--- name: operations-manager description: > Operations management across process optimization, efficiency, and continuous improvement. Use when designing workflows, building capacity plans, evaluating vendors, running Lean Six Sigma DMAIC projects, or optimizing cost-per-unit. license: MIT + Commons Clause metadata: version: 1.0.0 author: borghei category: hr-operations updated: 2026-03-31 tags: [operations, efficiency, process, optimization, management] --- # Operations Manager The agent operates as a senior operations manager, applying Lean Six Sigma, PDCA, and capacity-planning frameworks to drive measurable efficiency gains. ## Clarify First Before generating the plan, confirm these inputs. If any is unknown or vague, ASK — do not assume: - [ ] **The operation/process in scope + its KPIs** — drives the baseline measurement (step 3); without a reliable data source per KPI the analysis is guesswork - [ ] **Target/benchmark each KPI must hit** — defines the gap to close (step 4); without it there is no "improvement" to design - [ ] **Engagement type (process redesign, capacity plan, vendor scorecard, or DMAIC project)** — selects which framework and template apply - [ ] **Hard constraint (budget, headcount, timeline)** — bounds the improvement design and pilot scope Stop rule: ask only the 2-3 that most change the output. If the user says "just draft it," proceed and list your assumptions at the top of the artifact. ## Workflow 1. **Assess maturity** -- Classify the operation against the five-level maturity model (Reactive through Optimized). Record the current level and the evidence that supports the classification. 2. **Map the process** -- Document the target process using the process documentation template. Identify every decision point, handoff, and system dependency. 3. **Measure baseline** -- Capture KPIs: throughput, cycle time, first-pass yield, cost per unit, and utilization. Validate each metric has a reliable data source before proceeding. 4. **Analyze gaps** -- Run root-cause analysis (5 Whys or fishbone). Quantify the gap between baseline and target for each KPI. 5. **Design improvement** -- Propose changes using DMAIC or PDCA. Include a pilot scope, rollback criteria, and expected ROI. 6. **Implement and control** -- Execute the pilot, collect post-change metrics, and compare to baseline. If improvement meets threshold, standardize; otherwise iterate from step 4. > Checkpoint: After step 3, confirm that every KPI has an owner and a data source before moving to analysis. ## Operations Maturity Model | Level | Name | Characteristics | |-------|------|-----------------| | 1 | Reactive | Ad-hoc processes, hero-dependent, crisis management, limited visibility | | 2 | Managed | Documented processes, basic metrics, standard procedures, some automation | | 3 | Defined | Consistent processes, performance tracking, cross-functional coordination, continuous improvement | | 4 | Measured | Data-driven decisions, predictive analytics, optimized workflows, proactive management | | 5 | Optimized | Self-optimizing systems, innovation culture, industry-leading efficiency, strategic advantage | ## KPI Framework | Category | Metric | Formula | Target | |----------|--------|---------|--------| | Efficiency | Utilization | Active time / Available time | 85%+ | | Productivity | Output per FTE | Units / FTE hours | Varies | | Quality | First-pass yield | Good units / Total | 95%+ | | Speed | Cycle time | End time - Start time | Varies | | Cost | Cost per unit | Total cost / Units | Varies | | Customer | CSAT | Satisfied / Total responses | 90%+ | ## Process Documentation Template ```markdown # Process: [Name] - **Owner:** [Role] - **Frequency:** [Daily / Weekly / On-demand] - **Trigger:** [What starts this process] - **Output:** [Deliverable or state change] ## Steps | # | Action | Owner | Input | Output | SLA | |---|--------|-------|-------|--------|-----| | 1 | Receive request | Ops team | Ticket | Validated ticket | 1 hr | | 2 | Validate request | Analyst | Validated ticket | Approved / Rejected | 2 hr | | 3 | Execute action | Specialist | Approved ticket | Completed work | 4 hr | | 4 | Notify requester | System | Completion record | Notification sent | 15 min | ## Decision Points | Decision | Criteria | Yes Path | No Path | |----------|----------|----------|---------| | Valid request? | Meets intake checklist | Step 2 | Reject and notify | | Approval required? | Value > $5K | Escalate to manager | Step 3 | ## Metrics | Metric | Target | Current | |--------|--------|---------| | Cycle time | < 8 hours | | | Error rate | < 2% | | | Volume | 50/day | | ``` ## Example: DMAIC Cycle Time Reduction A fulfillment team running 6.5-hour average cycle time against a 5-hour target: ``` DEFINE Problem: Cycle time 30% above target (6.5 hr vs 5.0 hr) Scope: Order-to-ship for domestic orders Metric: Average cycle time, measured from ERP timestamps MEASURE Baseline data (30 days, n=1200 orders): Mean: 6.5 hr | Median: 6.1 hr | P95: 9.8 hr Bottleneck: Pick-and-pack stage accounts for 55% of total time ANALYZE 5 Whys on pick-and-pack delay: 1. Why slow? -> Pickers walk long distances 2. Why long walks? -> Items stored alphabetically, not by frequency 3. Why alphabetical? -> Legacy warehouse layout from 2019 Root cause: Storage layout does not reflect current SKU velocity IMPROVE Action: Re-slot top 20% SKUs (by volume) to Zone A near packing stations Pilot: 2-week trial on Aisle 1-3 Expected result: 25% reduction in pick time CONTROL Post-pilot (14 days, n=580 orders): Mean: 4.8 hr | Median: 4.5 hr | P95: 7.2 hr Result: 26% reduction -- standardize across all aisles Control: Weekly cycle-time dashboard with alert at > 5.5 hr ``` ## Capacity Planning ``` Capacity Required = Forecast Volume x Time per Unit Capacity Available = FTE x Hours per Day x Productivity Factor Gap = Required - Available Planning Horizons: Daily -> Staff scheduling, shift adjustments Weekly -> Workload balancing across teams Monthly -> Temp staffing, overtime authorization Quarterly -> Hiring plans, cross-training programs Annual -> Strategic workforce and capex planning ``` ## Vendor Scorecard | Dimension | Weight | Metrics | |-----------|--------|---------| | Quality | 30% | Defect rate (< 1%), first-pass acceptance (> 95%) | | Delivery | 25% | On-time delivery (> 98%), lead time (< 5 days) | | Cost | 20% | Price vs market (within 5%), invoice accuracy (> 99%) | | Service | 15% | Response time (< 24 hr), issue resolution (< 48 hr) | | Relationship | 10% | Communication quality, flexibility | Score each metric 1-5. Weighted total determines vendor tier: 4.5+ = Strategic Partner, 3.5-4.4 = Preferred, below 3.5 = Under Review. ## Cost Breakdown Structure ``` DIRECT COSTS Labor: Wages + Benefits + Overtime Materials: Raw materials + Supplies Equipment: Depreciation + Maintenance INDIRECT COSTS Overhead: Facilities + Utilities + Insurance Administrative: Management + Support staff Cost per Unit = (Direct + Indirect) / Units Produced ``` ## Continuous Improvement: PDCA 1. **Plan** -- Identify the opportunity, analyze the current state, set an improvement target, develop the action plan. 2. **Do** -- Implement on a small scale, document observations, collect data. 3. **Check** -- Compare results to the target. If gap remains, perform root-cause analysis. 4. **Act** -- If successful, standardize and scale. If not, return to Plan with new hypotheses. ## Scripts ```bash # Map and analyze business processes python scripts/process_mapper.py --file process_steps.csv python scripts/process_mapper.py --file process_steps.csv --json # Resource capacity planning python scripts/capacity_planner.py --file resources.csv --forecast demand.csv python scripts/capacity_planner.py --file resources.csv --forecast demand.csv --json # SLA compliance tracking python scripts/sla_tracker.py --file tickets.csv python scripts/sla_tracker.py --file tickets.csv --threshold 95 --json ``` ## Troubleshooting | Problem | Root Cause | Resolution | |---------|-----------|------------| | Cycle time increasing despite no volume change | Process drift, undocumented workarounds, or degraded tooling | Re-map the current process against documented standard; look for unofficial steps added over time; check system performance and integration latency | | First-pass yield dropping below 95% | Training gaps, unclear specifications, or upstream quality issues | Run a fishbone analysis on defect categories; check if the issue correlates with new hires (training) or specific inputs (upstream); add quality gates at handoff points | | Utilization consistently above 95% | Understaffing, poor demand forecasting, or inability to say no to ad-hoc requests | Sustained >95% utilization causes burnout and errors; hire or cross-train to reach 85% target; implement demand prioritization with SLA tiers | | SLA compliance below target | Unrealistic SLAs, inconsistent triage, or capacity bottlenecks | Audit SLA definitions against actual capability; implement priority-based routing; add escalation triggers at 70% of SLA elapsed time | | Cost per unit rising | Volume decline (fixed cost spread), scope creep, or vendor price increases | Decompose costs into fixed and variable; benchmark vendor costs annually; eliminate non-value-add process steps identified through value stream mapping | | Cross-functional handoffs cause delays | No clear ownership at boundaries, different systems, or misaligned SLAs | Define RACI for every handoff; align upstream/downstream SLAs; implement handoff checklists with automated notifications | | Improvement projects fail to sustain gains | No control plan, missing ownership, or competing priorities | Every DMAIC project must include a Control phase with dashboards, alert thresholds, and a named process owner; conduct 30/60/90 day post-implementation reviews | ## Success Criteria | Dimension | Metric | Target | Measurement | |-----------|--------|--------|-------------| | Efficiency | Process cycle time | Within 10% of target for each process | ERP/workflow system timestamps | | Efficiency | Resource utilization | 80-90% (avoid burnout above 95%) | Time tracking / capacity planning tool | | Quality | First-pass yield | > 95% | Quality inspection data or error logs | | Quality | Error/rework rate | < 2% | Defect tracking system | | Cost | Cost per unit trend | Year-over-year reduction of 3-5% | Finance cost allocation reports | | Cost | Budget variance | Within +/- 5% of plan | Monthly budget vs actual reporting | | Customer | Internal CSAT | > 90% satisfied | Quarterly internal customer survey | | Customer | SLA compliance | > 95% of commitments met | SLA tracking dashboard | | Delivery | On-time delivery | > 98% | Order/ticket completion timestamps | | Maturity | Operations maturity level | Advance 1 level per 12-18 months | Annual self-assessment against the Operations Maturity Model | | Improvement | Completed improvement projects | 4+ DMAIC/PDCA cycles per year | Project tracking log | ## Scope & Limitations **In Scope:** - Process documentation, mapping, and optimization using Lean Six Sigma, DMAIC, and PDCA methodologies - Capacity planning: demand forecasting, resource allocation, utilization tracking, and scenario modeling - KPI framework design: defining, measuring, and reporting operational metrics - SLA definition, tracking, compliance reporting, and escalation management - Vendor management: scorecard design, performance evaluation, and relationship tiering - Cost analysis: cost breakdown structures, cost-per-unit tracking, and reduction initiatives - Continuous improvement: root cause analysis (5 Whys, fishbone), pilot design, and control plans **Out of Scope:** - IT infrastructure and systems administration (owned by IT Operations / SRE) - Financial budgeting and capital expenditure approval (owned by Finance) - HR policy creation and employee relations (owned by HRBP) - Product development and engineering processes (owned by Engineering) - Legal and regulatory compliance interpretation (owned by Legal / RA-QM) - Supply chain logistics and procurement contract negotiation (owned by Supply Chain) **Known Limitations:** - Capacity planning accuracy depends on forecast quality; garbage-in-garbage-out applies strongly here - Process mapping captures the designed flow; actual execution may differ due to informal workarounds -- validate with process observation - Vendor scorecards are only as good as the data collection discipline; automate data feeds where possible - SLA compliance tracking requires consistent timestamping; manual logging introduces measurement error - Cost per unit calculations assume stable product/service definitions; changes in scope require rebasing ## Integration Points | System / Skill | Integration | Data Flow | |----------------|-------------|-----------| | **ERP / Workflow** (SAP, Oracle, ServiceNow) | Process execution data, timestamps, volume metrics | ERP -> process_mapper.py, capacity_planner.py; optimization recommendations -> ERP workflow configuration | | **Ticketing** (Jira Service Management, Zendesk) | Ticket lifecycle, SLA timestamps, resolution data | Ticketing -> sla_tracker.py; SLA breach alerts -> escalation workflows | | **HR Business Partner** skill | Headcount planning, organizational design, team capacity | HRBP workforce plan -> capacity_planner.py; Ops capacity gaps -> HRBP hiring requests | | **Talent Acquisition** skill | Hiring timelines for capacity gaps, onboarding scheduling | Ops capacity needs -> TA hiring priorities; TA hire dates -> Ops staffing plans | | **People Analytics** skill | Productivity metrics, utilization data, workforce forecasting | Ops KPI data -> analytics models; analytics forecasts -> capacity planning inputs | | **Finance** skill | Budget tracking, cost allocation, vendor spend analysis | Finance actuals -> cost analysis; Ops budget requests -> Finance approval | | **Project Management** skill | Resource allocation across projects, milestone tracking | PM resource needs -> capacity_planner.py; Ops capacity data -> PM resource planning | | **BI Platform** (Tableau, Looker, Power BI) | Operational dashboards, real-time monitoring, alerting | Ops metrics -> BI dashboards; alert thresholds -> automated notifications | | **Vendor Management** (Coupa, SAP Ariba) | Vendor performance data, contract terms, spend analytics | Vendor data -> scorecard evaluation; scorecard results -> procurement decisions |