--- name: hpca-workflow description: Use when planning an HPCA project timeline from venue fit through the two-step July registration and paper gate, the autumn review wait, the single rebuttal/revision window, notification, IEEE camera-ready, artifact evaluation, and the February/March talk, with backward-planning offsets for a hardware-evaluated paper. --- # HPCA Workflow Use this as the project-management skill for an HPCA submission. Replace every date with the current official timetable and plan backward from the late-July gate. HPCA is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. It is run by the IEEE-CS Technical Committee on Computer Architecture (TCCA); the rotating leadership is the per-edition General and Program Chairs (HPCA 2027 program chairs were reported as Aamer Jaleel and Mattan Erez — 待核实), and the cost model is registration fees. Chairs rotate yearly, so re-check the current organization page rather than carrying a name forward. ## The shape of the HPCA year HPCA sits in the **winter seat**: a **late-July deadline** feeds an **autumn review** and a **February/March conference**. It is the last major architecture deadline of the summer, so a project that misses it waits for MICRO's spring gate or ISCA's November gate — plan the fallback before you need it. ## Milestones - **Venue fit:** confirm a measured microarchitectural cost meets a buildable mechanism whose behavior is the contribution. - **Evidence lock:** freeze the mechanism, the simulator/silicon configuration, workloads, sampled regions, baselines, and the artifact mirror. - **Registration step:** submit real title, abstract, authors, topics, and complete conflicts about a week before the paper. - **Paper step:** upload the anonymous IEEE-template PDF and all HotCRP fields. - **Review wait:** triage reviews for correctness, methodology, novelty, and reproducibility concerns as they land. - **Rebuttal/revision window:** respond and revise in one combined window (recent cycles run a single window, not two rounds). - **Notification → acceptance:** archive reviews, the response, and the submitted versions; then IEEE camera-ready, artifact evaluation on the AE HotCRP, and the winter talk. ## Backward plan from the paper deadline | Weeks out (heuristic) | Hardware-evaluated milestone | |---|---| | 8+ | Mechanism implemented; fidelity contract (tool, config, workloads) fixed | | 6 | Baseline sweeps complete; per-workload results, not just means | | 4 | Real-silicon or validated-simulator numbers logged with machine state | | 3 | Full draft in the IEEE two-column template | | 2 | Internal mock review by an architecture-minded reader | | 1 | Reference author-list check, anonymity sweep, artifact mirror assembled | | 0 | Registration then paper on HotCRP | These offsets are planning heuristics — anchor every one to the current official timetable, never to a previous cycle. ## Failure modes by stage - Infrastructure still churning at week 4 forces last-minute configuration changes no one has validated — the classic HPCA methodology reject in the making. - Leaving template conversion to the final week surfaces overflow late; two-column architecture figures are tighter than a working draft's. - Skipping the mock review forfeits the only chance to hear "your baseline is under-tuned" from a friend rather than a reviewer. - Building the artifact mirror after the deadline under pressure is how anonymity leaks and un-pinned simulators ship. ## Coordination notes - Assign one named owner for the fidelity contract and another for the anonymity sweep; shared ownership is how both slip. - Archive the exact submitted PDF, the artifact mirror, and the configuration files, since rebuttal replies must quote them precisely. ## Output format ```text [Current stage] idea / evaluation / writing / registration / paper / window / accepted [Next official deadline] [Critical path] [Risk register] [Fallback venue] [Owner map] person or role> ```