--- name: icassp-author-response description: Use when drafting an ICASSP rebuttal or author response to reviews, covering the recently added and short author-response window, the single-blind setting where reviewers already know you, answering signal-processing reviewers from the four-page record without a revised PDF, and writing for the technical-committee decision rather than for tone. --- # ICASSP Author Response Use this after ICASSP reviews are released. First confirm whether the current cycle even runs a rebuttal: ICASSP historically had **no** author-response stage, and a short window is a comparatively **recent addition** (in the 2026 cycle authors could reply until ~22 December 2025). Reopen the current call before promising reviewers anything. ## What the rebuttal is and is not - It is a **short, text-based reply** to the reviews, not a chance to upload a revised PDF or new experiments. Argue from what you already submitted. - ICASSP is **single-blind**, so the reviewers know your identity; write professionally and do not attempt to re-establish anonymity or drop identifying hints to sway a reviewer. - The audience is the **area/technical-committee decision**: give whoever aggregates the reviews a clean reason to accept, not a point-by-point defense that wins arguments but not the paper. ## Triage before drafting 1. Separate **factual errors in the review** (a metric misread, a missed baseline that is in the paper) from **legitimate gaps** (a missing comparison, an unreported condition). 2. Fix the factual errors first with an exact pointer: "Table 2, row 3 already reports this." 3. For real gaps, concede cleanly and scope a **camera-ready** clarification that adds no unsupported new claim — the four pages you submitted are the evidence of record. 4. Rank concerns by decision weight; one resolved correctness objection outranks five answered style notes. ## Signal-processing reviewer pushback patterns | Pushback | What it signals | ICASSP-ready fix | |---|---|---| | "The baseline is not the current strong method" | Reviewer knows the task's state of the art | Name the specific stronger baseline you did compare, or concede and scope it for camera-ready | | "Which SNR / condition does this hold at?" | The reported number hides its operating point | Point to the sweep or table cell; if only one condition was tested, say so plainly | | "Metric is not the one this task uses" | Measurement mismatch (e.g., accuracy where SI-SDR belongs) | Report the field-standard metric if you have it, or explain why yours is defensible | | "No significance / spread over runs" | One-seed result | Cite the multi-run spread if present; otherwise concede it as a limitation | | "This is a known result / prior art" | Novelty challenge | Cite the exact delta versus the named prior work in one sentence | ## Drafting pattern 1. Open with the single most decision-critical correction or concession. 2. Anchor each point to an exact location in the submitted paper (table, figure, equation, line). 3. State the signal-processing consequence, not just the fact. 4. Promise only camera-ready wording or clarification fixes that stay within the accepted claim. ## Micro-example Reviewer objection: the enhancement gain is reported only at one SNR, so the improvement may not generalize. Reply skeleton: 1. Concede the main table fixes SNR at one value for space. 2. Point to Fig. 3, which already sweeps 0-15 dB and shows the gain persists. 3. Note the trend is monotone, so the single-SNR table is representative, not cherry-picked. 4. Offer one camera-ready sentence stating the operating range explicitly. ## Calibration for a short window - Reply **early**; ICASSP rebuttal windows are brief and a late, exhaustive reply is worth less than a prompt, precise one. - Do not paste new derivations or fresh result tables the reviewers cannot verify against the submitted PDF. - Keep within any stated length/format cap; if none is stated, be concise anyway — committee members read many rebuttals in one sitting. ## Output format ```text [Rebuttal exists?] yes (dates) / no this cycle / unverified [Priority issue] [Decision dimension] correctness / novelty / evidence / clarity / metric-fit [Draft response] [Evidence anchor] [Camera-ready promise] ``` ## Currency note The 2026 rebuttal window (reported open to ~22 December 2025) was checked 2026-07-09 via official-page renderings (see `../../resources/official-source-map.md`). Whether a rebuttal recurs, and its dates and length, are cycle-specific — verify on the current call before drafting.