site acquisition", "@subgroup": "Costs and premium required to procure site", "@code": "02.1.01", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Site acquisition", "@subgroup": "Compensation to existing occupiers", "@code": "02.1.01", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Site acquisition", "@subgroup": "Demolition, removal and modification of existing properties by way of payment to existing owners instead of carrying out physical work", "@code": "02.1.01", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Site acquisition", "@subgroup": "Contributions for the preservation of heritage, culture and environment", "@code": "02.1.01", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Site acquisition", "@subgroup": "Related fees to agents, lawyers, and the like", "@code": "02.1.01", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Site acquisition", "@subgroup": "Related taxes and statutory charges", "@code": "02.1.01", "@subcode": "060.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s general office overheads", "@code": "02.1.02", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.010", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.020", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.030", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.040", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.050", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.060", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Client’s project-specific administrative expenses", "@code": "02.1.02", "@subcode": "020.070", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Interest and finance costs", "@code": "02.1.02", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Legal expenses", "@code": "02.1.02", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Accounting expenses", "@code": "02.1.02", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Sales, leasing, marketing, advertising and promotional expenses", "@code": "02.1.02", "@subcode": "060.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "Taxes and statutory charges related to sales and lease", "@code": "02.1.02", "@subcode": "070.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Acquisition Costs (AC)", "@group": "Administrative, finance, legal and marketing expenses", "@subgroup": "License and permit charges for operation and use", "@code": "02.1.02", "@subcode": "080.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Site survey and ground investigation", "@code": "02.2.01", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Environmental treatment", "@code": "02.2.01", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Sampling of hazardous or useful materials or conditions", "@code": "02.2.01", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Temporary fencing", "@code": "02.2.01", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Demolition of existing structures and support to adjacent structures", "@code": "02.2.01", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Demolition of existing structures and support to adjacent structures", "@code": "02.2.01", "@subcode": "060.000", "@description": "Allowance for traffic control", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 7236 }, "rics:Rate": 25, "rics:Total": 180900 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Demolition of existing structures and support to adjacent structures", "@code": "02.2.01", "@subcode": "060.000", "@description": "Water removal, pumps, fuel, filters, Allowance for water removal, pumps, fuel, filters", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 2, "rics:Rate": 15000, "rics:Total": 30000 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Tree transplant", "@code": "02.2.01", "@subcode": "070.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "General site formation and slope treatment", "@code": "02.2.01", "@subcode": "080.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Temporary surface drainage and dewatering", "@code": "02.2.01", "@subcode": "090.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Temporary access roads and storage areas (provided under an advance contract)", "@code": "02.2.01", "@subcode": "100.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Temporary protection, diversion and relocation of public utilities", "@code": "02.2.01", "@subcode": "110.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Demolition, site preparation and formation", "@subgroup": "Erosion control", "@code": "02.2.02", "@subcode": "120.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Embankments/cuttings", "@code": "02.2.02", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Embankments/cuttings", "@code": "02.2.02", "@subcode": "020.000", "@description": "Excavation to abutments, allowance, Bulk excavation for removals and new construction, removal from site", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 8964 }, "rics:Rate": 45, "rics:Total": 403380 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Embankments/cuttings", "@code": "02.2.02", "@subcode": "020.000", "@description": "Excavation to abutments, allowance, Shale bedrock excavation for new construction, removal from site", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 4038 }, "rics:Rate": 110, "rics:Total": 444180 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Embankments/cuttings", "@code": "02.2.02", "@subcode": "020.000", "@description": "Excavation to pier pads in river bed, Bulk excavation for removals and new construction, removal from site", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 600 }, "rics:Rate": 45, "rics:Total": 27000 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Embankments/cuttings", "@code": "02.2.02", "@subcode": "020.000", "@description": "Excavation to pier pads in river bed, Rock excavation for removals and new construction, removal from site", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 9000 }, "rics:Rate": 120, "rics:Total": 1080000 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Trenching", "@code": "02.2.02", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "050.000", "@description": "Caissons to above, 14 piers per pad, 1800mm diameter, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 688 }, "rics:Rate": 220, "rics:Total": 151360 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "050.000", "@description": "Caissons to above, 14 piers per pad, 1800mm diameter, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 688 }, "rics:Rate": 50, "rics:Total": 34400 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "050.000", "@description": "Caissons to above, 14 piers per pad, 1800mm diameter, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 56000 }, "rics:Rate": 4, "rics:Total": 224000 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "050.000", "@description": "Caissons to above, 14 piers per pad, 1800mm diameter, Steel liner", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 15900 }, "rics:Rate": 4, "rics:Total": 63600 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "050.000", "@description": "Caissons to above, 14 piers per pad, 1800mm diameter, Allowance for drilling", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 688 }, "rics:Rate": 1300, "rics:Total": 894400 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "060.000", "@description": "Backfill to abutments, allowance, Backfill with engineered fill, compacted", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 6090 }, "rics:Rate": 75, "rics:Total": 456750 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "060.000", "@description": "Backfill to abutments, allowance, Clear granular material at drains, etc.,", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 3 }, "rics:Rate": 120, "rics:Total": 360 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "060.000", "@description": "Backfill to pier pads in river bed, Backfill with rock material", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 1980 }, "rics:Rate": 75, "rics:Total": 148500 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "070.000", "@description": "Coffered dams to river bed at piers, Allowance for coffer dams", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 3200 }, "rics:Rate": 450, "rics:Total": 1440000 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wall pad footings, 1300mm thick, 6500 x 27600mm, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 467 }, "rics:Rate": 220, "rics:Total": 102740 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wall pad footings, 1300mm thick, 6500 x 27600mm, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 467 }, "rics:Rate": 50, "rics:Total": 23350 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wall pad footings, 1300mm thick, 6500 x 27600mm, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 42500 }, "rics:Rate": 4, "rics:Total": 170000 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wall pad footings, 1300mm thick, 6500 x 27600mm, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 0 }, "rics:Rate": 12, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wall pad footings, 1300mm thick, 6500 x 27600mm, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 178 }, "rics:Rate": 220, "rics:Total": 39160 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wall pad footings, 1300mm thick, 6500 x 27600mm, Screed", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 359 }, "rics:Rate": 10, "rics:Total": 3590 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wing walls, 475mm, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 29 }, "rics:Rate": 220, "rics:Total": 6380 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wing walls, 475mm, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 29 }, "rics:Rate": 50, "rics:Total": 1450 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wing walls, 475mm, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 2330 }, "rics:Rate": 4, "rics:Total": 9320 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wing walls, 475mm, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 0 }, "rics:Rate": 12, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "080.000", "@description": "Abutment wing walls, 475mm, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 133 }, "rics:Rate": 220, "rics:Total": 29260 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Pier pad footings, 2400mm thick, 33140 x 9000mm wide, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 1432 }, "rics:Rate": 220, "rics:Total": 315040 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Pier pad footings, 2400mm thick, 33140 x 9000mm wide, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 1432 }, "rics:Rate": 50, "rics:Total": 71600 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Pier pad footings, 2400mm thick, 33140 x 9000mm wide, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 38000 }, "rics:Rate": 4, "rics:Total": 152000 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Pier pad footings, 2400mm thick, 33140 x 9000mm wide, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 0 }, "rics:Rate": 12, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Pier pad footings, 2400mm thick, 33140 x 9000mm wide, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 404 }, "rics:Rate": 220, "rics:Total": 88880 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Pier pad footings, 2400mm thick, 33140 x 9000mm wide, Screed", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 596 }, "rics:Rate": 10, "rics:Total": 5960 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Abutment walls, bridge support, 360m2, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 242 }, "rics:Rate": 220, "rics:Total": 53240 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Abutment walls, bridge support, 360m2, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 242 }, "rics:Rate": 50, "rics:Total": 12100 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Abutment walls, bridge support, 360m2, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 0 }, "rics:Rate": 4, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Abutment walls, bridge support, 360m2, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 3600 }, "rics:Rate": 12, "rics:Total": 43200 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Drilling/boring", "@code": "02.2.02", "@subcode": "090.000", "@description": "Abutment walls, bridge support, 360m2, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 751 }, "rics:Rate": 220, "rics:Total": 165220 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "100.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Extra over to above for mass concrete working slab, 100mm thick, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 36 }, "rics:Rate": 190, "rics:Total": 6840 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Extra over to above for mass concrete working slab, 100mm thick, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 36 }, "rics:Rate": 40, "rics:Total": 1440 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Extra over to above for mass concrete working slab, 100mm thick, Rebar, not required", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Extra over to above for mass concrete working slab, 100mm thick, Screed", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 359 }, "rics:Rate": 10, "rics:Total": 3590 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Allowance for light pole base, as per drawing sheet 611, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 5 }, "rics:Rate": 220, "rics:Total": 1100 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Allowance for light pole base, as per drawing sheet 611, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 5 }, "rics:Rate": 50, "rics:Total": 250 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Allowance for light pole base, as per drawing sheet 611, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 1000 }, "rics:Rate": 12, "rics:Total": 12000 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Allowance for light pole base, as per drawing sheet 611, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 23 }, "rics:Rate": 220, "rics:Total": 5060 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Allowance for light pole base, as per drawing sheet 611, Screed", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 5 }, "rics:Rate": 25, "rics:Total": 125 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Sub-base to pavements and rail track structures", "@code": "02.2.02", "@subcode": "110.000", "@description": "Allowance for light pole base, as per drawing sheet 611, Allowance for cast-in lighting mount", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 5, "rics:Rate": 300, "rics:Total": 1500 }, { "@category": " Construction Costs", "@group": "Substructure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.02", "@subcode": "120.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Piers, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 1393 }, "rics:Rate": 220, "rics:Total": 306460 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Piers, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 1393 }, "rics:Rate": 50, "rics:Total": 69650 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Piers, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 101600 }, "rics:Rate": 4, "rics:Total": 406400 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Piers, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 0 }, "rics:Rate": 12, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Piers, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 1200 }, "rics:Rate": 220, "rics:Total": 264000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Abutment walls, pier section, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 290 }, "rics:Rate": 220, "rics:Total": 63800 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Abutment walls, pier section, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 290 }, "rics:Rate": 50, "rics:Total": 14500 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Abutment walls, pier section, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 8400 }, "rics:Rate": 4, "rics:Total": 33600 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Abutment walls, pier section, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 11800 }, "rics:Rate": 12, "rics:Total": 141600 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Abutment walls, pier section, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 264 }, "rics:Rate": 220, "rics:Total": 58080 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Beds and surrounds to underground pipes", "@code": "02.2.03", "@subcode": "010.000", "@description": "Abutment walls, pier section, Screed", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 73 }, "rics:Rate": 10, "rics:Total": 730 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "020.000", "@description": "Abutment walls, pier section", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "030.000", "@description": "250mm concrete deck, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 115 }, "rics:Rate": 220, "rics:Total": 25300 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "030.000", "@description": "250mm concrete deck, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 115 }, "rics:Rate": 50, "rics:Total": 5750 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "030.000", "@description": "250mm concrete deck, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 7060 }, "rics:Rate": 4, "rics:Total": 28240 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "030.000", "@description": "250mm concrete deck, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 424 }, "rics:Rate": 12, "rics:Total": 5088 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "030.000", "@description": "250mm concrete deck, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 10 }, "rics:Rate": 220, "rics:Total": 2200 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "030.000", "@description": "250mm concrete deck, Screed/cure", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 460 }, "rics:Rate": 15, "rics:Total": 6900 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "040.000", "@description": "Bearings, 1800 x 1800mm, Fixed", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 2, "rics:Rate": 3500, "rics:Total": 7000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "040.000", "@description": "Bearings, 1800 x 1800mm, Uni-directional", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 8, "rics:Rate": 3800, "rics:Total": 30400 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "040.000", "@description": "Bearings, 1800 x 1800mm, Multi-directional", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 6, "rics:Rate": 4000, "rics:Total": 24000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "040.000", "@description": "Bearings, 1800 x 1800mm, Allowance for materials for destructive testing", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 2000, "rics:Total": 2000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Suspension system", "@code": "02.2.03", "@subcode": "040.000", "@description": "5mm elastomer at approach slab", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 240 }, "rics:Rate": 55, "rics:Total": 13200 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tunnel lining", "@code": "02.2.03", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "060.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Overpass finishes, 90mm asphalt topping", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 610 }, "rics:Rate": 200, "rics:Total": 122000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Overpass finishes, Waterproof membrane", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 6777 }, "rics:Rate": 45, "rics:Total": 304965 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Overpass finishes, Form and gill grooves", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 1017 }, "rics:Rate": 7, "rics:Total": 7119 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Overpass finishes, Allowance for demarkation, lines, symbols, etc.,", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 6777 }, "rics:Rate": 6, "rics:Total": 40662 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Approach slab finishes, 90mm asphalt topping", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 41 }, "rics:Rate": 200, "rics:Total": 8200 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Approach slab finishes, Waterproof membrane", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 459 }, "rics:Rate": 45, "rics:Total": 20655 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Approach slab finishes, Form and gill grooves", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 69 }, "rics:Rate": 7, "rics:Total": 483 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Approach slab finishes, Allowance for demarkation, lines, symbols, etc.,", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 459 }, "rics:Rate": 6, "rics:Total": 2754 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Road/track base", "@code": "02.2.03", "@subcode": "070.000", "@description": "Approach slab finishes, Allowance for saw cutting and joint compound", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 54 }, "rics:Rate": 35, "rics:Total": 1890 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "080.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "090.000", "@description": "Expansion joints", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 54 }, "rics:Rate": 1460, "rics:Total": 78840 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 3400 }, "rics:Rate": 220, "rics:Total": 748000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 3400 }, "rics:Rate": 50, "rics:Total": 170000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 532500 }, "rics:Rate": 4, "rics:Total": 2130000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 317500 }, "rics:Rate": 12, "rics:Total": 3810000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 7392 }, "rics:Rate": 220, "rics:Total": 1626240 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Screeded/cure", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 3628 }, "rics:Rate": 15, "rics:Total": 54420 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Falsework framing support", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 3630 }, "rics:Rate": 100, "rics:Total": 363000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over falsework, Allowance for post tensioning", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 136 }, "rics:Rate": 700, "rics:Total": 95200 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 3750 }, "rics:Rate": 220, "rics:Total": 825000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 3750 }, "rics:Rate": 50, "rics:Total": 187500 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 662500 }, "rics:Rate": 4, "rics:Total": 2650000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 275000 }, "rics:Rate": 12, "rics:Total": 3300000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 6640 }, "rics:Rate": 220, "rics:Total": 1460800 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Screeded/cure", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 3148 }, "rics:Rate": 15, "rics:Total": 47220 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Falsework framing support", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 3148 }, "rics:Rate": 100, "rics:Total": 314800 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Box girder diaphragm sections over form travellers, Allowance for post tensioning", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 118 }, "rics:Rate": 700, "rics:Total": 82600 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Service roads and approaches", "@code": "02.2.03", "@subcode": "100.000", "@description": "Allowance for sealant to interior surfaces, Interior surface area, confined space", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 9384 }, "rics:Rate": 65, "rics:Total": 609960 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "110.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "120.000", "@description": "Clevis pipe hanger with 25mm GI threaded rod, 1m high", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 150, "rics:Rate": 450, "rics:Total": 67500 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "130.000", "@description": "150mm dia. perforated drain at abutments", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 120 }, "rics:Rate": 50, "rics:Total": 6000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "130.000", "@description": "Provide new deck drain, 1000x230mm (catch basin detail OPSD 3340.150)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 8, "rics:Rate": 1200, "rics:Total": 9600 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "130.000", "@description": "200mm ASTM-A53 GI down pipe", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 15 }, "rics:Rate": 300, "rics:Total": 4500 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "130.000", "@description": "300mm dia. PVC collection pipe hung under bridge deck", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 450 }, "rics:Rate": 340, "rics:Total": 153000 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "130.000", "@description": "300mm dia. cleanout", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 2, "rics:Rate": 800, "rics:Total": 1600 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Tanks, rigs, storage containers and the like", "@code": "02.2.03", "@subcode": "130.000", "@description": "300mm dia. pipe expansion joint", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 2, "rics:Rate": 1200, "rics:Total": 2400 }, { "@category": " Construction Costs", "@group": "Structure", "@subgroup": "Valves and fittings", "@code": "02.2.03", "@subcode": "140.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Non-structural removal and alterations", "@code": "02.2.04", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Non-structural construction", "@code": "02.2.04", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Running surface", "@code": "02.2.04", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Signage, markings and the like", "@code": "02.2.04", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Gantries and the like", "@code": "02.2.04", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "060.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Concrete supply", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 244 }, "rics:Rate": 220, "rics:Total": 53680 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Concrete placement", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTQ", "$": 244 }, "rics:Rate": 50, "rics:Total": 12200 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Rebar", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 0 }, "rics:Rate": 4, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Rebar, stainless steel", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 19727 }, "rics:Rate": 12, "rics:Total": 236724 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Formwork", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 1216 }, "rics:Rate": 150, "rics:Total": 182400 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Screed", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 543 }, "rics:Rate": 25, "rics:Total": 13575 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Control joints", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTR", "$": 543 }, "rics:Rate": 10, "rics:Total": 5430 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Barrier wall, Expansion joints", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 4, "rics:Rate": 1200, "rics:Total": 4800 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Sound barrier wall, mounted on barrier wall, Paraglass", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 1016 }, "rics:Rate": 2000, "rics:Total": 2032000 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Sound barrier wall, mounted on barrier wall, Non-Paraglass", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 84 }, "rics:Rate": 2000, "rics:Total": 168000 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Sound barrier wall, mounted on barrier wall, Galvanized steel framing system", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 34940 }, "rics:Rate": 15, "rics:Total": 524100 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Sound barrier wall, mounted on barrier wall, Clips and anchors", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "KGM", "$": 1900 }, "rics:Rate": 25, "rics:Total": 47500 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Sound barrier wall, mounted on barrier wall, Anchors", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 416, "rics:Rate": 80, "rics:Total": 33280 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Safety facilities", "@code": "02.2.04", "@subcode": "070.000", "@description": "Sound barrier wall, mounted on barrier wall, Installation", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": { "@unitOfMeasurement": "MTK", "$": 1100 }, "rics:Rate": 575, "rics:Total": 632500 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Special equipment and fittings", "@code": "02.2.04", "@subcode": "080.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Interior landscaping", "@code": "02.2.04", "@subcode": "090.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Non-structural works", "@subgroup": "Builders’ work in connection with services", "@code": "02.2.04", "@subcode": "100.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Mechanical systems", "@code": "02.2.05", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Mechanical systems", "@code": "02.2.05", "@subcode": "020.000", "@description": "Electrical work, Pick up from storage and re-install ex. pole mounted heritage light fixture", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 5, "rics:Rate": 2000, "rics:Total": 10000 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Mechanical systems", "@code": "02.2.05", "@subcode": "020.000", "@description": "Electrical work, Concrete base for above", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 5, "rics:Rate": 2000, "rics:Total": 10000 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Mechanical systems", "@code": "02.2.05", "@subcode": "020.000", "@description": "Electrical work, Embedded 1x50mm + 1x75mm RPVC duct in barrier walls, 538m", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 50000, "rics:Total": 50000 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Mechanical systems", "@code": "02.2.05", "@subcode": "020.000", "@description": "Electrical work, Extend embedded 1x50mm + 1x75mm RPVC ducts up to next handhole", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 15000, "rics:Total": 15000 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Mechanical systems", "@code": "02.2.05", "@subcode": "020.000", "@description": "Electrical work, Electrical misc. - drawings, manuals, permits, fees and inspection, mobilization etc.", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 15000, "rics:Total": 15000 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Illuminations", "@code": "02.2.05", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Low-voltage power supply", "@code": "02.2.05", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "High-voltage power supply", "@code": "02.2.05", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Cables/cable trays", "@code": "02.2.05", "@subcode": "060.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Other electrical services", "@code": "02.2.05", "@subcode": "070.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Control systems and instrumentation", "@code": "02.2.05", "@subcode": "080.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Pipe racks/supports", "@code": "02.2.05", "@subcode": "090.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Water supply and drainage above ground or inside underground construction", "@code": "02.2.05", "@subcode": "100.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Fire services", "@code": "02.2.05", "@subcode": "110.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Services and equipment", "@subgroup": "Movement systems: lifts/ elevators/ conveyors", "@code": "02.2.05", "@subcode": "120.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Surface and underground drainage", "@subgroup": "Surface water drainage", "@code": "02.2.06", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Surface and underground drainage", "@subgroup": "Storm water drainage", "@code": "02.2.06", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Surface and underground drainage", "@subgroup": "Foul and waste water drainage", "@code": "02.2.06", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Surface and underground drainage", "@subgroup": "Pumping systems", "@code": "02.2.06", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Surface and underground drainage", "@subgroup": "Drainage connections", "@code": "02.2.06", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "External and ancillary works", "@subgroup": "Site enclosures and divisions", "@code": "02.2.07", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "External and ancillary works", "@subgroup": "Ancillary structures", "@code": "02.2.07", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "External and ancillary works", "@subgroup": "Roads and paving (not amounting to a Sub- Project)", "@code": "02.2.07", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "External and ancillary works", "@subgroup": "Roads and paving (not amounting to a Sub- Project)", "@code": "02.2.07", "@subcode": "040.000", "@description": "Allowance for hydronic seeding and shrub planting", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 4000, "rics:Total": 4000 }, { "@category": " Construction Costs", "@group": "External and ancillary works", "@subgroup": "Fittings and equipment", "@code": "02.2.07", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Fittings and equipment", "@code": "02.2.08", "@subcode": "000.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 6765200, "rics:Total": 6765200 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Fittings and equipment", "@code": "02.2.08", "@subcode": "010.000", "@description": "Administrative Requirements (6%)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 1906700, "rics:Total": 1906700 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Fittings and equipment", "@code": "02.2.08", "@subcode": "020.000", "@description": "Allowance for clearing shrubs and planting adjacement to abutements", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 4, "rics:Rate": 2000, "rics:Total": 8000 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Temporary site fencing and securities", "@code": "02.2.08", "@subcode": "030.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Commonly shared construction plant", "@code": "02.2.08", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Commonly shared scaffolding", "@code": "02.2.08", "@subcode": "050.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Commonly shared scaffolding", "@code": "02.2.08", "@subcode": "060.000", "@description": "Temporary Facilities and Controls (4%)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 1482100, "rics:Total": 1482100 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Commonly shared scaffolding", "@code": "02.2.08", "@subcode": "060.000", "@description": "Procedural Requirements (10%)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 3368400, "rics:Total": 3368400 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Technology and communication: telephone, broadband, hardware, software", "@code": "02.2.08", "@subcode": "070.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Constructor’s submissions, reports and as-built documentation", "@code": "02.2.08", "@subcode": "080.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Quality monitoring, recording and inspections", "@code": "02.2.08", "@subcode": "090.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Safety, health and environmental management", "@code": "02.2.08", "@subcode": "100.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Insurances, bonds, guarantees and warranties", "@code": "02.2.08", "@subcode": "110.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Constructor’s statutory fees and charges", "@code": "02.2.08", "@subcode": "120.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Preliminaries | Constructors’ site overheads | general requirements", "@subgroup": "Testing and commissioning", "@code": "02.2.08", "@subcode": "130.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Risk Allowances", "@subgroup": "Testing and commissioning", "@code": "02.2.09", "@subcode": "010.000", "@description": "Design and Pricing Contingency (2%)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 801500, "rics:Total": 801500 }, { "@category": " Construction Costs", "@group": "Risk Allowances", "@subgroup": "Testing and commissioning", "@code": "02.2.09", "@subcode": "020.000", "@description": "Construction Contingency (10%)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 4312600, "rics:Total": 4312600 }, { "@category": " Construction Costs", "@group": "Risk Allowances", "@subgroup": "Testing and commissioning", "@code": "02.2.09", "@subcode": "030.000", "@description": "Escalation Contingency (5.5%)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 2248300, "rics:Total": 2248300 }, { "@category": " Construction Costs", "@group": "Risk Allowances", "@subgroup": "Testing and commissioning", "@code": "02.2.09", "@subcode": "030.000", "@description": "Bidding Requirements Conditions (4%)", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 1, "rics:Rate": 1541400, "rics:Total": 1541400 }, { "@category": " Construction Costs", "@group": "Risk Allowances", "@subgroup": "Exchange rate fluctuation adjustments", "@code": "02.2.09", "@subcode": "040.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Taxes and Levies", "@subgroup": "Exchange rate fluctuation adjustments", "@code": "02.2.10", "@subcode": "000.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Taxes and Levies", "@subgroup": "Paid by the Constructors", "@code": "02.2.10", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Taxes and Levies", "@subgroup": "Paid by the Client in relation to the construction contract payments", "@code": "02.2.10", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Paid by the Client in relation to the construction contract payments", "@code": "02.2.11", "@subcode": "000.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Connections to, diversion of and capacity enhancement of public utility mains or sources off-site up to mains connections on-site", "@code": "02.2.11", "@subcode": "010.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Connections to, diversion of and capacity enhancement of public utility mains or sources off-site up to mains connections on-site", "@code": "02.2.11", "@subcode": "010.010", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Connections to, diversion of and capacity enhancement of public utility mains or sources off-site up to mains connections on-site", "@code": "02.2.11", "@subcode": "010.020", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Connections to, diversion of and capacity enhancement of public utility mains or sources off-site up to mains connections on-site", "@code": "02.2.11", "@subcode": "010.030", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Connections to, diversion of and capacity enhancement of public utility mains or sources off-site up to mains connections on-site", "@code": "02.2.11", "@subcode": "010.040", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Connections to, diversion of and capacity enhancement of public utility mains or sources off-site up to mains connections on-site", "@code": "02.2.11", "@subcode": "010.050", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Connections to, diversion of and capacity enhancement of public utility mains or sources off-site up to mains connections on-site", "@code": "02.2.11", "@subcode": "010.060", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Work and utilities off-site (including related risk allowances, taxes and levies)", "@subgroup": "Public access roads and footpaths", "@code": "02.2.11", "@subcode": "020.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 }, { "@category": " Construction Costs", "@group": "Post-completion loose furniture, fittings and equipment (including related risk allowances, taxes and levies)", "@subgroup": "Public access roads and footpaths", "@code": "02.2.12", "@subcode": "000.000", "@isCivilEngineeringWorks": true, "@isExcluded": false, "@isNotApplicable": false, "rics:Quantity": 0, "rics:Rate": 0, "rics:Total": 0 } ] } ] } ] } }