--- name: eurosys-topic-selection description: Use when deciding whether a systems project belongs at EuroSys — the ACM SIGOPS-Europe flagship spanning OS, distributed systems, storage, cloud, virtualization, security, and ML systems — or routes better to SOSP, OSDI, NSDI, ASPLOS, ATC, FAST, or SoCC, and how the April slot and dual deadlines affect that call. --- # EuroSys Topic Selection Use this before serious writing begins. EuroSys is the flagship conference of the European Chapter of ACM SIGOPS (`eurosys.org`, rendered 2026-07-08), running annually since 2006 and seeking papers on **all areas of computer systems** — it is a broad-church systems venue, not a niche. The 2026 edition (the 21st) met in Edinburgh in April; 2027 meets in Rabat. The right question is rarely "is this systems?" but "is this *conference-grade* systems, and is EuroSys the best-positioned jury and calendar slot for it?" ## The substance bar A EuroSys-ready project typically has all four: - **A built thing.** An implemented system or substantial modification, not a simulation of one (measurement and experience papers are the exception, and must be framed as such). - **A transferable idea.** An abstraction, mechanism, or empirically established principle that outlives this codebase. - **Evidence under realistic conditions.** Workloads and scale that resemble the deployment story being told. - **An articulable insight.** One sentence a reviewer can carry into the PC meeting. Strong engineering without a nameable idea routes to ATC-style venues or an experience track. ## Routing from the EuroSys seat | Center of gravity | Stay or route | Why | |---|---|---| | OS/kernel, runtimes, virtualization, distributed infra | EuroSys core | The venue's home ground since 2006 | | ML systems (serving, training infra) | EuroSys core, growing | Recent best papers are LLM-serving systems (e.g., EuroSys '25) | | Once-a-generation OS-principles result | Consider SOSP/OSDI too | Same-family flagships; route by cycle timing and audience | | Network protocols, measurement of networks | NSDI / SIGCOMM | EuroSys reads it as out-of-center networking | | Hardware/software interface, arch mechanisms | ASPLOS | Architecture jury evaluates architecture ideas | | Storage-stack internals | FAST first | Deepest storage jury; EuroSys viable for broader claims | | Cloud-native ops, serverless economics | SoCC / Middleware also viable | Match the paper's altitude to the jury | | Pragmatic engineering, tool papers | USENIX ATC | Idea-density bar differs there | Two calendar facts sharpen the call: EuroSys's April conference and dual gates (May and September submissions for 2027) interleave with the SOSP/OSDI and NSDI cycles, so a systems result can almost always find a flagship gate within a few months — pick by *fit and readiness*, never by whichever deadline is nearest. And a EuroSys rejection blocks the same round for a year, which makes premature submission genuinely expensive. ## Fit self-interrogation ```text 1. Insight test: state the idea in one sentence without naming your system. 2. Jury test: which three published papers would this one sit between? If ≥2 are EuroSys/SOSP/OSDI papers, EuroSys is plausible. 3. Evidence test: does the current evaluation reach the four-layer stack (end-to-end / decomposition / cost / boundary)? If not, is it reachable by the target gate? 4. Regime test: is the claim's deployment story credible to reviewers who run real infrastructure? 5. Calendar test: which gate (spring/fall) matches the project's maturity, accounting for the one-year ban if it fails? ``` ## Contribution shapes EuroSys publishes The exemplars library (`resources/exemplars/library.md`) documents these shapes across two decades of the venue's own award line: | Shape | Award-line instance | What it must bring | |---|---|---| | General abstraction + engine | Dryad (2007) | Proof the abstraction subsumes existing practice | | Tool with a thesis | Coccinelle line (2008) | Validation on the real ecosystem it targets | | Small mechanism, big evidence | Delay Scheduling (2010) | Production-shaped workloads carrying a simple idea | | Design-space taxonomy | Omega (2013) | Vocabulary plus trace-driven comparison | | Production retrospective | Borg (2015) | Transferable lessons including failures | | ML-infrastructure mechanism | CacheBlend (2025) | A systems idea legible without ML expertise | If the project matches none of these shapes, that is not disqualifying — but it should prompt a harder look at what the contribution *type* is before a EuroSys jury is chosen for it. ## Signals you are forcing it - The contribution sentence contains "we combine" and three technique names but no invariant or tradeoff. - The evaluation exists only at benchmark scale while the pitch is production scale. - The nearest related work is entirely from another community's venues — the jury you are choosing has no vocabulary for the delta. - The plan is "submit to fall EuroSys because SOSP just closed" — deadline proximity masquerading as venue fit. ## When EuroSys is the *strategically* right flagship Beyond raw fit, three situations tilt toward EuroSys among the systems flagships: - The work speaks to infrastructure and communities strongly represented on European PCs (e.g., European cloud/telecom operators, EU data-locality constraints) and benefits from that jury's context. - The project's maturity curve matches a EuroSys gate now, and waiting for another flagship's next cycle risks being scooped by a fast-moving line of work. - The team wants the artifact culture: sysartifacts badges plus a named artifact award make EuroSys a strong home for systems whose artifact *is* part of the contribution. ## Output format ```text [Verdict] EuroSys-ready / EuroSys-plausible after gaps / route elsewhere [Insight sentence] [Neighbor triangulation] [Best-fit gate] spring / fall 2027+ with readiness rationale [If routing away] ```