--- name: conext-workflow description: Use when planning an ACM CoNEXT campaign backward from a deadline, covering the choice between the December and June submission cycles, the mandatory registration step, the one-shot major-revision window, the reproducibility badge opt-in due at submission, PACMNET camera-ready, and presentation — all on CoNEXT's distinctive two-cycles-per-year calendar. --- # CoNEXT Workflow Plan the whole campaign backward from the cutoff. CoNEXT's defining feature is **two submission cycles a year** — a **December** deadline and a **June** deadline — both feeding one annual program and one rolling PACMNET volume. The first decision is therefore not "when do I write?" but "which cycle am I targeting, and is my evidence ready for it?" Every date below is the CoNEXT 2026 snapshot read on 2026-07-09 (see [`../../resources/official-source-map.md`](../../resources/official-source-map.md)); reopen the live Important Dates page before committing. ## Choose the cycle ```text [December cycle] register 5 Dec 2025 -> submit 12 Dec 2025 -> early-reject Feb 2026 -> notify 31 Mar 2026 -> camera-ready 30 Apr 2026 -> June 2026 PACMNET issue (major revision path) revision due 29 May 2026 -> resubmit 5 Jun 2026 -> camera-ready 31 Jul 2026 [June cycle] submit 5 Jun 2026 -> (its own review round, notification, and later PACMNET issue) ``` - Target the **nearer honest deadline** your evidence is actually ready for. A half-finished testbed campaign rushed into December scores worse than a complete one in June. - If you earn a one-shot major revision in the December cycle, the resubmission lands in the spring — so the two cycles are two entry points into the same program, not two separate conferences. - Both cycles publish in **PACMNET**; the issue you land in depends on your cycle and revision path. ## Backward plan from a chosen cutoff (T = submission day) ```text T minus 12-16 weeks Lock the contribution and the evaluation platform (testbed/deployment/trace). Run conext-topic-selection: CoNEXT vs SIGCOMM/NSDI/IMC, and December vs June. T minus 8-12 weeks Build evidence with conext-experiments + conext-reproducibility. Pin traces, configs, firmware/OS versions NOW — they cannot be reconstructed later. T minus 4-8 weeks Draft against conext-writing-style and the worked example. Positioning with conext-related-work. Decide the body/appendix/artifact split (conext-supplementary). T minus 2 weeks Freeze the body. Build the anonymized artifact. Decide badging. T minus 1 week REGISTER (title/abstract/authors/conflicts). OPT IN for the reproducibility badge before the submission deadline if you want it. T minus 1-2 days conext-submission end to end: acmart budget, double-anonymous sweep, HotCRP fields, conflicts. T Submit; re-download and read the uploaded PDF cold. ``` ## After submission ```text [Early-reject window] Some cycles notify clearly-below-bar papers partway through. No action but to plan the next cycle or a sibling venue if it comes. [Reviews / discussion] Two rounds + TPC meeting. Prepare an initial rebuttal if the cycle offers one (conext-author-response, Turn 1). [Decision] Accept / Reject / one-shot major revision. [One-shot revision] ~2 months to address the minimum-necessary changes; same reviewers re-read once; a shepherd checks the changes (conext-author-response, Turn 2). [Accept] Camera-ready to acmart + PACMNET metadata (conext-camera-ready). If you opted in, send the one-page artifact description within a week (conext-artifact-evaluation). [Reject] No appeal. Reroute via conext-topic-selection to a sibling venue or the other CoNEXT cycle, revised. ``` ## Roles and hand-offs - **Registration owner** — one author confirms title/abstract/authors/conflicts before the earlier registration cutoff; a missed registration means no submission slot. - **Artifact owner** — pins traces/configs and stages the anonymized artifact; owns the badge opt-in before submission and the one-page description after acceptance. - **Anonymity owner** — runs the double-anonymous sweep on the final PDF, figures (topologies!), and archive, and on the major-revision response letter. - **Shepherd liaison** — after a revision or conditional accept, the corresponding author tracks each required change to a tracked edit for the shepherd. ## Calendar hygiene - Confirm **both** cycles' exact dates and time zones each year; CoNEXT re-posts them per edition. - Do not assume the December and June cycles share every rule (page budget, revision window); verify the one you are in. - Watch the co-located **Student Workshop** and any workshops if a shorter or student-facing venue fits ongoing work better (see [`conext-topic-selection`](../conext-topic-selection/SKILL.md)). ## Output format ```text [Target] CoNEXT , cycle, submission [Backward plan] [Risk] [Post-submission] ```