# Workflow Progress When you run a workflow, the controller will report on its progress. We define progress as two numbers, `N/M` such that `0 <= N <= M and 0 <= M`. * `N` is the number of completed tasks. * `M` is the total number of tasks. E.g. `0/0`, `0/1` or `50/100`. Unlike [estimated duration](estimated-duration.md), progress is deterministic. I.e. it will be the same for each workflow, regardless of any problems. Progress for each node is calculated as follows: 1. For a pod node either `1/1` if completed or `0/1` otherwise. 2. For non-leaf nodes, the sum of its children. For a whole workflow's, progress is the sum of all its leaf nodes. !!! Warning `M` will increase during workflow run each time a node is added to the graph. ## Self reporting progress Pods in a workflow can report their own progress during their runtime. This self reported progress overrides the auto-generated progress. Reporting progress works as follows: * create and write the progress to a file indicated by the env variable `ARGO_PROGRESS_FILE` * format of the progress must be `N/M` The executor will read this file every 3s and if there was an update, patch the matching `WorkflowTaskResults` resource with the value `N/M`. The controller picks this up and writes the progress to the appropriate Status properties every 1m. These values can be fine tuned with the `ARGO_PROGRESS_PATCH_TICK_DURATION` and `ARGO_PROGRESS_FILE_TICK_DURATION` [environment variables](environment-variables.md). Initially the progress of a workflows' pod is always `0/1`. If you want to influence this, make sure to set an initial progress annotation on the pod: ```yaml apiVersion: argoproj.io/v1alpha1 kind: Workflow metadata: generateName: progress- spec: entrypoint: main templates: - name: main dag: tasks: - name: progress template: progress - name: progress container: image: alpine:3.23 command: [ "/bin/sh", "-c" ] args: - | for i in `seq 1 10`; do sleep 10; echo "$(($i*10))"'/100' > $ARGO_PROGRESS_FILE; done ``` You must set your [Workflow RBAC](workflow-rbac.md) properly for the executor to be able to update progress.