--- name: icdm-workflow description: Use when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlines, the long summer wait to the August notification, the no-rebuttal review, the possible short-paper acceptance branch, IEEE camera-ready, and in-person presentation on a single annual deadline. --- # ICDM Workflow Use this as the project-management skill for an ICDM submission. ICDM runs a **single annual deadline**, so the plan is a one-shot sprint to June and then a long wait, not a KDD-style cycle loop. Replace every date with the current edition's official timetable and work backwards from the paper deadline. ICDM is an IEEE conference, not a journal: there is no standing editor-in-chief and no article-processing charge. The rotating analogue is the per-edition **General Chairs and Program (PC) Co-Chairs**, appointed anew each year (2026 chairs 待核实 on the committee page); the cost model is **registration**, and at least one author must present in person for the paper to appear in the IEEE proceedings. ## Milestones (2026 anchors — verify live) - Venue + track fit: confirm Research vs Applied vs Blue Sky (see `icdm-topic-selection`). - Evidence lock: freeze the mining task, mechanism, baselines, ablations, and scaling runs. - Abstract deadline (2026-05-30): register real title, abstract, authors, topics. - Full-paper deadline (2026-06-06, AoE): upload the anonymized 10-page PDF (Research). - The summer wait: reviews proceed triple-blind with, traditionally, **no rebuttal**. - Notification (2026-08-16): Accept / Accept-as-Short / Reject. - Camera-ready: IEEE eCopyright, de-anonymization, in-person registration. - Conference (Nov 12-15, Shenyang): present; the paper enters IEEE Xplore. ## Backward plan from the June paper deadline | Weeks out (heuristic) | Data-mining-methods milestone | |---|---| | 8+ | Mechanism fixed; mining task and baselines chosen | | 6 | Ablations designed to isolate the mechanism | | 4 | Scalability runs complete, seeds logged | | 3 | Full draft compiled in IEEE two-column, measured against the 10-page all-inclusive cap | | 2 | Internal mock review by a data-mining-minded reader | | 1 | Triple-blind sweep, anonymized artifact export, appendix trimmed inside the cap | | 0 | Abstract, then full paper on the submission system before AoE | These offsets are heuristics — anchor every one to the current official timetable, never a prior edition's calendar. ## The two ICDM-specific branches - **No-rebuttal posture.** Plan as if you will get no chance to reply after reviews. That means the submitted PDF and its cited anonymized repository must pre-answer the obvious reviewer questions. If the current edition *does* open a response window, treat it as a bonus, not the plan (see `icdm-author-response`). - **Short-paper branch.** Acceptance may arrive as "accepted as a short paper." Keep a compression plan ready: which sections collapse, which results move to the repository, and how the contribution survives at short-paper length (see `icdm-camera-ready`). ## Failure modes by stage - Treating the appendix as free space and discovering at week 1 that references plus appendix push the PDF past 10 pages — a no-review reject born of planning, not science. - Building the anonymized artifact after the deadline, under time pressure, is how a triple-blind identity leak ships. - Assuming a rebuttal exists and leaving a known weakness "for the response" that never comes. - Forgetting the in-person presentation requirement until camera-ready, when travel and registration logistics are hardest. ## Coordination notes - Assign one owner for the triple-blind sweep and another for the 10-page arithmetic; shared ownership is how both slip. - Archive the exact submitted PDF and anonymized repository; if a response window opens, replies must quote them precisely. - Diarize the August notification date so the short-paper branch can start immediately. ## Output format ```text [Current stage] fit / experiments / writing / abstract / submission / waiting / decision / camera-ready [Track] Research / Applied / Blue Sky [Next official deadline] [Critical path] [Risk register] <10-page cap / anonymity / scale evidence / no-rebuttal exposure / presentation> [Branch readiness] short-paper compression plan: ready / not ready ```