--- name: icassp-workflow description: Use when planning an ICASSP project timeline — the annual clock from venue fit through the September paper deadline, single-blind review, the short winter rebuttal, spring notification, IEEE Xplore camera-ready, and the May conference — with backward-planning offsets and the choice among standard, OJSP-ICASSP, and grand-challenge tracks. --- # ICASSP Workflow Use this as the project-management skill for an ICASSP submission. Replace every date with the current official timetable and work backward from the paper deadline. ICASSP is an **IEEE Signal Processing Society conference**, rebuilt by a new local committee each year; it has no standing editor-in-chief, and the cost model is registration, with the proceedings paper published in IEEE Xplore. ## The annual clock (2026-cycle shape, verify each year) - **September** — full-paper deadline on the CMS portal (ICASSP 2026: 17 Sep 2025; **ICASSP 2027 reported ~16 Sep 2026, the next major gate as of 2026-07-09**). - **Autumn/early winter** — single-blind technical-committee review. - **December** — short rebuttal/author-response window (2026 cycle: reported to ~22 Dec 2025), if the cycle runs one. - **Late winter** — notification; accepted-paper revision window (2026: to ~28 Jan 2026). - **Spring** — IEEE Xplore camera-ready (PDF eXpress + IEEE copyright form), registration. - **May** — the conference; in-person oral or poster presentation (ICASSP 2026 Barcelona, 4-8 May; ICASSP 2027 Toronto, 16-21 May). ## Milestones - **Venue fit** — confirm the contribution is genuinely signal-processing and ICASSP-routed, not a generic-ML paper or a speech paper better suited to Interspeech (see `icassp-topic-selection`). - **Evidence lock** — freeze the mechanism, the task-matched metric, the standard baseline, the condition sweep, and seeds. - **Paper deadline** — upload the 4+1 PDF with the author list (single-blind), EDICS, and the ethical-standards statement through CMS. - **Rebuttal** — if it runs, reply early and move the one decision-critical objection. - **Notification and camera-ready** — integrate reviewer fixes within the accepted claim, pass PDF eXpress, sign the copyright form, register. - **Conference** — present in person; ship the public artifact. ## Backward plan from the September deadline | Weeks out (heuristic) | Milestone | |---|---| | 8+ | Mechanism frozen; standard corpus and scorer chosen | | 6 | Baseline reproduced on the same corpus/split/scorer | | 4 | Condition sweep and ablation complete, seeds logged | | 3 | Full draft sitting in the IEEE 4+1 two-column template | | 2 | Internal mock review by a subfield-fluent colleague | | 1 | PDF eXpress pass, author-block/ethics check, figure legibility | | 0 | Upload via CMS; download and re-read the stored PDF | These offsets are planning heuristics — anchor each to the current official timetable, never to a past cycle. ## Track decision (decide before the deadline) ```text Standard 4+1 -> TPC review, IEEE Xplore proceedings, in-person present OJSP-ICASSP 8+1 -> OJSP editorial review, open-access journal, present (not in proceedings), earlier pre-registration deadline SPS-journal present -> already-accepted SPS-journal paper, not re-reviewed, not in proceedings Grand Challenge -> short paper via the challenge, present, may appear in proceedings ``` ## Failure modes by stage - Choosing the corpus or metric late forces a scramble that a subfield reviewer sees through. - Leaving format conversion to the final week surfaces four-page overflow too late; IEEE two-column is tighter than a working draft. - Skipping the mock review forfeits the one chance to hear "that is the wrong metric for this task" from a friend rather than a reviewer. - Missing a track's separate earlier deadline (OJSP pre-registration, grand challenge) forecloses the best-fit path. ## Coordination notes - Assign one named owner for the CMS submission (format, EDICS, metadata) and another for the reproducibility package; shared ownership is how both slip. - Archive the exact submitted PDF, since a rebuttal must quote it precisely. ## Output format ```text [Current stage] idea / experiments / writing / submission / rebuttal / accepted / camera-ready [Next official deadline] [Track] standard / OJSP-ICASSP / journal-present / grand-challenge [Critical path] [Owner map] person or role> ``` ## Currency note The 2026-cycle dates and the ICASSP 2027 September gate were checked 2026-07-09 (see `../../resources/official-source-map.md`); the 2027 exact deadline is 待核实 until its CFP is readable directly. Nothing carries from Barcelona to Toronto automatically — re-open the current call.