--- name: fse-workflow description: Use when planning an ESEC/FSE project timeline from venue fit through paper registration, submission, the journal-style Major Revision round, artifact evaluation, PACMSE camera-ready, and presentation, with backward-planning offsets for an empirical-SE paper and honest handling of the single-annual-deadline cycle and cycle-hopping. --- # FSE Workflow Use this as the project-management skill for an FSE submission. Replace every date with the current official timetable and work backwards from the HotCRP registration cutoff — which precedes the paper deadline. FSE publishes in **PACMSE**, so plan for a possible **Major Revision** round inside the review year, not just an accept/reject. FSE is a conference whose papers are journal articles: it has **no standing editor-in-chief** and **no article-processing charge**. Rotating leadership is the per-edition General and Program/Review Co-Chairs (FSE 2026 General Chairs: Shin Hwei Tan and Foutse Khomh, verified 2026-07-09), and the cost model is registration, not APCs — PACMSE is open access. Chairs rotate yearly; re-check the organizing-committee page rather than carrying a name forward. ## Milestones - **Venue fit:** confirm FSE over ICSE/ASE/ISSTA and confirm the paper is ready this cycle (`fse-topic-selection`). - **Evidence lock:** freeze research questions, subject systems, baselines, statistics, threats, and the artifact contents. - **Registration:** submit real title, abstract, authors, topics, and conflicts by the earlier registration deadline (FSE 2026: 4 Sep 2025). - **Submission:** upload the anonymized PDF and Data Availability statement (FSE 2026: 11 Sep 2025; FSE 2027: 2 Oct 2026). - **Reviews:** triage each comment by criterion (significance, soundness, evidence, threats, clarity, open-science). - **Major Revision (if issued):** execute a tracked-change revision plus an anonymous, point-by- point response, re-read by the original reviewers. - **Decision:** archive reviews, response, and every submitted version. - **Acceptance:** prepare the PACMSE camera-ready, pursue ACM artifact badges on the artifact track's own deadline, register, and present. ## Backward plan from the submission deadline | Weeks out (heuristic) | Empirical-SE milestone | |---|---| | 10+ | Research questions fixed; subject systems and baselines chosen | | 8 | Data collection / experiments complete; provenance and seeds logged | | 6 | Analysis done; effect sizes and tests computed; threats drafted alongside results | | 4 | Full draft in the ACM template; artifact assembled and anonymized | | 3 | Internal mock review by an SE-empiricist reader | | 2 | Threats hardened, related-work delta sharpened, page budget met | | 1 | Anonymity sweep on PDF and artifact; Data Availability statement final | | 0 | Registration by its earlier cutoff, then paper + artifact link on HotCRP | These offsets are planning heuristics only — anchor every one to the current Important Dates page, never to a previous cycle's calendar. ## Cycle-hopping: the honest calendar reality FSE runs (currently) a single annual research deadline. As of 2026-07-09, FSE 2026 is in progress in Montreal, so the live next target is **FSE 2027** (Shenzhen; deadline 2 Oct 2026). Two planning consequences: - **A Major Revision that cannot be finished in the window** may, depending on the year's rules, be resubmittable to the next FSE cycle rather than lost — but this is exactly the kind of policy that changes per edition, so verify it before relying on it. - **Missing the annual deadline costs roughly a year** at FSE; a sibling flagship (ICSE/ASE/ISSTA) or an SE journal may have a nearer date — factor that into routing rather than idling. ## Failure modes by stage - **Evidence still moving at week 4** forces last-minute analysis nobody has audited — the classic soundness reject in the making. - **Leaving the anonymized artifact to the final week** is how a data-availability link or a lab-named tool leaks identity under heavy anonymity. - **Skipping the mock review** forfeits the one chance to hear "your baseline is unfair" from a friend instead of a reviewer. - **Treating a Major Revision as a formality** and under-budgeting the revision window turns a winnable R&R into a reject. ## Coordination notes - Assign one owner for the Data Availability / artifact and another for the anonymity sweep; shared ownership is how both slip. - Archive the exact submitted PDF, artifact, and (later) response letter — the revision round must quote them precisely and stay anonymous. ## Output format ```text [Current stage] idea / evidence / writing / registration / submitted / major revision / accepted [Next official deadline] [Critical path] [Risk register] [Owner map] person or role> ```