--- name: chi-workflow description: Use when planning an ACM CHI submission cycle end to end — the single September deadline, two-round review with a five-week revise-and-resubmit window, December decisions, the TAPS and publication-ready chain, and the May conference — with owners and risk buffers for each stage. --- # CHI Workflow CHI is a one-shot annual venue with a two-round review inside the cycle. The dates below are the CHI 2027 calendar as posted on `chi2027.acm.org` and read on 2026-07-08 via search renderings (the site refuses direct automated fetches); treat them as this cycle's plan and reverify on the live page at each stage. ## The CHI 2027 calendar | Date | Stage | Who must act | |---|---|---| | 2026-07-30 | PCS submission site opens | Submitting author sets up the record early | | 2026-09-10 (Thu) | **Full papers due — including videos and supplementary** | Everyone; no separate abstract deadline was posted | | ~late Oct / early Nov 2026 (待核实) | Round-1 outcome: revise-and-resubmit invitation or reject | 1AC/2AC verdict arrives; clear your calendar if invited | | 2026-12-03 | Revised paper + author response due (≈5 weeks after round-1) | Whole author team, on a fixed clock | | 2026-12-17 | Final notification after round 2 / PC meeting | — | | 2027-01-14 | Camera-ready source due in ACM TAPS | Paper lead + whoever owns LaTeX/Word source | | 2027-02-18 | Publication-ready deadline on PCS (final materials, supplemental, optional video preview) | Paper lead | | 2027-03-04 | Registration deadline + video presentation deadline | Presenting author + grant admin | | 2027-05-10 – 05-14 | CHI 2027, Pittsburgh, Pennsylvania, USA | Presenter | Two structural facts drive all planning: **everything is due on September 10** — CHI gives no later supplement or video slot — and **the December 3 revision window is only five weeks long**, landing across November holidays for much of the community. ## Working backwards from September 10 - **T−16 weeks (mid-May):** study data collection finished. A CHI paper whose study is still running in July will submit an under-analyzed paper. - **T−10 weeks:** analysis locked; contribution type and subcommittee choices drafted (`chi-topic-selection`); skeleton of the paper written. - **T−6 weeks:** full draft exists; video figure storyboarded. Video production, captioning, and consent checks for footage reliably take three weeks. - **T−3 weeks:** internal "mock 1AC" read by someone outside the project; fix the contribution statement before polishing prose. - **T−1 week:** run the `chi-submission` audit; upload a complete package to PCS and re-download it. PCS accepts revisions until the deadline, so upload early and overwrite. ## Pre-positioning for the five-week revision The revise-and-resubmit window cannot be extended, so buy time before it opens: ```text Before round-1 results arrive (October): [ ] Keep the study environment alive — do not archive the analysis pipeline, delete participant contact channels, or let IRB approval lapse; a small follow-up analysis is the most common revision request you can predict. [ ] Pre-agree author availability for the five weeks around Nov-Dec. [ ] Set up the tracked-changes toolchain now (latexdiff or Word tracking) so day 1 of the window is spent revising, not configuring. [ ] Draft the response-letter template with one section per reviewer. ``` If invited, treat it as a real second round, not a formality: at CHI as much as half of revised papers can still be rejected at the PC meeting (the posted process warns up to 50%; at CHI 2026, 65.5% of resubmissions were accepted). See `chi-author-response`. ## The post-acceptance chain is longer than at most venues Acceptance in December starts a four-deadline pipeline — TAPS source (January), publication-ready PCS package with accessibility metadata (February), registration and the presentation video (March), then the conference (May). Each has a different owner and a different failure mode; assign names in December, not February. Details in `chi-camera-ready`. ## Risk register for the cycle | Risk | Window | Mitigation | |---|---|---| | Study slips past May | Spring | Cut scope to a short paper rather than submit thin data | | Video figure unfinished at deadline | September | Storyboard at T−6 weeks; captions are mandatory work, not polish | | Round-1 invite lands during travel/holidays | Oct–Dec | Availability pact signed in October | | Requested analysis impossible (data deleted, IRB lapsed) | Nov | Keep the pipeline warm until December 17 | | TAPS rejects source formatting | January | Compile on the ACM class early; do not hand-hack the PDF | | Missing alt text blocks publication-ready sign-off | February | Write figure descriptions during drafting, not after acceptance | | Nobody registered by March 4 | March | Registration owner named at acceptance | ## If the December answer is no Rejected CHI papers have a well-worn afterlife: the reviews map cleanly onto CSCW (different deadline rhythm), DIS, IUI, or a TOCHI journal submission where length limits will not pinch. Do the re-route triage within two weeks of the decision while the reviews are fresh — see the venue table in `chi-topic-selection` — and log which criticisms were CHI-specific versus substantive. ## Output format ```text [Cycle] CHI 2027 (papers due 2026-09-10; verified 2026-07-08, reverify live) [Today → next gate] [Stage owners] submission: / revision: / TAPS: / registration: [Top calendar risk] [Fallback venue] ```